Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00831
StatusFinaled
Name MIKE HILL
Site Address 6051 N STAFFORD PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3304 sq. ft. two story single family dwelling with a 723 sq. ft. attached three car garage, a 168 sq. ft. covered entry porch and free-form concrete patio at rear of structure (435 sq. ft. covered) per approved plans, all red-lining and attached requirement lists. (1st floor 2255 sq. ft.)(2nd floor 1149 sq. ft.) PC #217 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/23/20039/24/20039/24/2003APASS
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs
DOC - Permit Finaled9/24/20039/24/20039/24/2003APASS
DetailsJim Sly
Finaled by inspector at 9/24/2003 9:55:27 AM
BLD-Energy code compliance7/10/20037/11/20037/11/2003APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 7/10/2003 at 11:44:42 AM. Contact: ###-####.
BLD-Framing/Rough-in7/10/20037/11/20037/11/2003APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 7/10/2003 at 11:45:33 AM. Contact: ###-####.
BLD-Framing/Rough-in7/7/20037/8/20037/8/2003AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/7/2003 at 10:43:11 AM. Contact: ###-####. Complete corr. 7/8/2003 11:10:23 AM
BLD-Framing/Rough-in7/1/20037/3/20037/3/2003PFAIL
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N posted. 7/3/2003 3:51:25 PM
BLD-Framing/Rough-in6/18/20036/19/20036/19/2003PPART
DetailsJim Sly
mike shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK to cover....Need retro's at Gar front. 6/19/2003 4:12:21 PM
BLD-Foundation5/20/20035/20/20035/20/2003APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 5/20/2003 at 6:32:02 AM. Contact: ###-####. wip--25% ready at time of inspection. 5/20/2003 11:27:22 AM
BLD-Footing5/19/20035/19/20035/19/2003PPASS
DetailsJim Sly
###-#### curtis
Plan assigned to (DJO)5/5/20035/5/20035/15/2003 PASS
DetailsDan Overy
5/15/2003 16:15:29 DJO - activity updated through activity BLDA022 from case BLD03-00831.
Plan Reviewer's activity  5/15/2003 DONE
contractor and truss manufacturer came in to clarify truss layout. able to size beams with this information. ok to issue.
PLANS/APPL TAKEN TO FRONT DESK  5/15/2003 DONE
Case Summary (BLD)  5/15/2003 DONE
Plan Review Report  5/15/2003 DONE
Inspection Record Card- Bld  5/15/2003 DONE
Issue PAID IN FULL permit  5/15/2003 DONE
Plans ACCEPTED BY PLAN CHECK  5/5/2003  
Plan Reviewer's activity  5/5/2003  
Roof framing required. Truss manufacturer will drop layout and engineering.
Routing - PUBLIC WORKS4/21/2003 4/21/2003 PASS
Routing - PLANNING4/18/2003 4/21/2003 PASS
Application received  4/18/2003  
Routing - PLAN CHECK4/21/2003