Case Summary (BLD) | | | 11/4/2005 | | |
|
|
|
|
First Notice | | 4/9/2004 | 4/9/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/9/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10092 issued 4-9-04 to Fed Ex Freight.
|
Permanent Occupancy | | 3/30/2004 | 3/30/2004 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 3/30/2004 | | PAS |
|
|
|
ALL LANDSCAPE IN AS REQUIRED FINAL SIGNED OFF AND RELEASE OF BOND
|
FIRE-Final Inspection | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 11/26/2003 12:21:59 PM
|
FIRE-Final Inspection | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 11/26/2003 12:21:59 PM
|
BLD-Final | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PART |
Jim Sly
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Temp Occ. Need perm Occ. status on Fire, Mech, and Zoning....OK to final for Perm after these finals. C/N Obtain Perm Occ. status within 90 days of this notice. 11/26/2003 8:54:11 AM
|
Temporary occupancy | | | 11/26/2003 | | DONE |
|
|
|
Temp. Occ. Cert. # 5028 issued 11-26-03 to FedEx Freight Terminal Building.
|
BLD-Final | 11/24/2003 | 11/25/2003 | 11/25/2003 | A | NR |
Jim Sly
|
|
|
Mike ###-#### Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 11/25/2003 8:57:23 AM
|
FIRE-Final Inspection | 11/24/2003 | 11/25/2003 | 11/25/2003 | A | PART |
Troy Cobbley
|
|
|
a temporary occupancy was issued until the fire extinguishers can be changed to 4A20BC's. All other life safety issues OK 11/25/2003 11:09:02 AM
|
BLD-Final | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | NR |
Jim Sly
|
|
|
###-####--ron Need all req signatures. 11/25/2003 1:17:45 PM
|
Code Occupancy Approval Temp | | | 11/25/2003 | | DONE |
|
|
|
MISSING SMALL AMOUNT OF GRASS, SIGNED TEMP AND WILL BOND FOR $550.00
|
FIRE-Final Inspection | 11/19/2003 | 11/24/2003 | 11/24/2003 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguishers, remove the two exits signs at the locked doors and provide breaker lock on breaker 13 and final fire alarm 11/24/2003 12:25:49 PM
|
BLD-Framing/Rough-in | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | PART |
Jim Storey
|
|
|
ceiling grid-- ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok pending mech and fire r/i mech failed 11/5/2003 10:28:59 AM
|
BLD-Framing/Rough-in | 11/3/2003 | 11/4/2003 | 11/4/2003 | A | PASS |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore 11/4/2003 9:25:47 AM
|
BLD-Framing/Rough-in | 10/3/2003 | 10/6/2003 | 10/6/2003 | A | PASS |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | PART |
Russ Owen
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara MooreSubject to special inspection. 8/19/2003 12:27:41 PM
|
BLD-Foundation | 8/12/2003 | 8/12/2003 | 8/12/2003 | P | PART |
Jim Sly
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore North found wall and piers....OK pending special ins (STRATA) tests and appr. 8/12/2003 3:26:53 PM
|
BLD-Footing | 8/4/2003 | 8/5/2003 | 8/5/2003 | A | PART |
Russ Owen
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk pending s-i. 8/5/2003 5:24:38 PM
|
BLD-Footing | 7/31/2003 | 7/31/2003 | 7/31/2003 | P | PART |
Russ Owen
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Subject to special inspection.. 7/31/2003 1:56:11 PM
|
BLD-Foundation | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PART |
Russ Owen
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Ok pending s-i. 7/29/2003 11:43:18 AM
|
BLD-Footing | 7/24/2003 | 7/24/2003 | 7/24/2003 | P | PART |
Tony Young
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pending special inspection report 7/24/2003 4:20:48 PM
|
BLD-Footing | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | PASS |
Russ Owen
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
(F) Reprint permit | | | 7/11/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/10/2003 | | DONE |
|
|
|
|
Telephone call | | | 7/10/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Issue PAID IN FULL permit | | | 7/10/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/9/2003 | | 7/9/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2003 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 5/5/2003 | | 7/9/2003 | | PASS |
John Menard
|
|
|
7/9/2003 09:58:59 JCM - activity updated through activity BLDA022 from case BLD03-00986.
