Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/27/2004 | 4/26/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/24/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 1/18/2005 | | |
|
|
|
|
Permanent occupancy | | | 5/27/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10167 issued 5-27-04 to the Hyde Park Place parking garage.
|
Permanent Occupancy | | 5/26/2004 | 5/26/2004 | | DONE |
|
|
|
|
BLD-Final | 5/6/2004 | 5/7/2004 | 5/7/2004 | A | PASS |
Dave Hannah
|
|
|
Cathy has the card - David Southers, ###-#### ok for prem occ 5/7/2004 11:24:50 AM
|
Temporary occupancy | | | 4/9/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5100 issued 4-9-04 to Hyde Park Place parking garage.
|
FIRE-Final Inspection | 4/2/2004 | 4/5/2004 | 4/5/2004 | A | PASS |
Rick Jackson
|
|
|
darryl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 4/2/2004 | 4/5/2004 | 4/5/2004 | A | FAIL |
Dave Hannah
|
|
|
darryl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore doors closers ect 4/5/2004 12:43:36 PM
|
(F) Reprint permit | | | 12/9/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/6/2003 | | DONE |
|
|
|
|
BLD-Concrete | 8/25/2003 | 8/25/2003 | 8/25/2003 | P | PART |
Dave Hannah
|
|
|
DARRELL; Phone #: ###-#### Internet Inspection Request from: Darla Downspt deck srata on site looking at rebar and cables this is for the north half 8/25/2003 2:24:48 PM
|
BLD-Conference | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ Darrel re progress
|
BLD-Foundation | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | PART |
Carl Dependahl
|
|
|
titan construction; Phone #: ###-#### Internet Inspection Request from: Barbara Moorewall at south ok pend SI reports 6/25/2003 10:47:31 AM
|
BLD-Foundation | 6/24/2003 | 6/24/2003 | 6/24/2003 | P | PART |
Dave Hannah
|
|
|
darryl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore on site talked with supper strata is doing the spec inspection and they have been out several times and will final rebar placement befor placing concrete 6/25/2003 7:48:11 AM
|
BLD-Conference | 6/18/2003 | 6/18/2003 | 6/19/2003 | P | PASS |
Carl Dependahl
|
|
|
Darrel ###-#### ....re foundation issues... add'l insulation not req'd. 6/19/2003 2:32:50 PM
|
BLD-Footing | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | FAIL |
Tony Young
|
|
|
titan construction; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pending s. i. report,,, also need to have rebar lap per plans or letter from engineer stating lap is ok as built,,,,, 18" .vs 27" laps in tension rebar, as in footings 6/9/2003 2:38:54 PM
|
(F) Reprint permit | | | 6/9/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2003 | | DONE |
|
|
|
permit ready and need ACHD
|
Print Occupancy Form | | | 6/3/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/30/2003 | | 6/2/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2003 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/24/2003 | | 6/2/2003 | | PASS |
Mike Phillips
|
|
|
6/2/2003 15:26:56 M_P - activity updated through activity BLDA022 from case BLD03-00840.
|
Routing - Erosion and Sediment | 5/28/2003 | | 5/30/2003 | | FAIL |
|
|
|
No esc permit application attached to plan or narratives.
|
Plan resubmittals received | | | 5/30/2003 | | DONE |
|
|
|
received two copies of the esc plan.
|
Routing - Erosion and Sediment | 5/30/2003 | | 5/30/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 5/23/2003 | | 5/28/2003 | | PASS |
Brandi Dominguez
|
|
|
|
Routing - PLAN CHECK | 5/28/2003 | | 5/28/2003 | | |
|
|
|
Insert resubmittals and then route to plumbing.
Routing to plumbing.
|
Routing - PLUMBING | 5/28/2003 | | 5/28/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/27/2003 | | DONE |
|
|
|
Cover sheet for Sam Rogers. map for new hydrant location
|
Plan resubmittals received | | | 5/23/2003 | | DONE |
|
|
|
Received two copies of revised sheet A1.0 and one copy of cover letter to Dave M. Routed to Mike P. kmm
|
Routing Off Site - STRUCTURAL | 5/13/2003 | | 5/22/2003 | | PASS |
|
|
|
Architect dropped off plans at structural engineer for further review.
A few comment but no further review required.
|
Routing - PLANNING Land Div | 5/22/2003 | | 5/22/2003 | | DONE |
|
|
|
Deed recorded and new tax parcel number assigned.
|
Routing - FIRE | 5/15/2003 | | 5/22/2003 | | PASS |
|
|
|
Approved WITH CONDITION that the information required under the IFC review of Grading Permit BLD03-00884, must be received and approved prior to beginning any construction under this permit.
|
Plan resubmittals received | | | 5/16/2003 | | DONE |
|
|
|
received letter of response from Tamura & Associates, Transmittal letter, two copies of A2.0, two of P2.0, and P7.0 and taken to Mike P.
|
Routing - PLAN CHECK | 5/14/2003 | | 5/15/2003 | | PEND |
|
|
|
Plan review completed waiting for others to approve prior to issuing permit.
|
Routing - PLUMBING | 5/12/2003 | | 5/13/2003 | | FAIL |
|
|
|
refer to notes on bld03-00884
|
Plan resubmittals received | | | 5/12/2003 | | DONE |
|
|
|
Response letter from Tamura & Associates, two copies of response letters from Fine Engineering, two sets of A4.0, A4.3, SW0.1, SW2.1, S1.0, S2.0, S3.0, S4.0, S4.1, and taken to Mike P.
|
Routing - PLANNING | 5/5/2003 | | 5/9/2003 | | PASS |
|
|
|
5/6/03 - C U Passed by SAR.
5/9/03 - Approved per DRH02-221 (passed by MGS) for parking garage only.
|
Plan resubmittals received | | | 5/6/2003 | | DONE |
|
|
|
Received two copies of ESC plans and naratives to be put with parking garage plans. Routed to Mike P. kmm
|
Routing - Erosion and Sediment | 5/5/2003 | | 5/5/2003 | | FAIL |
|
|
|
Need complete package, ESC application, 2 sets of narrative, 2 full drawings.
|
Routing Off Site - STRUCTURAL | 4/25/2003 | | 5/2/2003 | | FAIL |
|
|
|
Waiting for soils report. contacted John P.
Additional information required for further review.
|
Routing - PUBLIC WORKS | 4/25/2003 | | 5/2/2003 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2003 | | DONE |
|
|
|
Received two copies of soils report. Routed one to John and put on with outside engineering copy. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2003 | | PEND |
|
|
|
Requires soils report (2 copies). Contacted John P.
|
Plan routing begun/NEW & ADDTN | | | 4/24/2003 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 4/24/2003 | | 4/24/2003 | | FAIL |
|
|
|
Need to record deed with metes and bounds description. Also need new tax parcel #.
No condominium plat has been submitted yet. April 24, 2003.
|
Application received | | | 4/18/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 4/18/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/18/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 4/18/2003 | | |
|
|
|
|
Fee Review-notes | 4/18/2003 | 4/18/2003 | | | |
|
|
|
|