BLD-Final | 11/21/2003 | 11/24/2003 | 11/24/2003 | A | PASS |
Tony Young
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 11/24/2003 | 11/24/2003 | 11/24/2003 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/24/2003 12:45:51 PM
|
BLD-Final | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | CANC |
Dave Hannah
|
|
|
Brian --- would like late morning please. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Grading Inspection | 11/21/2003 | 11/21/2003 | 11/21/2003 | | BND |
Rita DeYoung
|
|
|
Final grading is not complete. However, the grading and drainage can be conditionally approved upon receipt of a $1,000.00 bond.
|
BLD-Final | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | NR |
Dave Hannah
|
|
|
brian-call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Wall cover | 11/10/2003 | 11/12/2003 | 11/12/2003 | A | PART |
Dave Hannah
|
|
|
Brian --- front retaining wall; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to backfill 11/12/2003 10:36:53 AM
|
BLD-Framing/Rough-in | 10/29/2003 | 10/30/2003 | 10/30/2003 | P | PASS |
Steven Webb
|
|
|
bryan; Phone #: ###-#### Internet Inspection Request from: Annette Moore Retaining wall n Bottom two courses of retaining blocks per plans. WIP 10/30/2003 3:55:06 PM 10/30/2003 3:55:32 PM
|
BLD-Framing/Rough-in | 9/8/2003 | 9/9/2003 | 9/9/2003 | A | NR |
Dave Hannah
|
|
|
BRIAN *INSULATION; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
BLD-Framing/Rough-in | 9/8/2003 | 9/9/2003 | 9/9/2003 | P | PASS |
Dave Hannah
|
|
|
BRIAN *INSULATION; Phone #: ###-#### Internet Inspection Request from: Marc Lileks all c/n items completed ok to cover 9/9/2003 3:34:53 PM 9/9/2003 4:01:14 PM
|
BLD-Framing/Rough-in | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | FAIL |
Tony Young
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ok to insulate 9/5/2003 2:49:31 PM
|
BLD-Energy code compliance | 9/5/2003 | 9/5/2003 | 9/5/2003 | P | PART |
Tony Young
|
|
|
brian, ###-####
seal pack ok, c/n on frame, ok to insulate 9/5/2003 2:51:43 PM
|
BLD-Other | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 7:27:13 PM. Contact: ###-####.
|
BLD-Concrete | 7/2/2003 | 7/3/2003 | 7/3/2003 | A | PART |
Dave Hannah
|
|
|
RJ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore rebar is in forms at about 75% 7/3/2003 9:51:21 AM
|
BLD-Foundation | 6/30/2003 | 7/1/2003 | 7/1/2003 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/30/2003 at 12:25:24 PM. Contact: ###-####. 7/1/2003 10:30:55 AM
|
BLD-Footing | 7/1/2003 | 7/1/2003 | 7/1/2003 | A | PART |
Dave Hannah
|
|
|
second level footings for garage
|
BLD-Foundation | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 8:51:53 AM. Contact: ###-####. basement walls ok to pour 6/13/2003 12:32:55 PM
|
BLD-Grading Inspection | 6/11/2003 | 6/11/2003 | 6/11/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 6/11/2003 | 6/11/2003 | 6/11/2003 | P | PART |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore lower level 6/11/2003 4:50:52 PM
|
BLD-Footing | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | PART |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Annette Moore rebar ok still needs TR sign off 6/11/2003 8:34:42 AM
|
Routing - Erosion and Sediment | 6/3/2003 | | 6/3/2003 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Issue PAID IN FULL permit | | | 5/27/2003 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 5/21/2003 | 5/21/2003 | 5/22/2003 | | PASS |
Dan Overy
|
|
|
5/22/2003 08:42:40 DJO - activity updated through activity BLDA022 from case BLD03-00904.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2003 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Routing - PLAN CHECK | 5/9/2003 | | 5/22/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/21/2003 | | |
|
|
|
|
Plan Reviewer's activity | | | 5/21/2003 | | PEND |
|
|
|
rescheck incorrect. have contacted tim scharff (designer). additional site plan required. also need verification about floor/perimeter insulation/foundation vents.
|
Plan Review Report | | | 5/21/2003 | | PEND |
|
|
|
|
Routing - Erosion and Sediment | 5/7/2003 | | 5/9/2003 | | FAIL |
|
|
|
ESC plans does not meet 8-17 and PD appendix A and C. Notified contractor.
|
Routing - FIRE | 5/9/2003 | | 5/9/2003 | | DONE |
|
|
|
No fire sprinklers required (Northridge #5 sub.)
|
Routing - PUBLIC WORKS | 5/7/2003 | | 5/7/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/28/2003 | | 5/7/2003 | | PASS |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 3 WITH CONDITIONS OF APPROVAL IN LETTER ATTACHED TO THE PLANS AND THIS CASE
|
Routing - PLANNING | 4/24/2003 | | 4/28/2003 | | PASS |
|
|
|
|
Application received | | | 4/24/2003 | | |
|
|
|
|