|
Routing - FIRE | 7/3/2003 | | 7/8/2003 | | DONE |
|
|
|
previously approved; refer to 7/1/03 Fire plan review entry.
|
Routing - PLAN CHECK | 7/2/2003 | | 7/3/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/3/2003 | | PASS |
|
|
|
Reviewed and approved revisions as submitted. JCM
|
Routing - FIRE | 6/25/2003 | | 7/1/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/27/2003 | | DONE |
|
|
|
Resubmittal sheets E-0, E-1, E-3, E-5, E-7, E-9 received and forwarded to John Menard.
|
Plan resubmittals received | | | 6/26/2003 | | DONE |
|
|
|
response letter from Larson Arch. with a certificate of accreditation, two sheets of SP-1,two sheets of AD-2, two sheets of TA-1,TA-2, TA-2A, TA-7, P-2, one sheet of S2.1, S2.2, S2.1, S2.2 and taken to John M.
|
Routing - PLAN CHECK | 6/18/2003 | | 6/25/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 6/24/2003 | | |
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLUMBING | 6/13/2003 | | 6/18/2003 | | PASS |
|
|
|
united waters fire flow letter states a static pressure for this p[roject of 90 psi, provide a prv set at a max of 80 psi, the evaporative coolers are to be installed with flush and fill kits, provide an rp on the water line to them, min. cover on the pressure sewer line is to be 3', clean outs will be required on the pressure sewer line every 100'. if the pressure sewer line is not at least 12' under the water line, protect in an approved manor, pressure sewer system is approved under the alternate methods of the 2000 upc.
|
Routing - PLANNING | 6/11/2003 | | 6/13/2003 | | PASS |
|
|
|
Approve per DRH02-219
|
Routing Off Site - STRUCTURAL | 5/27/2003 | | 6/11/2003 | | PASS |
|
|
|
Contacted PDQ to take plans to outside engineering. 5/23/03 received shop and terminal plans. kmm Received fax from consulting structural engineer indicating that the structural plans had been approved as submitted. JCM
|
Routing - Erosion and Sediment | 6/9/2003 | | 6/10/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans. ESC approved under 03-00556
|
Routing - PUBLIC WORKS | 5/29/2003 | | 6/9/2003 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/27/2003 | | 5/29/2003 | | PASS |
|
|
|
Parcel is over 5 acres in size.
|
Plan routing begun/NEW & ADDTN | | | 5/27/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2003 | | DONE |
|
|
|
|
Additional plans submitted | | | 5/22/2003 | | DONE |
|
|
|
Received three copies of pre-engineered plans for the terminla building. Put with plans. kmm
|
Additional plans submitted | | | 5/7/2003 | | DONE |
|
|
|
Received one copy of each inventory of Chemical used @ shop building and MSDS sheets. Table of summary of exempt amounts. Put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 5/5/2003 | | FAIL |
|
|
|
Requires 1. Application for shop
2. Application for guard shack
3. Revised cert. of value for terminal minus the shop and shack values.
4. Three copies of pre engineered building plans and calcs.
5. Two copies of ESC plan for building set.
Contacted Cornel and Dawna at ###-####
Plans in hold box. kmm
5/7/03 Received 1. Two copies of ESC manual and drawings
2.Revised cert. of value for the Terminal and cert. of values for the shop building and the
guard shack. Put the above items with the plans. Still waiting for the pre-engineered blg. plans and calcs. I will start the permits for the shack and shop once I recieve the pre-engineered plans. kmm
5/21/03 Received three copies of terminal bldg. pre-engineered plans, put with plans. kmm
5/23/03 Received three copies of shop bldg. pre-engineered plans. Put with plans. kmm
|
Application received | | | 5/1/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/1/2003 | | DONE |
|
|
|
|
Fee Review-notes | 5/1/2003 | 5/1/2003 | | | |
|
|
|
|