Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00850
StatusFinaled
Name TREINEN JOHN G AND
Site Address 2009 E PARKSIDE DR
Project NameTreinen Remodel
Customer Number 
ePlanReviewNo
Description
9/26/2003 "THIS PERMIT IS AMMENDED TO REFLECT ADDED CONSTRUCTION TO THIS PROJECT OF A COVERED ABOVE GRADE UPPER LEVEL 175s.f. DECK.($5000 value added to project)"9/26/2003 This project is for the addition of 220s.f. of 2-story living space to an existing 2000s.f. 2-story single family dwelling. the addition will be of 110s.f. on each level, lower level to be a sunroom and the upper level to be an addition to the existing kitchen. R1B ok per sar. Separate electrical, plumbing, mechanical and esc permits are required. IECC requirements are that all glazing this area are to be min .40 u factor or submit full IECC Res Ckeck performance pack to the structural inspector at the framing inspartion. All per the approved plans as marked. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/16/20048/16/20048/16/2004PPASS
DetailsDave Hannah
sue -call 1st for access -15 min time frame please; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
PostCard Mailed  8/4/2004 SENT
PostCard has been mailed requesting inspection.
BLD-Framing/Rough-in10/29/200310/29/200310/29/2003PPASS
DetailsRuss Owen
deck -larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance9/29/20039/30/20039/30/2003APASS
DetailsSteven Webb
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Case Summary (BLD)  9/26/2003  
Inspection Record Card- Bld  9/26/2003  
PLANS/APPL TAKEN TO FRONT DESK  9/26/2003 DONE
Inspection Record Card- Bld  9/26/2003 DONE
Permit Ready to Issue  9/26/2003 DONE
Receive PAYMENT IN FULL PRINT  9/26/2003 DONE
CHANGE STATUS TO (ISS)  9/26/2003 DONE
BLD-Framing/Rough-in9/24/20039/25/20039/25/2003AFAIL
DetailsDave Hannah
###-#### larry ok to insulate lag bolt ledger ext deck floor joist add bearing blocks under post in kitchen fire block b vent at bathroom 9/25/2003 9:21:19 AM
BLD-Framing/Rough-in9/24/20039/25/20039/25/2003AFAIL
DetailsDave Hannah
###-#### larry ok to insulate fire blocking at b vent in bathroom also lag bolt ledger to rim old deck joist add blocking under post kitchen floor 9/25/2003 10:06:04 AM
BLD-Framing/Rough-in9/23/20039/24/20039/24/2003ACANC
DetailsDave Hannah
john- ###-#### or fr larry ###-#### -re-insp
BLD-Framing/Rough-in9/22/20039/23/20039/23/2003ACANC
DetailsDave Hannah
###-#### or ###-#### john
BLD-Framing/Rough-in9/23/20039/23/20039/23/2003PCANC
DetailsJim Storey
###-#### or ###-#### john
BLD-Framing/Rough-in9/18/20039/18/20039/18/2003PPART
DetailsDave Hannah
larry ; Phone #: ###-#### Internet Inspection Request from: Darla Downs shear ok to coverext need to get a permit for deck 9/18/2003 12:59:10 PM
BLD-Framing/Rough-in9/17/20039/17/20039/17/2003PNH
DetailsRuss Owen
larry sheer wall; Phone #: ###-#### Internet Inspection Request from: Marc Lileks. posted c/n no plans or people on site recall. 9/16/2003 11:52:06 PM
BLD-Foundation7/15/20037/15/20037/15/2003PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/15/2003 at 8:56:51 AM. Contact: ###-####.
BLD-Grading Inspection7/10/20037/10/20037/10/2003 DONE
DetailsRita DeYoung
footing subgrade approved by geotechnical engineer
BLD-Foundation7/7/20037/8/20037/8/2003ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/7/2003 at 1:42:21 PM. Contact: ###-####.
BLD-Footing7/8/20037/8/20037/8/2003APASS
DetailsDave Hannah
Print Pending Permit.LaserJet4  5/16/2003 DONE
Case Summary (BLD)  5/16/2003  
Inspection Record Card- Bld  5/16/2003 DONE
Issue PAID IN FULL permit  5/16/2003 DONE
Plan assigned to (PEP)4/18/2003 5/1/2003 PASS
DetailsPerry Paine
5/1/2003 08:40:09 PEP - activity updated through activity BLDA022 from case BLD03-00850.
Print Pending Permit.LaserJet4  5/1/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/1/2003 DONE
Plan Review Report  5/1/2003  
Routing - Erosion and Sediment4/18/2003 4/22/2003 PASS
plan waiver requested for ESC. ESC waiver approved with conditions attached to plans.
Application received  4/18/2003