BLD-Aging Inspection | 5/11/2009 | 5/11/2009 | 5/19/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/19/2009 | 5/19/2009 | 5/19/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/20/2009 | 2/20/2009 | 2/27/2009 | | PART |
Dave Hannah
|
|
|
waiting for fire
|
BLD-Aging Inspection | 12/5/2008 | 12/5/2008 | 12/9/2008 | | DONE |
Forrest France
|
|
|
Okay for final
|
BLD-Aging Inspection | 9/9/2008 | 9/9/2008 | 9/11/2008 | | CANC |
Forrest France
|
|
|
|
BLD-Aging Inspection | 7/7/2008 | 7/7/2008 | 7/9/2008 | | DONE |
Forrest France
|
|
|
Pending fire sprinkler permit final- verification of system main control valve supervision.
|
FIRE-Final Inspection | 1/24/2008 | 1/25/2008 | 1/30/2008 | A | PART |
Forrest France
|
|
|
Pending verification of a fire alarm supervisory switch at the main control valve for the fire sprinkler system.
|
BLD-Aging Inspection | 1/18/2008 | 1/18/2008 | 1/24/2008 | P | DEFR |
Forrest France
|
|
|
Inspection scheduled.
|
BLD-Aging Inspection | 1/15/2008 | 1/15/2008 | 1/18/2008 | P | DEFR |
Forrest France
|
|
|
Scheduled.
|
BLD-Aging Inspection | 1/15/2008 | 1/15/2008 | 1/18/2008 | | DEFR |
Dave Hannah
|
|
|
needs fire finals sent to fire
|
BLD-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/15/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/10/2007 | 8/10/2007 | 8/14/2007 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2006 | 8/2/2006 | 8/8/2006 | | DEFR |
Forrest France
|
|
|
|
BLD-Aging Inspection | 4/4/2006 | 4/4/2006 | 4/4/2006 | | DEFR |
Dave Hannah
|
|
|
waiting for fire dept sign off
|
BLD-Aging Inspection | 1/16/2006 | 1/16/2006 | 1/18/2006 | | DEFR |
Forrest France
|
|
|
|
BLD-Aging Inspection | 9/28/2005 | 9/28/2005 | 9/30/2005 | | PASS |
Forrest France
|
|
|
waiting on fire
|
BLD-Aging Inspection | 7/7/2005 | 7/7/2005 | 7/8/2005 | | DONE |
Forrest France
|
|
|
Left message with Dennis at ###-#### for requirements to final this permit.
|
FIRE-Final Inspection | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | FAIL |
Troy Cobbley
|
|
|
Contact: ###-####. Inspection was a conference to see what items are needed for a final. Dennis is to provide verification that min control valve for the fire sprinkler system is monitored by the fire alarm system
|
BLD-Aging Inspection | 4/27/2005 | 4/27/2005 | 4/28/2005 | | NR |
Troy Cobbley
|
|
|
I spoke to Dennis. He is going to call in an inspection to go over all outstanding issues.
|
BLD-Aging Inspection | 9/17/2004 | 9/17/2004 | 9/17/2004 | | PASS |
Rick Jackson
|
|
|
contractor out of town until october 2nd 9/17/2004 9:34:08 AM
|
BLD-Aging Inspection | 7/13/2004 | 7/13/2004 | 7/13/2004 | | PART |
Rick Jackson
|
|
|
Talked to Dennis and he will get the inspections called as the fire alarm panel has been installed and sprinkler system has received an annual inspection 7/13/2004 4:13:01 PM
|
BLD-Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PART |
Carl Dependahl
|
|
|
ok for t/o...need fire ok 8/1/2003 2:14:45 PM
|
FIRE-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PART |
Troy Cobbley
|
|
|
Fire alarm and fire life safety given a temporary occupancy per Dave Miller until the main control vavle has been supervised by the fire alarm system. This will require city approved drawings. Contractor still needs to provide the annual inspection report so any other major issues can be addressed 7/31/2003 9:51:07 AM
|
BLD-Final | 7/30/2003 | 7/31/2003 | 7/31/2003 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 12:57:21 PM. Contact: ###-####.
|
Telephone call | | | 7/30/2003 | | DONE |
|
|
|
Documenting 7/30/03 (and other) telcon's with Bryan Connor, (Thornton Oliver Keller), Ken Webster, (Allied General), Dave Miller, and consultation with Carl Westfall regarding alarm requirements for this building. Concluded we need to have a discussion with the owner and architect to determine extent of existing protection, under what code it was installed, if it was required at the time of installation, the original occupancy of the building, and whether it met the existing code at that time, as well as what the anticipated occupancy(s) is intended to be., Then we can properly determine the code requirements. Until otherwise approved by the PDS/FD, the existing alarm system shall be maintained in service. Bryan will work with the building owner to set up such a meeting.
|
BLD-Conference | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | PASS |
Carl Dependahl
|
|
|
dennis ###-####..rec'd concrete test report from Strata, ok. 7/21/2003 4:09:24 PM
|
BLD-Framing/Rough-in | 7/21/2003 | 7/21/2003 | 7/21/2003 | P | PASS |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 1:32:16 PM. ..walls ok 7/21/2003 1:32:53 PM
|
BLD-Framing/Rough-in | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 7/15/2003 at 1:10:22 PM. Contact: ###-####....need actual spec insp data 7/16/2003 10:24:42 AM
|
BLD-Concrete | 6/19/2003 | 6/20/2003 | 6/20/2003 | P | CANC |
Carl Dependahl
|
|
|
lintel
|
BLD-Conference | 6/18/2003 | 6/19/2003 | 6/19/2003 | A | CANC |
Carl Dependahl
|
|
|
Dennis
|
BLD-Concrete | 6/19/2003 | 6/19/2003 | 6/19/2003 | P | NR |
Carl Dependahl
|
|
|
|
BLD-Conference | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PASS |
Carl Dependahl
|
|
|
need spec insp for lintel...5000psi concrete spec'd. 6/18/2003 3:50:16 PM
|
BLD-Concrete | 6/16/2003 | 6/17/2003 | 6/17/2003 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 4:44:48 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 6/6/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2003 | | PASS |
|
|
|
|
Telephone call | | | 6/5/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Inspection Record Card- Bld | | | 6/5/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/3/2003 | | 6/4/2003 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 5/8/2003 | | 6/4/2003 | | PASS |
Carl Westfall
|
|
|
6/4/2003 16:21:13 CJW - activity updated through activity BLDA022 from case BLD03-01020.
|
Routing - FIRE | 5/22/2003 | | 6/2/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/9/2003 | | 5/22/2003 | | |
|
|
|
Failed first UBC plan review. UBC plan review started May 21, 2003 and finished the next day. A response from the architect was required. See the plan review report.
|
Plan resubmittals received | | | 5/14/2003 | | DONE |
|
|
|
received letter of transmittal, two copies of concrete rectangular & tee beam design, along with two A2.1 plans and taken to Carl W.
|
Routing - PUBLIC WORKS | 5/8/2003 | | 5/9/2003 | | PASS |
Brandi Dominguez
|
|
|
|
Application received | | | 5/6/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/6/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2003 | | DONE |
|
|
|
|
First Notice | 5/19/2009 | 5/19/2009 | | | |
Dave Hannah
|
|
|
|
Fee Review-notes | 5/6/2003 | 5/6/2003 | | | |
|
|
|
|