Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-01058
StatusFinaled
Name DBSI (NO TENANT)
Site Address 10356 W FAIRVIEW AVE Unit: 104
Project NameVILLAGE SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(DBSI - NO TENANT - SUITE 104) This building is fire sprinklered. To remodel an existing 5,883 square foot one story building. Three (3) separate "shell" tenant spaces are being created (Suite 100 - 2,951 square feet, Suite 104 - 1,246 square feet, Suite 105 - 1,606 square feet). The specific tenants have NOT been disclosed. Separate tenant improvement permits OR occupancy approval permits are required for each tenant space before occupancy. A CERTIFICATE OF OCCUPANCY SHALL NOT BE ISSUED TO ANY PORTION OF THIS BUILDING UNTIL THE EAST PROPERTY LINE HAS BEEN MOVED AWAY FROM THE EAST EXTERIOR WALL OR THIS ISSUE OTHERWISE RESOLVED. Work is to include new beams, columns, and concrete footings at new exterior openings; new store front glazing systems at new exterior openings; new Exterior Insulation and Finish System; new interior beam and columns to replace a bearing wall; 6 restrooms accessible to the disabled; interior nonbearing walls; and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. A demolition permit (BLD03-01079) was issued earlier. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH03-00048 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 1/7/20044/26/2005 DONE
DOC - Permit Finaled1/7/20041/7/20041/7/2004APASS
DetailsJim Sly
Finaled by inspector at 1/7/2004 8:07:29 AM
BLD-Final1/6/20041/7/20041/7/2004APASS
DetailsJim Sly
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Shell/core Vanilla finish OK. 1/7/2004 8:07:21 AM
FIRE-Final Inspection1/5/20041/5/20041/5/2004PPASS
DetailsTroy Cobbley
Dennis; Phone #: ###-#### Fire life safety OK 1/5/2004 1:13:03 PM
BLD-Final1/5/20041/5/20041/5/2004PPART
DetailsJim Sly
t-grid inspection as well. Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Grid OK 1/5/2004 4:50:44 PM
FIRE-Final Inspection12/19/200312/19/200312/19/2003PPART
DetailsTroy Cobbley
Temp occupancy given until the fire alarm and fire sprinklers are finaled
Plan resubmittals received  12/15/2003 DONE
Received three copies of revised sheets G1.0, SD-1, A1.1, A1.2, A2.1 AND A2.2. Routed to Carl W. kmm
Plan Reviewer's activity  12/15/2003 DONE
Reviewed and approved resubmittal. Called Scott Martin to tell him it was done.
BLD-Conference12/5/200312/8/200312/8/2003APART
DetailsJim Sly
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Discussed property line. 12/8/2003 11:24:30 AM
BLD-Conference12/8/200312/8/200312/8/2003PCANC
DetailsJim Sly
Dennis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in10/7/200310/7/200310/7/2003PPASS
DetailsJim Sly
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation8/4/20038/5/20038/5/2003APART
DetailsJim Sly
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs Footing for steel columns and beam....W. Wall 8/5/2003 12:59:43 PM
BLD-Footing7/31/20037/31/20037/31/2003PPART
DetailsJim Sly
dennis; Phone #: ###-#### Internet Inspection Request from: Annette Moore MTI on site. 7/31/2003 4:03:58 PM
BLD-Foundation7/10/20037/11/20037/11/2003APASS
DetailsSteven Webb
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation7/2/20037/3/20037/3/2003PPART
DetailsDave Hannah
###-#### dennis perm ftg ok to pour 7/3/2003 3:50:17 PM
Issue PAID IN FULL permit  6/26/2003 DONE
Routing - PLAN CHECK6/5/2003 6/19/2003 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  6/19/2003 PASS
Inspection Record Card- Bld  6/19/2003 DONE
Telephone call  6/19/2003 DONE
left message with scott martin permit ready and fees due
Plan assigned to (CJW)5/9/2003 6/19/2003 PASS
DetailsCarl Westfall
6/19/2003 08:50:33 CJW - activity updated through activity BLDA022 from case BLD03-01058.
Plan resubmittals received  6/9/2003 DONE
Received 2 copies of revised sheets S-1.1, S-2.1, S-7.1, A-1.2, A-2.2, A-4.1, A-6.1, M-1, M-2, EN-1, E-2.0, EC-1.0. One copy of plan review resub. response. One copy of letter to Tim Terry from Mint Peterson. One letter to Drew fromSteven Hardy. One copy of HVAC Calculations. Routed to Carl W. kmm
Routing - FIRE5/27/2003 6/5/2003 PASS
Routing - PLAN CHECK5/14/2003 5/27/2003  
Failed first IBC plan review. IBC plan review started May 23, 2003 and finished May 27, 2003. A response from the architect was required. See the plan reveiw report. E-mailed a response to the architect.
Routing - PLANNING5/13/2003 5/14/2003 PASS
DetailsSarah Schafer
routed with bld03-01058. No planning review required for this permit.
Routing - PUBLIC WORKS5/9/2003 5/13/2003 PASS
Plans ACCEPTED BY PLAN TECH  5/9/2003 DONE
Application received  5/8/2003  
Fee Review-notes5/8/20035/8/2003