Letter of compliance | | | 9/3/2004 | | DONE |
|
|
|
Letter of Compliance issued 9-3-04.
|
FIRE-Final Inspection | 4/14/2004 | 4/14/2004 | 4/14/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 4/14/2004 3:15:22 PM
|
Code Occupancy Approval | 4/14/2004 | 4/14/2004 | 4/14/2004 | A | PASS |
Scott M.Brown
|
|
|
ALL IN AND FINAL SIGNED OFF. 4/14/2004 10:09:16 AM
|
DOC - Permit Finaled | 4/14/2004 | 4/14/2004 | 4/14/2004 | A | PASS |
Scott M.Brown
|
|
|
Finaled by inspector at 4/14/2004 10:09:17 AM
|
PubWorks Occupancy Approval | 4/13/2004 | 4/13/2004 | 4/13/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 4/13/04. G.Fitts
|
FIRE-Final Inspection | 4/12/2004 | 4/13/2004 | 4/13/2004 | A | FAIL |
Troy Cobbley
|
|
|
No curb painting has been done and no sign has not been installed per the fire review notes 4/13/2004 9:47:38 AM
|
Print Occupancy Form | | | 4/9/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/9/2004 | | DONE |
|
|
|
Changed to ISSUE status per George Slane. adh.
|
DOC-Permit Expired | 12/15/2003 | 12/15/2003 | 12/15/2003 | | DONE |
Tom Arcoraci
|
|
|
Permit expired by limitations.
|
BLD-Aging Inspection | 10/15/2003 | 10/15/2003 | 10/15/2003 | | NR |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 8/11/2003 | | DONE |
|
|
|
Received three copies of revised sheets C-104-P2 and C-105-P2. Routed to Brian M. kmm
|
Issue PAID IN FULL permit | | | 7/16/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/30/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2003 | | DONE |
|
|
|
SPOKE WITH BRANDON PERMIT READY AND FEES DUE
|
Plan assigned to (KMM) | 4/22/2003 | | 6/30/2003 | | PASS |
Kathy Miller
|
|
|
6/30/2003 09:39:52 MYS - activity updated through activity BLDA022 from case BLD03-00869.
|
Routing - PLAN CHECK | 6/12/2003 | | 6/30/2003 | | PASS |
|
|
|
Do not issue utill appeal period is up, June 19th. at 5 pm.
|
Routing - FIRE | 6/11/2003 | | 6/12/2003 | | PASS |
|
|
|
Revised plans acceptable.
|
Routing - PUBLIC WORKS | 6/5/2003 | | 6/11/2003 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/11/2003 | | 6/11/2003 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2003 | | 6/11/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/10/2003 | | DONE |
|
|
|
Received five copy of revised sheets C-103-P2, C-104-P2 & C-105-P2. One copy of O & M manuel. Put with plans. kmm
|
Plan resubmittals received | | | 6/5/2003 | | DONE |
|
|
|
transmittal letter addressed to Brian M. containing 1 geotechnical report for East Garage, 1 geotechnical report for North tower and taken to brian
|
Routing - PLANNING | 6/5/2003 | | 6/5/2003 | | FAIL |
|
|
|
Need Land Division's approval.
|
Routing - PUBLIC WORKS | 5/29/2003 | | 6/3/2003 | | FAIL |
Brian McMahon
|
|
|
requires drainage plan revision
|
Routing - PLANNING Land Div | 5/21/2003 | | 5/29/2003 | | FAIL |
|
|
|
Need to submit Record of Survey, Property Line Adjustment that will provide frontage for parcels that had frontage on Curtisan Street.
|
Plan resubmittals received | | | 5/23/2003 | | DONE |
|
|
|
Received five copies of revised sheetsC-104-P2. Put with plans. kmm
|
Meeting | | | 5/23/2003 | | DONE |
|
|
|
Meeting with Jeff Cramer re FD access issues. Provided overall site plan illustrating existing and new FD ingress and egress roadways. He will resubmit revised Sheet C-103-P2 showing proper radius and clear roadway widths of proposed new roadway roundabout. Roadway dividing islands are acceptable with 10' clear roadway on each side of islands. Hydrant relocations acceptable on interim basis. Additional hydrants or relocations may be required when detailed plans are submitted for new building construction, based on access routes to the proposed buidlings and location of sprinkler FDC's.
|
Routing - FIRE | 5/9/2003 | | 5/21/2003 | | FAIL |
|
|
|
review cimments faxed to architect.
|
Plan resubmittals received | | | 5/14/2003 | | DONE |
|
|
|
transmittal letter to Karen Gallagher, two copies of record of survey and routed to kathy M.
|
Routing - PLANNING | 5/1/2003 | | 5/9/2003 | | FAIL |
|
|
|
Condition #2 of CUP02-109 not met regarding required property line adjustment and right-of-way vacation. Phone call and fax sent 5-9-03. KGallagher
|
Routing - PLANNING Land Div | 5/8/2003 | | 5/9/2003 | | FAIL |
|
|
|
Need Record of Survey/Property line adjustment showing flags for frontage due to vacation of Curtisan.
|
Routing - PLANNING | 4/28/2003 | | 5/1/2003 | | PEND |
|
|
|
Approved per DRH02-00158 & Mod. #1. Sent to Karen Gallagher for CUP review.
|
Routing - PLUMBING | 4/25/2003 | | 4/25/2003 | | PASS |
|
|
|
no plumbing
|
Routing - PUBLIC WORKS | 4/22/2003 | | 4/24/2003 | | FAIL |
|
|
|
Requires drainage plan revision
|
Routing - Erosion and Sediment | 4/24/2003 | | 4/24/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Plan routing begun/NEW & ADDTN | | | 4/22/2003 | | DONE |
|
|
|
|
Application received | | | 4/22/2003 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/22/2003 | | DONE |
|
|
|
|