Permit Information
Permit NumberBLD03-00904
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 740 N ASHTREE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1560 sq. ft. one story single family dwelling with a 640 sq. ft. finished basement, a 672 sq. ft. attached two car garage, a 184 sq. ft. covered entry porch and a 400 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. PC #258 DJO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/21/200311/24/200311/24/2003APASS
DetailsTony Young
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
DOC - Permit Finaled11/24/200311/24/200311/24/2003PPASS
DetailsTony Young
Finaled by inspector at 11/24/2003 12:45:51 PM
BLD-Final11/20/200311/21/200311/21/2003ACANC
DetailsDave Hannah
Brian --- would like late morning please. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Grading Inspection11/21/200311/21/200311/21/2003 BND
DetailsRita DeYoung
Final grading is not complete. However, the grading and drainage can be conditionally approved upon receipt of a $1,000.00 bond.
BLD-Final11/20/200311/20/200311/20/2003PNR
DetailsDave Hannah
brian-call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Wall cover11/10/200311/12/200311/12/2003APART
DetailsDave Hannah
Brian --- front retaining wall; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to backfill 11/12/2003 10:36:53 AM
BLD-Framing/Rough-in10/29/200310/30/200310/30/2003PPASS
DetailsSteven Webb
bryan; Phone #: ###-#### Internet Inspection Request from: Annette Moore Retaining wall n Bottom two courses of retaining blocks per plans. WIP 10/30/2003 3:55:06 PM 10/30/2003 3:55:32 PM
BLD-Framing/Rough-in9/8/20039/9/20039/9/2003ANR
DetailsDave Hannah
BRIAN *INSULATION; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Framing/Rough-in9/8/20039/9/20039/9/2003PPASS
DetailsDave Hannah
BRIAN *INSULATION; Phone #: ###-#### Internet Inspection Request from: Marc Lileks all c/n items completed ok to cover 9/9/2003 3:34:53 PM 9/9/2003 4:01:14 PM
BLD-Framing/Rough-in9/4/20039/5/20039/5/2003AFAIL
DetailsTony Young
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok to insulate 9/5/2003 2:49:31 PM
BLD-Energy code compliance9/5/20039/5/20039/5/2003PPART
DetailsTony Young
brian, ###-####
seal pack ok, c/n on frame, ok to insulate 9/5/2003 2:51:43 PM
BLD-Other8/11/20038/12/20038/12/2003ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/11/2003 at 7:27:13 PM. Contact: ###-####.
BLD-Concrete7/2/20037/3/20037/3/2003APART
DetailsDave Hannah
RJ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rebar is in forms at about 75% 7/3/2003 9:51:21 AM
BLD-Foundation6/30/20037/1/20037/1/2003ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/30/2003 at 12:25:24 PM. Contact: ###-####. 7/1/2003 10:30:55 AM
BLD-Footing7/1/20037/1/20037/1/2003APART
DetailsDave Hannah
second level footings for garage
BLD-Foundation6/13/20036/13/20036/13/2003PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/13/2003 at 8:51:53 AM. Contact: ###-####. basement walls ok to pour 6/13/2003 12:32:55 PM
BLD-Grading Inspection6/11/20036/11/20036/11/2003 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer.
BLD-Footing6/11/20036/11/20036/11/2003PPART
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore lower level 6/11/2003 4:50:52 PM
BLD-Footing6/10/20036/10/20036/10/2003PPART
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore rebar ok still needs TR sign off 6/11/2003 8:34:42 AM
Routing - Erosion and Sediment6/3/2003 6/3/2003 PASS
ESC approved with conditons attached to plans.
Issue PAID IN FULL permit  5/27/2003 DONE
Plan assigned to (DJO)5/21/20035/21/20035/22/2003 PASS
DetailsDan Overy
5/22/2003 08:42:40 DJO - activity updated through activity BLDA022 from case BLD03-00904.
PLANS/APPL TAKEN TO FRONT DESK  5/22/2003 DONE
Inspection Record Card- Bld  5/22/2003 DONE
Telephone call  5/22/2003 DONE
LEFT MESS THAT PERMIT IS READY
Routing - PLAN CHECK5/9/2003 5/22/2003 PASS
Plans ACCEPTED BY PLAN CHECK  5/21/2003  
Plan Reviewer's activity  5/21/2003 PEND
rescheck incorrect. have contacted tim scharff (designer). additional site plan required. also need verification about floor/perimeter insulation/foundation vents.
Plan Review Report  5/21/2003 PEND
Routing - Erosion and Sediment5/7/2003 5/9/2003 FAIL
ESC plans does not meet 8-17 and PD appendix A and C. Notified contractor.
Routing - FIRE5/9/2003 5/9/2003 DONE
No fire sprinklers required (Northridge #5 sub.)
Routing - PUBLIC WORKS5/7/2003 5/7/2003 PASS
Routing - PUBLIC WORKS GRADING4/28/2003 5/7/2003 PASS
DetailsRita DeYoung
APPROVED AS CATEGORY 3 WITH CONDITIONS OF APPROVAL IN LETTER ATTACHED TO THE PLANS AND THIS CASE
Routing - PLANNING4/24/2003 4/28/2003 PASS
Application received  4/24/2003