(HONG KONG SPA) Remodel for a new day spa tenant in an existing 1,142 sq.ft. one story building with a 750 sq. ft. storage/mechanical equipment basement per approved plans on file. Building was formerly a veterinary clinic with a Certificate of Occupancy on file and prior to that, the building was a residence. Work to include a few new interior walls, interior doors with accessible hardware, providing handrails with extensions per code on all stairways and ramp, providing a landing at the bottom of an exterior stairway from the basement, providing separation of combustible storage in basement from main floor with 5/8" type X gyp. board on basment ceiling and stairway walls with a 1-3/4" solid core with closer at top of stairway, adding handrails to existing section of exterior accessible ramp, a new accessible ramp section, providing an accessible parking space, providing tempered glass windows where required, remodeling main floor restroom to meet current accessibility standards, new accessible roll-in shower, new sauna per manufacturer's specifications, interior finish, new water heater, new lighting on main floor, plumbing work, and electrical work. Previous interior demolition work done under BLD03-00939. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0221-03) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/10/20039/10/2003 DONE
BLD-Final9/8/20039/9/20039/9/2003APASS
DetailsJim Storey
KIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Permanent Occupancy 9/9/20039/9/2003 DONE
Details
Permanent occupancy  9/9/2003 DONE
Perm. Occ. Cert. #9794 issued 9-9-03 to the Hong Kong Spa.
Code Occupancy Approval  8/21/2003 PASS
compliance met.
BLD-Final8/20/20038/20/20038/20/2003PNR
DetailsRuss Owen
kim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Code Occupancy Approval  8/20/2003 FAIL
Inspection noted landscaping not completed in the small garden at the rear entrance. I spoke with "Kim" and a price of $200 was approved for a bond.
FIRE-Final Inspection8/19/20038/19/20038/19/2003PPASS
DetailsRick Jackson
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore door hardware wasn't correct but he had the right hardware and was going to install it by the time for the strcutural inspector 8/19/2003 3:28:38 PM
BLD-Conference7/21/20037/21/20037/21/2003PPART
DetailsJim Storey
TOM WILL CALL YOU TO SCHEDULE A TIME; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows arch to submit elavations to justify 1:12 ramp. 7/21/2003 2:42:37 PM
BLD-Conference7/9/20037/9/20037/9/2003PPASS
DetailsJim Storey
GRAIG; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Inspection Record Card- Bld  6/18/2003 DONE
Print Occupancy Form  6/18/2003 DONE
Telephone call  6/18/2003 DONE
LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  6/18/2003 DONE
Routing - PLAN CHECK6/17/2003 6/17/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  6/17/2003 PASS
Plan assigned to (JCB)4/28/2003 6/17/2003 PASS
DetailsJason Blais
6/17/2003 13:06:42 JCB - activity updated through activity BLDA022 from case BLD03-00890.
Routing - PLANNING4/30/2003 6/17/2003 PASS
The net square footage bring the main floor to just below 1000 sq. ft. requiring 4 paking spaces one of which will be provided off-site at Wendy's
Routing - PLANNING6/12/2003 6/17/2003 PASS
Susan Riggs.
Routing - PLAN CHECK6/4/2003 6/12/2003 PEND
Plan approval dependent on approval by Planning. Route plans to Susan Riggs.
Routing - PLAN CHECK6/3/2003 6/4/2003 PEND
Building code issues addressed. Permit issuance pending approval by Planning for parking issue/agreement.
Telephone call  6/4/2003  
Called architect Barbara Beier and let her know a few items that will be red-lined on plan and that permit can be issued when Planning approves the parking issue/agreement.
Routing - FIRE5/23/2003 6/3/2003 PASS
Plan resubmittals received  6/3/2003 DONE
Received two copies of revised sheets 1of 6, 2of 6, 4 of 6, 6 of 6. One copy of response letter, and one copy of revised TI application, cover sheet involved party sheet and registered design professional in responsible charge. Routed to Jason B. kmm
Plan resubmittals requested  5/23/2003  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK5/2/2003 5/23/2003 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Telephone call  5/22/2003  
Called architect Barbara Beier and went over some code issues that will need to be addressed on this project.
Routing - PLUMBING5/1/2003 5/2/2003 PASS
bathroom remodel in existing, no plan required, additional cross connection protection may be required.
Routing - PUBLIC WORKS4/29/2003 4/30/2003 PASS
Plans ACCEPTED BY PLAN TECH  4/28/2003 DONE
Tom would like a interior Demo permit prior to the building permit, also this came in with the value at 25,000.00 and I told him to break out the Demo portion hope thats ok.
Application received  4/23/2003  
Recd Pcfee & Taken To Pln CK  4/23/2003  
Fee Review-notes4/25/20034/25/2003