Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-01026
StatusExpired
Name DBSI (NO TENANT)
Site Address 10356 W FAIRVIEW AVE Unit: 100
Project NameVILLAGE SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(DBSI - NO TENANT - SUITE100) This building is fire sprinklered. To remodel an existing 5,883 square foot one story building. Three (3) separate "shell" tenant spaces are being created (Suite 100 - 2,951 square feet, Suite 104 - 1,246 square feet, Suite 105 - 1,606 square feet). The specific tenants have NOT been disclosed. Separate tenant improvement permits OR occupancy approval permits are required for each tenant space before occupancy. A CERTIFICATE OF OCCUPANCY SHALL NOT BE ISSUED TO ANY PORTION OF THIS BUILDING UNTIL THE EAST PROPERTY LINE HAS BEEN MOVED AWAY FROM THE EAST EXTERIOR WALL OR THIS ISSUE OTHERWISE RESOLVED. Work is to include new beams, columns, and concrete footings at new exterior openings; new store front glazing systems at new exterior openings; new Exterior Insulation and Finish System; new interior beam and columns to replace a bearing wall; 6 (or perhaps 5) restrooms accessible to the disabled; interior nonbearing walls; and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. A demolition permit (BLD03-01079) was issued earlier. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH03-00048 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired4/17/20064/17/20064/17/2006PPASS
DetailsJim Sly
Fire finaled/ struct OK for final............no permits tied to this case to verify finals (Plumb & HVAC) Going to Exp.
FIRE-Final Inspection4/6/20044/6/20044/6/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Framing/Rough-in1/22/20041/23/20041/23/2004APART
DetailsJim Sly
dennis-t grid insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grid OK. 1/23/2004 11:06:31 AM
BLD-Final12/19/200312/22/200312/22/2003AFAIL
DetailsJim Sly
dennis; Phone #: ###-#### Internet Inspection Request from: Darla Downs Need at least a temp occ.from plumb and hvac before temp from structural. 12/22/2003 8:31:05 AM
BLD-Final12/18/200312/19/200312/19/2003ANR
DetailsRuss Owen
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. needs fire / life safety prior to final bld. 12/19/2003 10:43:54 AM
FIRE-Final Inspection12/19/200312/19/200312/19/2003PPART
DetailsTroy Cobbley
Temp occupancy given until the fire alarm and fire sprinklers are finaled
BLD-Framing/Rough-in12/15/200312/16/200312/16/2003APASS
DetailsJim Sly
Dennis --- T grid; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/16/2003 10:19:55 AM
Plan resubmittals received  12/15/2003 DONE
Received three copies of revised sheets G1.0, SD-1, A1.1, A1.2, A2.1 AND A2.2. Routed to Carl W. kmm
Plan Reviewer's activity  12/15/2003 DONE
Reviewed and approved resubmittal. Called Scott Martin with DBSI to tell him he could pick them up.
FIRE-Conference12/9/200312/10/200312/10/2003ADONE
DetailsTroy Cobbley
I spoke with dave miller and he said that he would be ok with a temp. occupancy on the shell core so that the check cashing place can open as long as the fire sprinkler system was operational. The alarm system drawings are being reviewed at this time 12/10/2003 12:31:25 PM
BLD-Conference12/8/200312/9/200312/9/2003APART
DetailsJim Sly
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 12/9/2003 9:31:36 AM 12/9/2003 10:21:53 AM Met with Dennis and rep from DBSI .....advised to have Conf insp with Fire and Code inforcement (p&z) For requirements to allow for finals on Shell/Core. The property line issue has been resolved, approved by Tim Hogland, and has been Recorded. 12/9/2003 12:22:57 PM 12/9/2003 12:26:59 PM
BLD-Conference12/5/200312/8/200312/8/2003APART
DetailsJim Sly
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Discussed property line. 12/8/2003 11:24:07 AM
BLD-Conference12/8/200312/8/200312/8/2003PCANC
DetailsJim Sly
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in10/7/200310/7/200310/7/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/7/2003 at 6:37:02 AM. Contact: ###-####. Inspected roof Gables too....OK. 10/7/2003 10:47:03 AM
BLD-Conference9/2/20039/3/20039/3/2003APART
DetailsJim Sly
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Warned of property line at East side to be moved prior to any Occupancy. Engineer of record to be reviewing special insp reports for conc, welding, epoxy, etc. Will Req final letter from Eng. E wall OK to cover. 9/3/2003 9:29:29 AM
BLD-Foundation8/4/20038/5/20038/5/2003APART
DetailsJim Sly
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Footing for columns and beam W wall MTI on site. 8/5/2003 12:59:06 PM
BLD-Footing7/31/20037/31/20037/31/2003PPART
DetailsJim Sly
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore MTI on site 7/31/2003 4:03:33 PM
BLD-Foundation7/10/20037/11/20037/11/2003APASS
DetailsSteven Webb
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation7/2/20037/3/20037/3/2003PPART
DetailsDave Hannah
###-#### dennis all but three perm ftgs ok to pour 7/3/2003 3:46:32 PM
Issue PAID IN FULL permit  6/26/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/19/2003 PASS
Inspection Record Card- Bld  6/19/2003 DONE
Telephone call  6/19/2003 DONE
left message with scott martin permit ready and fees due
Routing - PLAN CHECK6/5/2003 6/19/2003 PASS
Drawings approved after resubmittal review.
Plan assigned to (CJW)5/9/2003 6/19/2003 PASS
DetailsCarl Westfall
6/19/2003 08:49:58 CJW - activity updated through activity BLDA022 from case BLD03-01026.
Plan resubmittals received  6/9/2003 DONE
Received 2 copies of revised sheets S-1.1, S-2.1, S-7.1, A-1.2, A-2.2, A-4.1, A-6.1, M-1, M-2, EN-1, E-2.0, EC-1.0. One copy of plan review resub. response. One copy of letter to Tim Terry from Mint Peterson. One letter to Drew fromSteven Hardy. One copy of HVAC Calculations. Routed to Carl W. kmm
Routing - FIRE5/27/2003 6/5/2003 PASS
Routing - PLAN CHECK5/14/2003 5/27/2003  
Failed first IBC plan review. IBC plan review started May 23, and finished May 27. A response from the architect was required. See the plan review report.
Routing - PLANNING5/13/2003 5/14/2003 PASS
Approved per DRH03-48.
Routing - PUBLIC WORKS5/9/2003 5/13/2003 PASS
Received Certificate of Value  5/9/2003 DONE
received revised certificate of value
Plans ACCEPTED BY PLAN TECH  5/9/2003  
Plans ACCEPTED BY PLAN TECH  5/7/2003  
Failed initially. Plan submitted under one building permit for three spaces. Requires one revised cover sheet of application and a certificate of value, two new cover sheets and certificates of value to reflect the remaining vanilla finishes. Contacted Scott of DBSI of whats required plans with us until received above items.
Application received  5/6/2003  
Recd Pcfee & Taken To Pln CK  5/6/2003  
Fee Review-notes5/6/20035/6/2003