Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00979
StatusFinaled
Name ST ALPHONSUS (LIBRARY RELOCATION)
Site Address 1055 N CURTIS RD
Project NameST ALS-NORTH TOWER
Customer Number 
ePlanReviewNo
Description
(SAINT ALPHONSUS LIBRARY)(CURTIS PROFESSIONAL PLAZA-BASEMENT) To remodel a 2,654 sq.ft. area in the basement to convert space from mechanical/storage to a library and office per approved plans on file. NOTE: This building is fully sprinklered with alarm system. A "Letter of Complaince is required for this project. PC03-240/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/24/20043/25/20043/25/2004APASS
DetailsRick Jackson
Cecil; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final3/24/20043/25/20043/25/2004PPASS
DetailsTom Arcoraci
cecil; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Letter of compliance  3/25/2004 DONE
Letter of Compliance issued 3-25-04.
BLD-Aging Inspection1/23/20041/23/20041/23/2004 PASS
DetailsTom Arcoraci
BLD-Aging Inspection11/11/200311/11/200311/11/2003 PASS
DetailsTom Arcoraci
wip 11/12/2003 2:55:10 PM
BLD-Framing/Rough-in9/10/20039/11/20039/11/2003APASS
DetailsTom Arcoraci
grid ceiling insp mark ###-####
BLD-Conference8/26/20038/26/20038/26/2003PCANC
DetailsDave Hannah
BLD-Framing/Rough-in8/20/20038/20/20038/20/2003PPASS
DetailsTom Arcoraci
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Inspection Record Card- Bld  8/6/2003 DONE
Print Occupancy Form  8/6/2003 DONE
Telephone call  8/6/2003  
Telephone call  8/6/2003  
Issue & PRINT permit  8/6/2003 DONE
(F) Reprint permit  8/6/2003 DONE
Routing - PLAN CHECK8/4/2003 8/4/2003 PASS
Inserted new M-3 sheets received 7/30/03 showing approved mechanical design certificate using the 1989 ASHRAE Standard as noted in the 2000 IECC. Routing to permit desk to process for issue.
PLANS/APPL TAKEN TO FRONT DESK  8/4/2003 PASS
To permit desk for issue.
Plan assigned to (DRS)5/2/2003 8/4/2003 PASS
DetailsDan Stuart
8/4/2003 13:30:15 DRS - activity updated through activity BLDA022 from case BLD03-00979.
Routing - FIRE7/29/2003 8/1/2003 PASS
Resubmittal acceptable for IFC purposes.
Plan resubmittals received  7/30/2003 DONE
Transmittal sheet from LCA, three M-3 sheets. Taken to Dan S.
Routing Off Site -Energy7/30/2003 7/30/2003 PASS
Called Ron Oltman to review data for resubmittals provided by Bob Tikker, Engineering Incorporated. Two copies of sheet M-3 were provided with change in Mechanical Compliance Certificate design data from 1999 ASHRAE to the 1989 ASHRAE Standard as spelled out in Ch. 9 2000 IECC. Also received copy of memo to Sam Burrows from Paul Highley, Synergy, stating that occupancy sensors have been placed in library and office and this is as indicated on the most recent plans submitted. Ron stated those resubmitted items covered the questions he had on energy code and said no need to route them back to him. I will approve the energy code review based on resubmittals and this discussion with Ron Oltman. Plans are in fire code analyst review bin.
Routing - PLAN CHECK7/23/2003 7/29/2003 FAIL
Received resubmittals from architect with cover letter. Inserted new sheets into plans and reviewed architect response or lack of response to items needing clarified. Made red-line comments on plans and notified Bob Tikker that his resubmittals for design per IECC was still incorrect and he would need to resubmit design based on correct standard. I copied Sam Burrows, architect. Forwarding plans to fire code analyst for re-review.
Plan resubmittals received  7/23/2003 DONE
Response letter from Lombard Conrad Arch, memo from synergy, three sets of A-1,A-2,A-3,M-3, taken to Dan S.
Routing Off Site -Energy6/24/2003 6/24/2003 FAIL
Ron will be in later today to pick this up.
6/24/03 - Talked with Ron Oltman concerning the resubmittal information received and the mechanical engineers use of 50 degrees as the design base when 65 degrees is the base required by chapter 3, 2000 IECC. The degree Cooling Days used resulted in 2,800+ days instead of 754 noted for Boise. Ron will check out and discuss with Mr. Tikker. This appears to be the result of using the ASHRAE 1999 Standard rather than the 1989 Standard required in Chapter 9 IECC.
