Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-01107
StatusFinaled
Name PINE CREEK DEVELOPMENT
Site Address 6305 W OVERLAND RD
Project NameInterchange Sub #1
Customer Number 
ePlanReviewNo
Description
(Pacific Republic Mortgage) To construct a new 7100 sq. ft., one story, wood framed office building and related site improvements. This building will be fully fire sprinklered. All construction per the approved plans and attached comment list. DRH03-00035, CUP03-00014, PC#277-03/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/6/20044/6/2004 DONE
Permanent Occupancy 4/6/20044/6/2004 DONE
Details
Permanent occupancy  4/6/2004 DONE
Perm. Occ. Cert. # 10081 issued 4-6-04 to Pacific Republic Mortgage.
BLD-Final4/1/20044/2/20044/2/2004APASS
DetailsRuss Owen
Georeg insp 305 Meet with builder and approved grab bars as they are close only3/16 in out and to resolve the toilets would have to be removed , this hardship and in the future they will use a different toilet. 4/1/2004 7:00:14 PM Ok for a perm oc. 4/1/2004 7:00:29 PM
BLD-Final3/17/20043/18/20043/18/2004AFAIL
DetailsRuss Owen
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Posted c/n on front window same c/n. grab bars. 3/18/2004 1:24:52 AM
BLD-Final3/16/20043/16/20043/16/2004PFAIL
DetailsRuss Owen
Glen; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes prior c/n grab bars 1-1/2 clearance at lids contractor on site notified. 3/15/2004 11:46:54 PM
FIRE-Final Inspection3/15/20043/15/20043/15/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final1/8/20041/9/20041/9/2004PCANC
DetailsRuss Owen
Glen.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Final Inspection1/9/20041/9/20041/9/2004APART
DetailsTroy Cobbley
A temporary occupancy was given until the fire alarm plans have been resubmitted showing the access control connected to the fire alarm. All other fire alarm devices have been tested. Fire life safety items are ok. I notified the contractor that painting the curbing for fire dept access will become an issue when the next building is built.
BLD-Final1/6/20041/9/20041/9/2004APART
DetailsRuss Owen
OK, TEMP OC PENDING A C/N 1/9/2004 12:20:26 PM
Temporary occupancy  1/9/2004 DONE
Temp. Occ. Cert. # 5057 issued 1-9-04 to the Pacific Republic Mortgage.
FIRE-Final Inspection1/6/20041/8/20041/8/2004AFAIL
DetailsTroy Cobbley
###-#### GLENN No approved plans on site 1/8/2004 11:36:07 AM
FIRE-Supply Line Hydro1/6/20041/8/20041/8/2004AFAIL
DetailsTroy Cobbley
No approved plans on site 1/8/2004 11:35:45 AM
FIRE-Alarm Testing1/6/20041/8/20041/8/2004AFAIL
DetailsTroy Cobbley
No approved plans on site 1/8/2004 11:35:39 AM
Code Occupancy Approval Temp  1/8/2004 DON
BOND IN PLACE FOR LANDSCAPE AND DUMPSTER AREA SCREENING FOR $4785.OO SO I SIGNED TEMP OCCUPANCY
PubWorks Occupancy Approval12/5/200312/5/200312/5/2003 DONE
Drainage project complete, signed permanent occupancy 12/05/03. D.Erskine
BLD-Energy code compliance10/17/200310/20/200310/20/2003APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/17/2003 at 4:24:22 PM. Contact: ###-####. Ok leter from architect with reference to insulation change. 10/20/2003 11:46:37 AM
BLD-Framing/Rough-in10/13/200310/14/200310/14/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/13/2003 at 1:22:06 PM. Contact: ###-####. allready done. 10/13/2003 10:22:06 PM
BLD-Energy code compliance10/13/200310/14/200310/14/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/13/2003 at 1:22:58 PM. Contact: ###-####. Need detail from architect for insulation in attic area. Called contractor. 10/14/2003 5:02:36 PM
BLD-Framing/Rough-in9/24/20039/26/20039/26/2003APASS
DetailsRuss Owen
BLD-Framing/Rough-in9/25/20039/25/20039/25/2003PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/25/2003 at 8:15:15 AM. Contact: ###-####.
