Permit Information
Permit NumberBLD03-00899
StatusFinaled
Name CEDARS WEST
Site Address 3512 W OVERLAND RD
Project NameCedars West Inc.
Customer Number 
ePlanReviewNo
Description
Cedars West, Inc. Office Development. To relocate an existing 1250 sq. ft. one story Type V-B Office building and bring the building into current code compliance per the approved plans and attachments. Other worok includes all site improvements, paving and landscaping. DRH03-00015 Contact Building Inspector Bob Archibald at 794-9459 for a moving permit prior to relocating the building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 6/28/20044/26/2005 DONE
Permanent Occupancy 6/28/20046/28/2004 DONE
Details
BLD-Final6/23/20046/28/20046/28/2004APASS
DetailsTom Arcoraci
Jan, ###-#### ok for perm occ 6/28/2004 9:14:46 AM
Permanent occupancy UNPAID FEE  6/28/2004 DONE
Perm. Occ. Cert. # 10204 issued 6-28-04 to Cedars West.
Temporary occupancy  6/23/2004 DONE
Temp. Occ. Cert. # 5120 issued 6-23-04 to Cedars West.
Code Occupancy Approval6/11/20046/11/20046/11/2004PPASS
DetailsScott M.Brown
FINAL SIGNED OFF. 6/18/2004 11:15:51 AM
BLD-Final6/4/20046/8/20046/8/2004APART
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp cn posted 6/8/2004 9:36:43 AM
PubWorks Occupancy Approval6/7/20046/7/20046/7/2004 DONE
Drainage project complete, signed permanent occupancy 6/7/04. G.Fitts
FIRE-Final Inspection6/4/20046/7/20046/7/2004APASS
DetailsRick Jackson
jan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Aging Inspection4/5/20044/5/20044/5/2004 NR
DetailsTom Arcoraci
BLD-Conference2/4/20042/4/20042/4/2004PPASS
DetailsTom Arcoraci
rick; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs to call bob a 2/4/2004 2:15:53 PM
BLD-Conference1/9/20041/12/20041/12/2004APASS
DetailsTom Arcoraci
meet at 11 am may need resub mit for bath rooms 1/12/2004 11:12:30 AM
BLD-Framing/Rough-in1/9/20041/9/20041/9/2004 NR
DetailsTom Arcoraci
BLD-Foundation10/13/200310/13/200310/13/2003PPASS
DetailsTom Arcoraci
JIMMY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing10/9/200310/10/200310/10/2003APASS
DetailsTom Arcoraci
jimmy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Issue PAID IN FULL permit  10/7/2003 DONE
Inspection Record Card- Bld  10/7/2003 DONE
Print Occupancy Form  10/7/2003 DONE
Telephone call  9/25/2003 DONE
left mess for jan stanley that permit is ready
Telephone call  8/15/2003 DONE
left mess that permit is ready
Routing - PLANNING Land Div8/14/2003 8/14/2003 PASS
Approved. Easement has been vacated.
Routing - PLAN CHECK8/14/2003 8/14/2003 PASS
Case Summary (BLD)  8/14/2003  
Routing Off Site -Energy7/8/2003 8/14/2003 PASS
RO switching correction completed
PLANS/APPL TAKEN TO FRONT DESK  8/14/2003 DONE
Plan assigned to (MLO)4/29/2003 8/14/2003 PASS
DetailsMike Otto
8/14/2003 15:36:06 MLO - activity updated through activity BLDA022 from case BLD03-00899.
Routing - PUBLIC WORKS8/8/2003 8/13/2003 PASS
Routing - PUBLIC WORKS7/10/2003 7/10/2003 FAIL
Plan resubmittals received  7/8/2003 DONE
Received three copies of revised sheets A2.0 and response letter. Routed to Mike O. kmm
Routing Off Site -Energy6/16/2003 6/23/2003 FAIL
Contacted Ron O. for energy review on revised plans of 6/13/03. kmm corrections faxed to architect. MLO
Plan resubmittals received  6/16/2003 DONE
Received 3 copies of revised sheets A2.0, A5.0, EN. One copy of plan review comments. Routed to Mike O. kmm
Routing - FIRE6/6/2003 6/10/2003 PASS
Routing - PLAN CHECK6/10/2003 6/10/2003 FAIL
waiting for easement issue to be cleared
Plan resubmittals requested  6/10/2003 DONE
corrections for the energy review were not included with resub on 6-10, architect contacted.
Plan resubmittals received  6/6/2003 DONE
Two copies of plan sheets A0.0, A1.0, A2.0, A3.0, A4.0, A5.0, cover letter and 2 copies of structural calcs submitted and forwarded to Mike Otto.
Plan resubmittals received  6/6/2003 DONE
Received two copies of United Water Letter. Routed to Mike O. kmm
Routing - PLAN CHECK5/30/2003 5/30/2003 NR
Routing - FIRE5/19/2003 5/30/2003 FAIL
Hydrant flow info required.
Routing Off Site -Energy5/9/2003 5/16/2003 FAIL
Plans routed to Ron O. for energy review. kmm corrections faxed to architect MLO
Plan resubmittals requested  5/16/2003 DONE
IBC corrections and energy corrections
Routing - PLAN CHECK5/13/2003 5/16/2003 FAIL
corrections faxed and mailed to architect
Routing - PLUMBING5/12/2003 5/12/2003 PASS
1. water heater may require a pan with a drain.
Routing - PLANNING5/7/2003 5/9/2003 PASS
Approved per DRH03-15.
Routing - Erosion and Sediment5/6/2003 5/7/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS4/30/2003 5/6/2003 FAIL
Requires drainage plan per Brian Murphy. kmm
Routing - PLANNING Land Div4/29/2003 4/29/2003 FAIL
There is a 15' utility easement along the east property line that has not been vacated. The relocated building could be moved 5' to the west and be outside the easement.
Plans ACCEPTED BY PLAN TECH  4/29/2003 DONE
Plan routing begun/NEW & ADDTN  4/29/2003 DONE
Override - Parcel Holds  4/24/2003  
Application received  4/24/2003  
Override - Parcel Holds  4/24/2003  
Recd Pcfee & Taken To Pln CK  4/24/2003  
Fee Review-notes4/24/20034/24/2003