DOC - Permit Expired | 7/15/2004 | 7/15/2004 | 7/15/2004 | A | PASS |
Dave Hannah
|
|
|
Expired by inspector at 7/15/2004 9:25:06 AM
|
BLD-Aging Inspection | 7/14/2004 | 7/14/2004 | 7/14/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/22/2003 | 9/22/2003 | 9/22/2003 | | DONE |
Dave Hannah
|
|
|
exp on 12/20 9/26/2003 3:58:20 PM
|
Issue & PRINT to be Invoiced | | | 6/23/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2003 | | DONE |
|
|
|
E-MAILED CURTIS THAT PERMIT IS READY
|
Plan resubmittals received | | | 6/10/2003 | | DONE |
|
|
|
Received engineers response concerning new openings in existing shear wall. Structural Engineer, Kent Soelberg stamped, signed and dated as okay after his evaluation. Copy attached to plans.
|
Routing - PLAN CHECK | 6/10/2003 | | 6/10/2003 | | PASS |
|
|
|
Approved as noted and attached and engineers design evaluation and approval.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2003 | | PASS |
|
|
|
To permit desk to issue.
|
Routing - FIRE | 6/10/2003 | | 6/10/2003 | | PASS |
|
|
|
Reviewed scope of work involved with Sam rogers. Does not involve IFC code items, existing fire supression system or alarm system within the scope of this project work. Does not need to review.
|
Routing Off Site -Energy | | | 6/10/2003 | | PASS |
|
|
|
Not routed off site. Work included new masonry glass block only with SHGC & U-Value noted on plans. Future tenant improvement for operating rooms & support areas will provide insulation, HVAC & electrical energy compliance as part of the T.I. package.
|
Plan assigned to (DRS) | 5/12/2003 | | 6/10/2003 | | PASS |
Dan Stuart
|
|
|
6/10/2003 15:53:10 DRS - activity updated through activity BLDA022 from case BLD03-01042.
|
Routing - PLAN CHECK | 5/19/2003 | | 6/9/2003 | | FAIL |
|
|
|
Need additional engineering for new concrete cut outs in basement wall. Called architect Art albanese to request said information.
|
Telephone call | | | 6/9/2003 | | DONE |
|
|
|
Called Art Albanese to request evaluation and approval criteria from the structural engineer for the existing concrete walls being cutt to allow installation of the glass block. Need to know the existing reinforcement conditions across the concrete beam being created to span the new openings and any special considerations required to cut out the concrete and install the glass block. Art will follow up with Ken Soleberg, CH2M HILL, Structural Engineer.
|
Plan resubmittals requested | | | 6/9/2003 | | FAIL |
|
|
|
Called Art Albanese. Submitted plans did not include engineering analysis of existing concrete wall and any required items that would be involved structurally when the concrete is removed from existing foundation. Art will contact engineer for required engineering analysis.
|
Routing - PLANNING | 5/16/2003 | | 5/16/2003 | | PASS |
|
|
|
Approve
|
Routing - PUBLIC WORKS | 5/15/2003 | | 5/16/2003 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/16/2003 | | 5/16/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 5/12/2003 | | 5/15/2003 | | PASS |
|
|
|
Approved, addition to existing building.
|
Additional plans submitted | | | 5/14/2003 | | |
|
|
|
Recieved 3 copies of ESC plan and one copy of plan report. Put with plans. kmm
|
Plan routing begun/TENANTS | | | 5/12/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2003 | | DONE |
|
|
|
Mr Roylance came and signed civil sheets. Jim Rogers will meet with Curtis on the Job Site to determine ESC requirements. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 5/8/2003 | | FAIL |
|
|
|
Civil sheets need to be signed. Need to get in touch with Jim Rogers about ESC. Contacted Curtis at ###-####. Plans in hold box. kmm
|
Application received | | | 5/7/2003 | | |
|
|
|
|