Permit Information
Permit NumberBLD03-00830
StatusFinaled
Name CHINA BLUE BAR
Site Address 100 S 6TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(CHINA BLUE BAR) The building is fire sprinklered for story increase and because the fire area exceeds 5,000 square feet and the occupant load exceeds 300. To remodel an existing 18,348 square foot building (5,565 square foot basement, 8,006 square foot first floor, 4,777 square foot second floor) for a new bar. Existing historic construction is regulated by the 1994 Uniform Code for Building Conservation (UCBC). New construction shall comply with the 2000 International Building Code (IBC). All restaurant and kitchen uses are being abandoned. Work is to include a new structural moment frame, a new stairway from the basement to the first floor (stairway enclosed in a shaft), two new stairways from the second floor to the first floor, floor modification on the first and second floors, a restroom accessible to the disabled, and interior nonbearing walls all per appproved drawings, engineering, and plan review report on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/26/2009  
Case Summary (BLD)  1/26/2009  
Case Summary (BLD)  5/16/2007  
Permanent Occupancy 2/19/20042/19/2004 DONE
Details
FIRE-Final Inspection2/19/20042/19/20042/19/2004PPASS
DetailsRick Jackson
###-#### aaron
BLD-Final2/19/20042/19/20042/19/2004PPASS
DetailsDave Hannah
###-#### Aaron ok for perm occ 2/19/2004 2:39:25 PM
First Notice 2/19/20042/19/2004 DONE
Permanent occupancy  2/19/2004 DONE
Perm. Occ. Cert. # 10001 issued 2-19-04 to the China Blue Bar.
BLD-Conference2/17/20042/17/20042/17/2004PDONE
DetailsDave Hannah
five day notice given 2/17/2004 2:05:43 PM
(F) Reprint permit  2/11/2004 DONE
Temporary occupancy  8/13/2003 DONE
Temp. Occ. Cert. #4982 issued 8-6-03 to the China Blue Bar (entire bldg.)
FIRE-Final Inspection8/6/20038/6/20038/6/2003PPART
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungtemp occ approvede per Dave Miller pending resolution of fire sprinklers; need to complete emergency lighting in north hall; complete alarm per latest review 8/7/2003 9:21:19 AM
BLD-Final8/6/20038/6/20038/6/2003PPART
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...see c/n , ok for t/o 8/6/2003 6:27:33 PM
Inspection Record Card- Bld  8/5/2003 DONE
Print Occupancy Form  8/5/2003 DONE
BLD-Conference8/3/20038/4/20038/4/2003PPASS
DetailsCarl Dependahl
rec'd resub...ok 8/4/2003 4:15:51 PM
BLD-Conference7/29/20037/30/20037/30/2003PPASS
DetailsCarl Dependahl
Scott...need all finals for c/o. 7/30/2003 3:20:56 PM
BLD-Conference7/30/20037/30/20037/30/2003APASS
DetailsCarl Dependahl
ok to use occ. loads as clouded on plans....49" wide foyer ok at main st side per Carl Westfall...resub. pending7/30/2003 10:39:01 AM 7/30/2003 10:41:36 AM
BLD-Framing/Rough-in7/28/20037/29/20037/29/2003APART
DetailsCarl Dependahl
AARON...need all as-builts...floor cavities have been filled w/ insulation mat'l as req'd 7/29/2003 1:44:36 PM
BLD-Conference7/29/20037/29/20037/29/2003PPASS
DetailsCarl Dependahl
aaron...occ. loads... 7/29/2003 3:33:44 PM ok per Carl Westfall...as 1st set of numbers on plans. 7/29/2003 3:37:39 PM
FIRE-Final Inspection7/28/20037/28/20037/29/2003PFAIL
DetailsRick Jackson
###-#### not a final; verified insulation in two cavities - okay to cover - area by main entry at dance floor extension and on stage on second floor 7/29/2003 5:06:29 PM
