Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-00986
StatusFinaled
Name CORNEL LARSON
Site Address 111 N CLOVERDALE RD
Project NameFed Ex Freight
Customer Number 
ePlanReviewNo
Description
FedEx Freight Terminal Building * To construct a new 31,100 square foot, one story, pre-engineered steel office and warehouse building and related site improvements. This building is fully fire sprinklered. Office: 4280 sq. ft. Warehouse: 26,820 sq. ft. All construction per the approved plans and attached comment list. DRH02-00219/PC#239-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/4/2005  
First Notice 4/9/20044/9/2004 DONE
Permanent occupancy  4/9/2004 DONE
Perm. Occ. Cert. # 10092 issued 4-9-04 to Fed Ex Freight.
Permanent Occupancy 3/30/20043/30/2004 DONE
Details
Code Occupancy Approval  3/30/2004 PAS
ALL LANDSCAPE IN AS REQUIRED FINAL SIGNED OFF AND RELEASE OF BOND
FIRE-Final Inspection11/25/200311/26/200311/26/2003APASS
DetailsTroy Cobbley
fire life safety finaled 11/26/2003 12:21:59 PM
FIRE-Final Inspection11/25/200311/26/200311/26/2003APASS
DetailsTroy Cobbley
fire life safety finaled 11/26/2003 12:21:59 PM
BLD-Final11/25/200311/26/200311/26/2003APART
DetailsJim Sly
RON; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Temp Occ. Need perm Occ. status on Fire, Mech, and Zoning....OK to final for Perm after these finals. C/N Obtain Perm Occ. status within 90 days of this notice. 11/26/2003 8:54:11 AM
Temporary occupancy  11/26/2003 DONE
Temp. Occ. Cert. # 5028 issued 11-26-03 to FedEx Freight Terminal Building.
BLD-Final11/24/200311/25/200311/25/2003ANR
DetailsJim Sly
Mike ###-#### Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 11/25/2003 8:57:23 AM
FIRE-Final Inspection11/24/200311/25/200311/25/2003APART
DetailsTroy Cobbley
a temporary occupancy was issued until the fire extinguishers can be changed to 4A20BC's. All other life safety issues OK 11/25/2003 11:09:02 AM
BLD-Final11/25/200311/25/200311/25/2003PNR
DetailsJim Sly
###-####--ron Need all req signatures. 11/25/2003 1:17:45 PM
Code Occupancy Approval Temp  11/25/2003 DONE
MISSING SMALL AMOUNT OF GRASS, SIGNED TEMP AND WILL BOND FOR $550.00
FIRE-Final Inspection11/19/200311/24/200311/24/2003AFAIL
DetailsTroy Cobbley
Provide fire extinguishers, remove the two exits signs at the locked doors and provide breaker lock on breaker 13 and final fire alarm 11/24/2003 12:25:49 PM
BLD-Framing/Rough-in11/4/200311/5/200311/5/2003APART
DetailsJim Storey
ceiling grid-- ron; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok pending mech and fire r/i mech failed 11/5/2003 10:28:59 AM
BLD-Framing/Rough-in11/3/200311/4/200311/4/2003APASS
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore 11/4/2003 9:25:47 AM
BLD-Framing/Rough-in10/3/200310/6/200310/6/2003APASS
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation8/18/20038/19/20038/19/2003APART
DetailsRuss Owen
ron; Phone #: ###-#### Internet Inspection Request from: Barbara MooreSubject to special inspection. 8/19/2003 12:27:41 PM
BLD-Foundation8/12/20038/12/20038/12/2003PPART
DetailsJim Sly
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore North found wall and piers....OK pending special ins (STRATA) tests and appr. 8/12/2003 3:26:53 PM
BLD-Footing8/4/20038/5/20038/5/2003APART
DetailsRuss Owen
ron; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk pending s-i. 8/5/2003 5:24:38 PM
BLD-Footing7/31/20037/31/20037/31/2003PPART
DetailsRuss Owen
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Subject to special inspection.. 7/31/2003 1:56:11 PM
BLD-Foundation7/28/20037/29/20037/29/2003APART
DetailsRuss Owen
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Ok pending s-i. 7/29/2003 11:43:18 AM
BLD-Footing7/24/20037/24/20037/24/2003PPART
DetailsTony Young
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
pending special inspection report 7/24/2003 4:20:48 PM
BLD-Footing7/21/20037/22/20037/22/2003APASS
DetailsRuss Owen
ron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
(F) Reprint permit  7/11/2003  
Inspection Record Card- Bld  7/10/2003 DONE
Print Occupancy Form  7/10/2003 DONE
Telephone call  7/10/2003 DONE
LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  7/10/2003 DONE
Routing - PLAN CHECK7/9/2003 7/9/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/9/2003 PASS
Plan assigned to (JCM)5/5/2003 7/9/2003 PASS
DetailsJohn Menard
7/9/2003 09:58:59 JCM - activity updated through activity BLDA022 from case BLD03-00986.
