Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-00887
StatusFinaled
Name TRANSPORTATION SECURITY ADMIN.
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(TRANSPORTATION SECURITY ADMINISTRATION - NEW BOISE AIR TERMINAL - 2ND & 3RD FLOORS) This building is fire sprinklered for fire area. To remodel 3 different areas (10,390 square feet total) within the new Boise City Air Terminal for the "Transportation Security Administration". Work is to include interior nonbearing walls, two restroom/locker rooms accessible to the disabled, a folding partition, suspended ceilings, and interior finishes. Existing 1-hr fire-resistance rated corridors are also being modified. All work shall comply with the approved drawings and plan review report on file. The fire sprinkler system, including the location of heads, shall comply with NFPA 13-1999 as regulated by the Fire Deparement. WELDING OF EXISTING STEEL ROOF JOISTS SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS AND SHALL HAVE SPECIAL INSPECTION. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 11/13/200311/13/2003 DONE
Permanent occupancy  11/13/2003 DONE
Perm. Occ. Cert. # 9871 issued 11-13-03 to the Transportation Security Administration offices at the airport.
Permanent Occupancy 11/12/200311/12/2003 DONE
Details
BLD-Final11/10/200311/12/200311/12/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/10/2003 at 5:04:11 PM. Contact: ###-####.
BLD-Final11/7/200311/10/200311/10/2003ANR
DetailsJim Storey
smoke seals latch adj. ada papper holder. 11/10/2003 4:09:07 PM
FIRE-Final Inspection11/6/200311/7/200311/7/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/6/2003 at 6:09:43 PM. Contact: ###-####.
BLD-Final11/6/200311/7/200311/7/2003PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/6/2003 at 6:10:37 PM. Contact: ###-####.
Letter of compliance  11/7/2003 DONE
Letter of Compliance # 24327 issued 11-13-03.
BLD-Final11/3/200311/3/200311/3/2003PNR
DetailsJim Storey
###-#### fire/mech 11/3/2003 12:31:15 PM
Override - Parcel Holds  11/3/2003  
BLD-Conference9/3/20039/4/20039/4/2003APASS
DetailsJim Storey
trd; Phone #: ###-#### Internet Inspection Request from: Annette Moore welding wip reviewed patching of fireproofing. 9/4/2003 8:45:45 AM
BLD-Framing/Rough-in8/25/20038/26/20038/26/2003APASS
DetailsJim Storey
ted; Phone #: ###-#### Internet Inspection Request from: Marc Lileks floor fire stopping ok. 8/26/2003 8:21:22 AM
BLD-Framing/Rough-in8/21/20038/22/20038/22/2003PPART
DetailsJim Storey
ted//before 3:30 please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire stopping and f/d. 8/22/2003 1:57:31 PM
BLD-Framing/Rough-in8/15/20038/18/20038/18/2003APART
DetailsJim Storey
ted; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire damper not completed per previous c/n all framing in other areas ok. 8/18/2003 9:52:56 AM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003APART
DetailsJim Sly
TED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK'd to cover walls at S.W corner of 3rd floor (TSA) offices....all penitrations at Horiz (2hr) floor assembly firestopped incl HVAC duct penitr....will need to install fire/sm damper in HVAC duct....accessible for verification from 2nd flr...advised to firestop (duct) also from 2nd flr at pan deck......Need listed assembly. 8/12/2003 12:53:23 PM 8/12/2003 12:56:19 PM
Issue PAID IN FULL permit  7/21/2003 DONE
Inspection Record Card- Bld  7/21/2003 DONE
Print Occupancy Form  7/21/2003 DONE
Telephone call  6/6/2003 DONE
LEFT MESS WITH SANDY MURPHY THAT PERMIT IS READY
PLANS/APPL TAKEN TO FRONT DESK  6/5/2003 PASS
Plan assigned to (CJW)4/29/2003 6/5/2003 PASS
DetailsCarl Westfall
6/5/2003 14:09:58 CJW - activity updated through activity BLDA022 from case BLD03-00887.
Routing - PLAN CHECK5/29/2003 6/5/2003 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  5/29/2003 DONE
Response letter, three copies from CSHQA, three sets of A0.2,E4.2, E4.3, and taken to carl w.
Routing - FIRE5/16/2003 5/28/2003 NR
Routing - PLAN CHECK4/30/2003 5/16/2003  
Failed first IBC plan review. IBC plan review started May 15, 2003 and finished the next day. A response was required from the architect. See the plan review report.
Routing - PUBLIC WORKS4/29/2003 4/30/2003 PASS
Plans ACCEPTED BY PLAN TECH  4/29/2003 DONE
Application received  4/23/2003  
Recd Pcfee & Taken To Pln CK  4/23/2003 DONE
Fee Review-notes4/23/20034/23/2003