BLD-Final7/28/20037/28/20037/28/2003PFAIL
DetailsCarl Dependahl
###-####...c/n, n/r... 7/28/2003 3:21:34 PM
FIRE-Conference7/23/20037/23/20037/23/2003PDONE
DetailsTroy Cobbley
Went over exit sign and emergency light locations for the second floor. Rick or I need to provide clarification on door magnets, releasing, to the members only area. Told Scott the contractor to provide fire extinguishers especially since welding is going on in building 7/24/2003 12:10:29 PM
BLD-Conference7/23/20037/23/20037/23/2003PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/23/2003 at 9:55:18 AM. Contact: ###-####...met w/ eng'r & contractor...need stamped eng'g for frame & stair modifications; arch to give as-builts 7/23/2003 3:58:56 PM
BLD-Framing/Rough-in7/21/20037/22/20037/22/2003PPART
DetailsCarl Dependahl
arron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok to cover walls & lid at back of 1st fl; cosult fire insp re platforms/sprinklers. Need resub for stairs. 7/22/2003 5:00:35 PM
BLD-Framing/Rough-in7/16/20037/17/20037/17/2003APART
DetailsCarl Dependahl
aaron; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows...c/n issued; need proper resub....ok to cover 1st fl lid 7/17/2003 3:35:21 PM
BLD-Conference7/10/20037/11/20037/11/2003APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/10/2003 at 4:38:53 PM. Contact: ###-####...need submit for stairs & star framing. 7/11/2003 7:00:07 PM
BLD-Conference7/1/20037/3/20037/3/2003PPASS
DetailsCarl Dependahl
Scott...need plan mod permit, install all rails
& doors as req'd 7/3/2003 4:18:00 PM
Temporary occupancy  7/3/2003 DONE
Temp. Occ. Cert. #4968 issued 7-3-03 to the China Blue Bar - basement only.
BLD-Conference6/30/20037/1/20037/1/2003PPASS
DetailsCarl Dependahl
keep c/n, fireblocks installed, reinstall door at stair enclosure, firestop penetrations...reinstall temp rails as permanent; provide copy of as-built re rails & platform at basement. 7/1/2003 1:24:35 PM 7/1/2003 1:24:54 PM
BLD-Final6/26/20036/27/20036/27/2003PPART
DetailsCarl Dependahl
###-#### SCOTT BASEMENT ONLY ...c/n, ok for t/o 6/27/2003 6:15:07 PM
FIRE-Final Inspection6/26/20036/27/20036/27/2003APART
DetailsRick Jackson
basement only okay 6/30/2003 9:00:42 AM
BLD-Framing/Rough-in6/26/20036/27/20036/26/2003ACANC
DetailsCarl Dependahl
scott
BLD-Framing/Rough-in6/25/20036/26/20036/26/2003PNR
DetailsCarl Dependahl
scott...keep c/n, get modification per 6/26/2003 5:27:38 PM mit 6/26/2003 5:28:05 PM walk thru w/ fire insp. 6/26/2003 5:28:36 PM
FIRE-Conference6/25/20036/26/20036/26/2003APART
DetailsRick Jackson
###-#### scott met with carpenter about them wanting to open on 6/27 6/27/2003 11:55:43 AM
BLD-Framing/Rough-in6/26/20036/26/20036/26/2003AFAIL
DetailsCarl Dependahl
keep c/n, wip
Print Occupancy Form  6/26/2003 DONE
Plan assigned to (CJW)6/9/2003 6/26/2003 PASS
DetailsCarl Westfall
6/26/2003 16:06:19 CJW - activity updated through activity BLDA022 from case BLD03-00830.
Override - Parcel Holds  6/26/2003  
Override - Parcel Holds  6/26/2003  
Routing - PLAN CHECK6/9/2003 6/26/2003 PASS
(6-9-03) Plan modification sent to the consultant engineer. (6-26-03) Plan modification approved by the consultant structural engineer.
PLANS/APPL TAKEN TO FRONT DESK  6/26/2003 PASS
Plan modification approved. Drawings taken to the permits desk.
