| Code Occupancy Approval | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 1/8/2004 1:38:00 PM
|
| First Notice | | 1/8/2004 | 1/8/2004 | | DONE |
|
|
|
|
| PubWorks Occupancy Approval | 1/8/2004 | 1/8/2004 | 1/8/2004 | | DONE |
|
|
|
Drainage project complete, OK to sign permanent occupancy to C.Weisshaupt 1/8/04. D.Erskine
|
| Permanent Occupancy | | 1/8/2004 | 1/8/2004 | | DONE |
|
|
|
|
| Permanent occupancy | | | 1/8/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 9924 issued 1-8-04 to Brassey, Wetherell, Crawford & MCCurdy, LLP.
|
| BLD-Final | 12/30/2003 | 12/31/2003 | 12/31/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2003 at 1:33:50 PM. Contact: ###-####. 12/31/2003 10:11:13 AM ok for perm occ 12/31/2003 10:12:07 AM
|
| Print Occupancy Form | | | 12/31/2003 | | DONE |
|
|
|
|
| Inspection Record Card- Bld | | | 12/31/2003 | | DONE |
|
|
|
|
| FIRE-Final Inspection | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 9:53:02 PM. Contact: ###-####.
|
| BLD-Final | 11/25/2003 | 11/26/2003 | 11/26/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 9:53:41 PM. Contact: ###-####. c/n on site 11/26/2003 3:26:44 PM
|
| FIRE-Final Inspection | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 5:22:13 PM. Contact: ###-####.
|
| BLD-Final | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 5:22:57 PM. Contact: ###-####.
|
| FIRE-Final Inspection | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 11:09:49 PM. Contact: ###-####. ADA ramp door hardware not lever; exit signs on 2nd floor to be relocated per plans; is basement lid to be enclosed?; door hardware on office doors; address 10/31/2003 4:26:41 PM
|
| BLD-Final | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2003 at 11:10:31 PM. Contact: ###-####. needs fire life safty 11/3/2003 7:54:06 AM
|
| BLD-Final | 10/29/2003 | 10/30/2003 | 10/30/2003 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/29/2003 at 8:08:56 PM. Contact: ###-####.needs other trades fanaled 10/30/2003 3:27:13 PM
|
| FIRE-Final Inspection | 10/29/2003 | 10/30/2003 | 10/30/2003 | P | NR |
Troy Cobbley
|
|
|
Inspection was actually a conference. I went over the life safety notes with the contractor. Specifically the placement of fire extinguishers. 10/30/2003 2:37:57 PM
|
| BLD-Framing/Rough-in | 8/13/2003 | 8/14/2003 | 8/14/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 7:54:01 PM. Contact: ###-####. shear ok to cover ext and int shear walls also ok to start covering int walls new office area first and sec floors foem seal is done contractor will cieling off on second floor hallway so mec can be checked after units are set 8/14/2003 4:02:10 PM
|
| BLD-Framing/Rough-in | 8/12/2003 | 8/13/2003 | 8/13/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 4:02:41 PM. Contact: ###-####.
|
| BLD-Framing/Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | FAIL |
Carl Dependahl
|
|
|
need plans... 8/13/2003 3:04:34 PM
|
| BLD-Framing/Rough-in | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | FAIL |
Carl Dependahl
|
|
|
complete air seal, provide plans 8/13/2003 3:01:06 PM
|
| BLD-Framing/Rough-in | 8/10/2003 | 8/11/2003 | 8/11/2003 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/10/2003 at 9:02:37 PM. Contact: ###-####.
|
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 7:14:15 PM. Contact: ###-####....nail shear panels & sills per plan, obtain hvac ok; no further insp. 8/8/2003 11:51:16 AM
|
| BLD-Foundation | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PART |
Carl Dependahl
|
|
|
jeremy stem wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...pending strata's reports 7/11/2003 1:27:25 PM
|
| BLD-Footing | 7/7/2003 | 7/8/2003 | 7/8/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 2:08:21 PM. Contact: ###-####.need compaction report from stradia special insp. for fill and rebar clearance from bottom of footing. ground in place. 7/8/2003 2:10:45 PM
|
| Issue PAID IN FULL permit | | | 7/2/2003 | | DONE |
|
|
|
|
| Routing - PLAN CHECK | 6/25/2003 | | 6/25/2003 | | PASS |
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2003 | | PASS |
|
|
|
|
| Print Occupancy Form | | | 6/25/2003 | | DONE |
|
|
|
|
| Telephone call | | | 6/25/2003 | | DONE |
|
|
|
permit ready and need ACHD
|
| Plan assigned to (CJW) | 5/14/2003 | | 6/25/2003 | | PASS |
Carl Westfall
|
|
|
6/25/2003 08:46:09 CJW - activity updated through activity BLDA022 from case BLD03-01063.
|
| Routing - FIRE | 6/23/2003 | | 6/24/2003 | | PASS |
|
|
|
Resubmittal acceptable.
|
| Routing - PLAN CHECK | 6/18/2003 | | 6/23/2003 | | |
|
|
|
|
| Plan resubmittals received | | | 6/23/2003 | | DONE |
|
|
|
Memo letter form T.J. Scofield & Associates, letter from United Water, 2 Calculation plans, taken to Carl W.
|
| Routing - FIRE | 6/13/2003 | | 6/17/2003 | | |
|
|
|
Failed first IFC review. Hydrant and available water flow info required.
|
| Routing - PLAN CHECK | 5/29/2003 | | 6/13/2003 | | PASS |
|
|
|
UBC plan review started June 9, 2003 and finished June 13, 2003. The drawings were approved with conditions. See the conditions list.
|
| Routing - PLUMBING | 5/27/2003 | | 5/28/2003 | | PASS |
|
|
|
1. existing water heater needs T&P with drain 2. verify floor drain for T&P drains in basement 3. L-2 lavs need vents
|
| Routing - PLANNING | 5/21/2003 | | 5/23/2003 | | PASS |
|
|
|
Approved per DRH03-51.
|
| Routing - PUBLIC WORKS | 5/14/2003 | | 5/16/2003 | | PASS |
|
|
|
Brian, Gene stated on 5/12/03 that he had talked with you earlier and that you had told him nothing was needed. kmm
|
| Routing - Erosion and Sediment | 5/16/2003 | | 5/16/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
| Routing - PLANNING Land Div | 5/12/2003 | | 5/14/2003 | | PASS |
|
|
|
|
| Pending Assignment by DJO | 5/12/2003 | | 5/14/2003 | | DONE |
Dan Overy
|
|
|
5/14/2003 11:40:23 KMM - activity updated through activity BLDA172 from case BLD03-01063.
|
| Plan routing begun/NEW & ADDTN | | | 5/12/2003 | | DONE |
|
|
|
|
| Plans ACCEPTED BY PLAN TECH | | | 5/12/2003 | | DONE |
|
|
|
Had Gene Kelly talk with Brian M. On 5/12/03 Gene stated he had talked with Brian earlier and that Brian did not require any civil. kmm
|
| Override - Parcel Holds | | | 5/8/2003 | | |
|
|
|
|
| Application received | | | 5/8/2003 | | |
|
|
|
|
| Override - Parcel Holds | | | 5/8/2003 | | |
|
|
|
|
| Recd Pcfee & Taken To Pln CK | | | 5/8/2003 | | DONE |
|
|
|
|
| Fee Review-notes | 5/8/2003 | 5/8/2003 | | | |
|
|
|
|