Plan resubmittals requested  6/24/2003 FAIL
Plan resubmittals of 6/23/03 were incomplete. Fax to Sam Burrows noting need for further clarification & re-submittal.
Routing - PLAN CHECK6/11/2003 6/24/2003 FAIL
Plan resubmittals received were incomplete. Architect did not provide cover letter stating were to find his specific response & details answering the plan check items; information provide on some questionwas to referenc the code section but not address how the item in question was to be done to meet code leaving design to contractor & inspector; only funished answer to part of seismic design category and design criteria that is needed because of the seismic category under the IBC as part of a hospital complex. Fax to Sam Burrow, LCA, with copy to Dennis Adams of SARMC asking for cover letter and clearer details & answers. Sending out energy code package for re-review of deficiencies noted to be answered with this resubmittal.
Plan resubmittals received  6/23/2003 PASS
Transmittal letter form Lonbard Conrad arch. with three sets of A-0,A-1, A-2, A-2F, A-3, M-1, M-3, taken to Dan S.
Routing Off Site -Energy6/12/2003 6/18/2003 FAIL
Items needing to be addressed sent to designer with copy to me.
Routing Off Site -Energy6/4/2003 6/12/2003 FAIL
called to have Ron pick for eneregy review. Ron picked up plans. 6/17/03 - Failed; 7/7/03 - Failed; 7/23/03 - Failed - Letter to design professional Bob Tikker, after discussion with Marlene concerning a copy of a 'Memorandum' Mr. Tikker had circulated to his staff after a meeting with Marlene Southard on April 17, 2003. In the memorandum it was stated that use of the 1999 ASHRAE Standard was approved. A copy of the memorandum was not sent to Marlene to verify conclusions arrived at by Mr. Tikker until now. Marlene stated the items had been discussed but no formal policy had been established and that design is to be per energy code and the standards listed in Chapter 9 IECC, 1989 ASHRAE. Mr. Tikker is to re-design plans for compliance with energy code standards and resubmitt with all standards & code references corrected.
Plan Review Completed(1st rev)  6/10/2003 DONE
Routing - FIRE6/5/2003 6/10/2003 FAIL
DetailsBill Alexander
Questions on library shelf/racking height, use seperation questions.
Plan resubmittals requested  6/5/2003 FAIL
Resubmittals & clarifications requested from architect. Hand delivered copy of architectural concerns to Sam Burrows at conference on 6/4/03 with Mike Berard of Kreizenbeck Constructors. Faxed him copy of comments on mechanical & electrical with note that energy code review was being outsourced to third party under contract with city based on design discepencies from said code in data provided by designers.
Meeting  6/4/2003 DONE
Met with Sam Burrows and Mike Berard to review questions concerning plans submitted for review and noted defficiencies. Gave copy of architectural plans having been reviewed with items needing clarifications from them for resubmittals.
Routing - PLAN CHECK5/5/2003 6/4/2003 FAIL
Corrections & resubmittals required. Copies to Sam Burrows hand delivered and faxed to LCA. Reviewed those Sam had questions on in meeting in conference room 5, Mike Berard of Kreizenbeck Const. was also at the meeting.
Telephone call  5/30/2003 DONE
Called Sam Burrows to discuss questions I had on plan submittals, i.e. occupancy use group, type of construction, seismic design criteria, code year under which designed, existing conditions that should be in place in basement from previous permit & code requirements but not reflected on the plans, etc. Sam will arrange tyime we can meet and I will provide written review comments for response.
Plan resubmittals received  5/15/2003  
per John P. throw other resubmittals away and replace with three sets of A-0, A-1, A-2, A-2F, A-3, A-4, M-1, M-2, E0.0,E2.0, E2.0D , E2.0F, E2.0L, E2.0P, E2.0S, along with a new application and taken to Dan S.
Plan resubmittals received  5/14/2003 DONE
received three sets of A-0, A-1,A-2, A-2F, A-3, A-4, M-1, M-2, E-0.0, E2.0, E2.0D, E-2.0L, E2.0P, E2.0S, And taken to Dan S.
Routing - PUBLIC WORKS5/2/2003 5/5/2003 PASS
Plans ACCEPTED BY PLAN TECH  5/2/2003 PEND
1. Waiting for third set of plans.
Application received  5/1/2003  
Recd Pcfee & Taken To Pln CK  5/1/2003  
Fee Review-notes5/1/20035/1/2003