Routing - FIRE7/3/2003 7/8/2003 DONE
previously approved; refer to 7/1/03 Fire plan review entry.
Routing - PLAN CHECK7/2/2003 7/3/2003 PASS
Plan Reviewer's activity  7/3/2003 PASS
Reviewed and approved revisions as submitted. JCM
Routing - FIRE6/25/2003 7/1/2003 PASS
Plan resubmittals received  6/27/2003 DONE
Resubmittal sheets E-0, E-1, E-3, E-5, E-7, E-9 received and forwarded to John Menard.
Plan resubmittals received  6/26/2003 DONE
response letter from Larson Arch. with a certificate of accreditation, two sheets of SP-1,two sheets of AD-2, two sheets of TA-1,TA-2, TA-2A, TA-7, P-2, one sheet of S2.1, S2.2, S2.1, S2.2 and taken to John M.
Routing - PLAN CHECK6/18/2003 6/25/2003 FAIL
Plan resubmittals requested  6/24/2003  
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLUMBING6/13/2003 6/18/2003 PASS
united waters fire flow letter states a static pressure for this p[roject of 90 psi, provide a prv set at a max of 80 psi, the evaporative coolers are to be installed with flush and fill kits, provide an rp on the water line to them, min. cover on the pressure sewer line is to be 3', clean outs will be required on the pressure sewer line every 100'. if the pressure sewer line is not at least 12' under the water line, protect in an approved manor, pressure sewer system is approved under the alternate methods of the 2000 upc.
Routing - PLANNING6/11/2003 6/13/2003 PASS
Approve per DRH02-219
Routing Off Site - STRUCTURAL5/27/2003 6/11/2003 PASS
Contacted PDQ to take plans to outside engineering. 5/23/03 received shop and terminal plans. kmm Received fax from consulting structural engineer indicating that the structural plans had been approved as submitted. JCM
Routing - Erosion and Sediment6/9/2003 6/10/2003 PASS
ESC approved with conditions attached to plans. ESC approved under 03-00556
Routing - PUBLIC WORKS5/29/2003 6/9/2003 PASS
Routing - PLANNING Land Div5/27/2003 5/29/2003 PASS
Parcel is over 5 acres in size.
Plan routing begun/NEW & ADDTN  5/27/2003 DONE
Plans ACCEPTED BY PLAN TECH  5/23/2003 DONE
Additional plans submitted  5/22/2003 DONE
Received three copies of pre-engineered plans for the terminla building. Put with plans. kmm
Additional plans submitted  5/7/2003 DONE
Received one copy of each inventory of Chemical used @ shop building and MSDS sheets. Table of summary of exempt amounts. Put with plans. kmm
Plans ACCEPTED BY PLAN TECH  5/5/2003 FAIL
Requires 1. Application for shop
2. Application for guard shack
3. Revised cert. of value for terminal minus the shop and shack values.
4. Three copies of pre engineered building plans and calcs.
5. Two copies of ESC plan for building set.
Contacted Cornel and Dawna at ###-####
Plans in hold box. kmm
5/7/03 Received 1. Two copies of ESC manual and drawings
2.Revised cert. of value for the Terminal and cert. of values for the shop building and the
guard shack. Put the above items with the plans. Still waiting for the pre-engineered blg. plans and calcs. I will start the permits for the shack and shop once I recieve the pre-engineered plans. kmm
5/21/03 Received three copies of terminal bldg. pre-engineered plans, put with plans. kmm
5/23/03 Received three copies of shop bldg. pre-engineered plans. Put with plans. kmm
Application received  5/1/2003  
Recd Pcfee & Taken To Pln CK  5/1/2003 DONE
Fee Review-notes5/1/20035/1/2003