Micron Building #3 * To demolish two existing cleanroom walls, excavate to 48" depth, pour new 42" deep concrete subfloor and retaining walls. To install new access floor system, grating and two new cleanroom walls to create Plenum #133, Photo Bay "D" #101U and Plenum #134. This remodel also includes replace the cleanroom ceiling, relocate 3 existing doors, as well as, new facilities piping, power and minor HVAC and exhaust duct modifications. This work is at an approximate 760 square foot area of the first floor of building #03 between grid lines 10.5&12 and E&F. All construction per the approved plans and redlined notes. PC#228-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/16/20041/16/20041/16/2004 PASS
DetailsJim Storey
DOC - Permit Finaled1/16/20041/16/20041/16/2004APASS
DetailsJim Storey
Finaled by inspector at 1/16/2004 8:27:20 AM
Letter of compliance  10/31/2003 DONE
Letter of Compliance #24315 issued 10-31-03
FIRE-Final Inspection10/23/200310/24/200310/24/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/23/2003 at 12:20:52 PM. Contact: ###-####.
BLD-Final10/23/200310/24/200310/24/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2003 at 12:21:50 PM. Contact: ###-####.
FIRE-Final Inspection10/14/200310/14/200310/14/2003PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/14/2003 at 7:38:49 AM. Contact: ###-####. Wayne called and said the sprinkler bracing isn't complete 10/14/2003 3:23:49 PM
BLD-Conference9/30/200310/1/200310/1/2003ACANC
DetailsJim Storey
waiting for paul or joe to call back.
BLD-Final9/30/20039/30/20039/30/2003PCANC
DetailsJim Storey
rachelle; Phone #: ###-#### Internet Inspection Request from: Annette Moore rolled over waiting for call back. 9/30/2003 4:42:03 PM
BLD-Conference8/14/20038/15/20038/15/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/14/2003 at 10:07:30 AM. Contact: ###-####. Scheduled by a check f/d at floor 2 at final. ok to cover upon all trades r/i aproval. contractor via Hello! on 8/14/2003 at 10:07:30 AM. Contact: ###-####. 8/15/2003 12:46:33 PM
BLD-Footing7/24/20037/29/20037/29/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/24/2003 at 3:14:20 PM. Contact: ###-####.wall forms ok. 7/29/2003 10:31:54 AM
BLD-Footing7/24/20037/29/20037/29/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/24/2003 at 3:15:00 PM. Contact: ###-####.
BLD-Footing7/24/20037/28/20037/28/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/24/2003 at 3:12:49 PM. Contact: ###-####.wall steel in place form work in progess. 7/28/2003 11:03:26 AM
BLD-Footing7/24/20037/28/20037/28/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/24/2003 at 3:13:34 PM. Contact: ###-####.wip trans to am. 7/28/2003 1:41:19 PM
BLD-Footing7/23/20037/25/20037/25/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/23/2003 at 9:10:41 AM. Contact: ###-####.
BLD-Footing7/23/20037/25/20037/25/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/23/2003 at 9:11:50 AM. Contact: ###-####.
BLD-Footing7/24/20037/24/20037/24/2003PPASS
DetailsJim Storey
rebar ok. 7/24/2003 3:19:49 PM
BLD-Footing7/23/20037/24/20037/24/2003ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/23/2003 at 9:09:53 AM. Contact: ###-####.
Issue & PRINT to be Invoiced  6/5/2003 DONE
Inspection Record Card- Bld  6/5/2003 DONE
Print Occupancy Form  6/5/2003 DONE
Routing - PLAN CHECK6/2/2003 6/2/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/2/2003 PASS
Plan assigned to (JCM)4/30/2003 6/2/2003 PASS
DetailsJohn Menard
6/2/2003 14:49:20 JCM - activity updated through activity BLDA022 from case BLD03-00923.
Routing - FIRE5/21/2003 6/2/2003 PASS
Plan Reviewer's activity  5/21/2003 PASS
Reviewed and approved with attached comment list and redlined notes. JCM
Routing - PLAN CHECK5/2/2003 5/21/2003 PASS
Routing - PLUMBING5/2/2003 5/2/2003 PASS
plans show no potable water, sanitary sewer, venting or any chenical waste piping. If work requiring a plumbing permit is preformed with this project a plan will need to be submitted.
Routing - PUBLIC WORKS4/30/2003 5/2/2003 PASS
Plan routing begun/TENANTS  4/30/2003 DONE
Plans ACCEPTED BY PLAN TECH  4/30/2003 DONE
Application received  4/25/2003  
Fee Review-notes4/25/20034/25/2003