BLD-Wall cover9/22/20039/22/20039/22/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/22/2003 at 8:19:25 AM. Contact: ###-####.ok to side 9/23/2003 12:44:50 AM
BLD-Framing/Rough-in9/22/20039/22/20039/22/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/22/2003 at 8:42:10 AM. Contact: ###-####. posted c/n 9/23/2003 12:45:00 AM
BLD-Conference9/17/20039/19/20039/19/2003PPART
DetailsRuss Owen
Please meet with Jed and project engineer at 2:00pm with engineer. 9/17/2003 11:32:27 PM Went over job with engineer on site clairified items missing from approved plans. 9/19/2003 12:19:14 AM
BLD-Wall cover9/17/20039/17/20039/17/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/17/2003 at 9:26:32 AM. Contact: ###-####. I have posted a c/n for a meeting with the project engineer and builder. callede and left message with builder.9/16/2003 10:00:07 PM 9/16/2003 10:01:19 PM
BLD-Foundation7/23/20037/23/20037/23/2003PPASS
DetailsRuss Owen
STEVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
(F) Reprint permit  7/23/2003 DONE
Inspection Record Card- Bld  7/23/2003 DONE
Print Occupancy Form  7/23/2003 DONE
BLD-Footing7/21/20037/22/20037/22/2003APASS
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Meeting  7/22/2003 DONE
name changed from Dave Evans to Pine Creek per letter from Dave Evans. LH
(F) Reprint permit  7/22/2003 DONE
Print Occupancy Form  7/22/2003 DONE
Inspection Record Card- Bld  7/22/2003 DONE
(F) Reprint permit  7/21/2003  
Telephone call  7/17/2003  
let customer know permit is ready
Issue & PRINT permit  7/17/2003 DONE
Inspection Record Card- Bld  7/17/2003 DONE
Print Occupancy Form  7/17/2003 DONE
Routing Off Site - STRUCTURAL7/11/2003 7/16/2003 PASS
Contacted PDQ to take revised plans of 7/11/03 to outside engineering. kmm Received a fax from the consulting structural engineer approving resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/16/2003 PASS
Plan assigned to (JCM)5/15/2003 7/16/2003 PASS
DetailsJohn Menard
7/16/2003 14:06:07 JCM - activity updated through activity BLDA022 from case BLD03-01107.
Routing - PLAN CHECK6/26/2003 7/16/2003 PASS
Plan resubmittals received  7/11/2003 DONE
Received three copies of reivsed sheets 7 and revised calculations. Routed to John M. kmm
Plan resubmittals requested  7/8/2003  
Faxed the contractor a copy of the comments from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL6/26/2003 7/7/2003 FAIL
Received fax from consulting structural engineer requesting additional revisions and calculations. JCM
Routing - PLAN CHECK6/25/2003 6/26/2003  
Routing - PLANNING6/26/2003 6/26/2003 PASS
Plan Reviewer's activity  6/25/2003 PASS
Reviewed and approved resubmitted plan sheets as drawn, includeing resubmittals on energy. JCM
Routing - FIRE6/25/2003 6/25/2003 PASS
DetailsBill Alexander
Routing - FIRE6/20/2003 6/24/2003 FAIL
building is to be sprinklered but no details of valving provided as required in initial review. Added sprinkler and fire alarm comments. Revised review comments faxed to Wes Steel, ###-####.
Plan resubmittals received  6/20/2003 DONE
transmittal letter, two copies of sheet 8 and EN-1 and taken to John
Routing - PUBLIC WORKS6/18/2003 6/20/2003 PASS
Plan resubmittals requested  6/18/2003  
Faxed the achitect a request for additional revisions, not addressed on the original resubmitted plan sheets. JCM
Routing - PLANNING Land Div6/18/2003 6/18/2003 PASS
Approved for one building permit on parcel. Parcel will be included as part of Interchange Subdivision.
Routing - PLAN CHECK6/11/2003 6/18/2003  
Plan resubmittals received  6/17/2003 DONE
transmittal letter from Dave Evans, two copies of a letter from United Water, with 2 of page 1, 2 of page 3, two copies of pages 1 thru 5 and taken to John M
Plan Review Completed(1st rev)  6/10/2003 DONE
Routing - FIRE6/5/2003 6/10/2003 FAIL
DetailsBill Alexander
Requires hydrant, fire flows and underground appurtenance locations. (if fire sprinklering).
Plan resubmittals received  6/9/2003 DONE
Received three copies of revised sheets 8 & 9. Routed to John M. kmm
Routing - PLUMBING6/3/2003 6/4/2003 PASS
provide a plan showing the required service sink and related piping, see note 10 on the building plan review.
Plan resubmittals received  6/3/2003 DONE
Received six copies of revised sheets 8 & 9. Routed to John M. kmm
Plan resubmittals requested  6/3/2003  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  6/3/2003  
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK5/29/2003 6/3/2003  
Routing Off Site - STRUCTURAL5/27/2003 6/2/2003 FAIL
Contacted PDQ to take struct. calcs to outside engineering. kmm Received a faxed copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING5/28/2003 5/29/2003 FAIL
need plumbing isometrics of dwv and water with a fixture schedule including water heater and building backflow protection device
Routing - PLANNING5/28/2003 5/28/2003 PASS
Routing - PUBLIC WORKS5/19/2003 5/27/2003 FAIL
1. Incomplete site plan.
2. This will be in a new subdivision, so the addresswill be different. Per AM
Routing - Erosion and Sediment5/27/2003 5/27/2003 PASS
ESC approved with conditions attached to plans.
Routing - PLANNING Land Div5/16/2003 5/19/2003 FAIL
Need site of entire property with setbacks marked from exterior property lines and proposed future lot lines. Left messsage with Wes Steele on Monday, May 19, 2003.
Plans ACCEPTED BY PLAN TECH  5/16/2003 DONE
Plan routing begun/NEW & ADDTN  5/16/2003  
Application received  5/14/2003  
Recd Pcfee & Taken To Pln CK  5/14/2003  
Fee Review-notes5/14/20035/14/2003   
Routing Off Site -Energy5/16/2003    
routed to Eric
Routing Off Site - STRUCTURAL5/16/2003    
contacted PDQ to take to outside engineering