Telephone call  6/26/2003 DONE
plan mod ready
BLD-Conference6/25/20036/25/20036/25/2003PCANC
DetailsCarl Dependahl
SCOTT ###-####
BLD-Conference6/24/20036/25/20036/25/2003ANR
DetailsCarl Dependahl
###-#### scott
BLD-Conference6/25/20036/25/20036/25/2003PFAIL
DetailsCarl Dependahl
###-#### scott, c/n issued ...need trade insps, as builts, fireblocking, etc. has plan mod in for review. 6/25/2003 4:28:20 PM
Override - Parcel Holds  6/25/2003  
Override - Parcel Holds  6/25/2003  
Override - Parcel Holds  6/24/2003  
BLD-Footing6/10/20036/11/20036/11/2003APASS
DetailsDave Hannah
###-#### aaron four footing in basement engineer has been on site and reviewed changes made becouse of ext footings contractor will get a letter form him on inspection and approval to pour 6/11/2003 11:35:25 AM
Override - Parcel Holds  6/10/2003  
Plans ACCEPTED BY PLAN TECH  6/9/2003 DONE
Plan Modification
Plan routing begun/TENANTS  6/9/2003 DONE
Plan Modification
BLD-Conference6/5/20036/5/20036/5/2003PPASS
DetailsCarl Dependahl
w/ Riley Mahaffey & John Price re proposed struct change...referred to Westfall... 6/5/2003 3:07:14 PM
Print Occupancy Form  6/3/2003 DONE
Telephone call  6/3/2003 DONE
permit ready
Issue PAID IN FULL permit  6/3/2003  
CHANGE ISSUED DATE  6/3/2003  
Plan assigned to (CJW)4/24/2003 6/2/2003 PASS
DetailsCarl Westfall
6/2/2003 16:25:25 CJW - activity updated through activity BLDA022 from case BLD03-00830.
Routing - PLAN CHECK5/23/2003 6/2/2003 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  6/2/2003 DONE
Received one set of revised sheet S1.0, S2.0, S2.1, S2.2 & S2.3. Routed to Carl W. kmm
PLANS/APPL TAKEN TO FRONT DESK  6/2/2003 PASS
Plan resubmittals received  5/29/2003 PASS
DetailsRita DeYoung
Response letter from Tamura, transmittal from LKV, Two sets of MO.2, M1.1, M1.2, M3.1, MC1.1, P1.2, AO.0, A2.1, A3.0, and taken to Carl W,
Routing Off Site - STRUCTURAL5/16/2003 5/27/2003 PASS
Contacted PDQ to take supplemental calculations to outside engineering. kmm
Structural design approved by the consultant engineer. CJW
Routing - FIRE5/13/2003 5/22/2003 PASS
Plan resubmittals received  5/16/2003 DONE
received letter of response from Tamura and two copies of Structural Calculations and taken to Carl
Plan resubmittals received  5/15/2003 DONE
Received one copy of suplemental structural claculations II. Routed to Carl W. kmm
Routing Off Site - STRUCTURAL5/12/2003 5/14/2003  
Contacted PDQ to take revised plans of 5/9/03 to outside engineering. kmm
Routing - PLAN CHECK4/30/2003 5/13/2003  
Failed first UBC plan review. UBC plan review started May 9, 2003 and finished May 13, 2003. A response from the architect was required. See the plan review report.
Plan resubmittals received  5/9/2003 DONE
Received two copies of revised sheets, S1.0, s2.0, s2.1, s2.2, s3.0, cover letter and two copies of supplemental struct. calcs. Routed to Carl.
Routing Off Site - STRUCTURAL4/22/2003 4/30/2003  
contacted PDQ to take to outside engineering
Routing - PLUMBING4/25/2003 4/29/2003 PASS
no vertical waste piping will be permitted on the combination waste ans vent system. pipe waste to an approved indirect waste receptor or vent. additional cross connection protection may be required
Routing - PUBLIC WORKS4/24/2003 4/25/2003 PASS
Plans ACCEPTED BY PLAN TECH  4/22/2003 DONE
Application received  4/17/2003  
Recd Pcfee & Taken To Pln CK  4/17/2003 DONE
Fee Review-notes4/17/20034/17/2003   
Routing Off Site - STRUCTURAL6/9/2003    
Plan modification. Contacted PDQ to take plans to outside engineering. kmm