Permit EXPIRED | | | 6/30/2008 | | DONE |
|
|
|
Per email request from Marlene. This permit expired, last update was 2004
|
Routing - PLANNING | 11/9/2004 | | 11/10/2004 | | FAIL |
|
|
|
Revisions needed to comply with CUP and CVA approved Nov. 8, 2004. Also need DRH review. kg
|
CHANGE STATUS TO (PND) | | | 11/9/2004 | | DONE |
|
|
|
resubs recd 11/9/2004 - cmc
|
Plan resubmittals received | | | 11/9/2004 | | DONE |
|
|
|
Received two copies of revised sheet a1.11. Routed to Karen G. kmm
|
Ready Permit EXTENDED | | | 9/28/2004 | | DONE |
|
|
|
per bruce chatterton granted a 90 day extention until december 27, 2004 letter dated sept 27, 2004/mls
|
Extend Permit 180 days | | 3/12/2004 | 3/12/2004 | | PASS |
Tom Arcoraci
|
|
|
per letter from jenifer ok to extend permit to september 27th 2004/mls
|
CHANGE STATUS TO (R) | | | 3/12/2004 | | DONE |
|
|
|
filed for extension need to put back into ready status/mls
|
Ready Permit EXTENDED | | | 3/12/2004 | | DONE |
|
|
|
per letter from jennifer extend permit to september 27th 2004/mls
|
Telephone call | | | 2/26/2004 | | DONE |
|
|
|
left mess for andy that permit is ready-will need to pickup by march 29th or will need to void
|
Telephone call | | | 1/27/2004 | | DONE |
|
|
|
Left message for Andy to follow up if he requested the extension yet//1/27/04 BAM
|
Telephone call | | | 1/27/2004 | | DONE |
|
|
|
Spoke with Andy, he has the letter requesting an extension written and will be bringing it in in the next day or so//1/27/04 BAM
|
Telephone call | | | 1/7/2004 | | DONE |
|
|
|
Spoke with Andy he is going to ask for an extension this week on this permit//1/7/04 3:06pm BAM
|
Telephone call | | | 10/21/2003 | | DONE |
|
|
|
Left message to remind that permit is ready , fees and that we need ACHD
|
Plan assigned to (MLO) | 4/30/2003 | | 9/29/2003 | | PASS |
Mike Otto
|
|
|
9/29/2003 09:16:09 MLO - activity updated through activity BLDA022 from case BLD03-00956.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2003 | | DONE |
|
|
|
Spoke with Bill told permit ready, fees & need ACHD
|
Routing - PUBLIC WORKS | 9/22/2003 | | 9/26/2003 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/10/2003 | | 9/10/2003 | | PASS |
|
|
|
Keith Jones contacted about seepage bed and was considered in original design.
|
Routing - PUBLIC WORKS | 8/28/2003 | | 9/2/2003 | | FAIL |
|
|
|
Requires drainage plan. New Bld. A appears to almost be on existing seepage bed. All per Brian Murphy. kmm
|
Routing - PLAN CHECK | 9/2/2003 | | 9/2/2003 | | NR |
|
|
|
|
Plan resubmittals received | | | 9/2/2003 | | DONE |
|
|
|
Received four copies of revised sheets S1.0, S2.0, S3.0, S4.0 & S5.0. Two additional copies of structl. calculations. Routed to Mike O. kmm
|
Routing - FIRE | 8/20/2003 | | 8/27/2003 | | PASS |
|
|
|
Resubmittal acceptable.
|
Plan resubmittals requested | | | 8/21/2003 | | DONE |
|
|
|
additional structural comments
|
Routing Off Site - STRUCTURAL | 8/15/2003 | | 8/21/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLAN CHECK | 8/15/2003 | | 8/20/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/14/2003 | | DONE |
|
|
|
Recieved two additional copies of sheets S1.0, S2.0, S3.0, S4.0 & S5.0 and three copies of revised sheets a2.11. Routed to Mike O. kmm
|
Plan resubmittals received | | | 7/25/2003 | | DONE |
|
|
|
Fax transmittal from Erstad Thornton Arch,.Two copies of response letter,two copies of structural review comment responses, two copies of a map, two copies of structural calculations, two copies of C1.5a, C1.5b, (4copies ofA1.11,) A3.11, A5.12, S1.0, S2.0, S3.0, S4.0, S5.0, S1.0, S2.0, S3.0, S4.0, S5.0, taken to Mike O.
|
Plan resubmittals requested | | | 7/23/2003 | | DONE |
|
|
|
for parapet as corrected in fax and door on existing building to 45 minute
|
Routing - PLAN CHECK | 7/22/2003 | | 7/23/2003 | | FAIL |
|
|
|
went over parapet and exterior door with Neil Daigle from architects office. MLO
|
Routing - PLANNING Land Div | 7/22/2003 | | 7/22/2003 | | PASS |
|
|
|
Approved by ROS 6173 recorded on May 22, 2003.
|
Routing - PLAN CHECK | 6/17/2003 | | 6/17/2003 | | NR |
|
|
|
|
Routing - FIRE | 6/12/2003 | | 6/17/2003 | | FAIL |
|
|
|
review comments discussed with and faxed to Andrew Erstad
|
Routing Off Site -Energy | 5/9/2003 | | 6/16/2003 | | PASS |
|
|
|
Plans routed to Ron O. for energy review. kmm
|
Routing - PLAN CHECK | 5/22/2003 | | 6/12/2003 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/30/2003 | | 6/11/2003 | | FAIL |
|
|
|
contacted PDQ to take plans to outside engineering. Corrections faxed to architect
|
Plan resubmittals requested | | | 6/10/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/22/2003 | | 6/10/2003 | | FAIL |
|
|
|
architect contacted by phone and mail
|
Routing - PLUMBING | 5/22/2003 | | 5/22/2003 | | PASS |
|
|
|
roof drain and overflow piping shall be four inch where piping is common to two drains installed at an eight of inch per foot
|
Routing - PLANNING | 5/14/2003 | | 5/21/2003 | | PASS |
|
|
|
Approved for CUP compliance, if Land Division ensures recorded property line adjustment. KG 5-15-03
Approved per DRH03-1 and as noted on plans (MGS).
|
Routing - Erosion and Sediment | 5/12/2003 | | 5/13/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 5/1/2003 | | 5/12/2003 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 5/6/2003 | | DONE |
|
|
|
Received copies of HVAC calculations. Put one with plans and one to Mike O. kmm
|
Routing - PLANNING Land Div | 4/30/2003 | | 5/1/2003 | | FAIL |
|
|
|
Need to completed Record of Survey. Waiting for revised site plans for CUP.
|
Plan routing begun/NEW & ADDTN | | | 4/30/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/30/2003 | | DONE |
|
|
|
|
Application received | | | 4/29/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/29/2003 | | |
|
|
|
|
Fee Review-notes | 4/29/2003 | 4/29/2003 | | | |
|
|
|
|