First Notice | | 4/6/2004 | 4/6/2004 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/6/2004 | 4/6/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/6/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10081 issued 4-6-04 to Pacific Republic Mortgage.
|
BLD-Final | 4/1/2004 | 4/2/2004 | 4/2/2004 | A | PASS |
Russ Owen
|
|
|
Georeg insp 305 Meet with builder and approved grab bars as they are close only3/16 in out and to resolve the toilets would have to be removed , this hardship and in the future they will use a different toilet. 4/1/2004 7:00:14 PM Ok for a perm oc. 4/1/2004 7:00:29 PM
|
BLD-Final | 3/17/2004 | 3/18/2004 | 3/18/2004 | A | FAIL |
Russ Owen
|
|
|
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Posted c/n on front window same c/n. grab bars. 3/18/2004 1:24:52 AM
|
BLD-Final | 3/16/2004 | 3/16/2004 | 3/16/2004 | P | FAIL |
Russ Owen
|
|
|
Glen; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes prior c/n grab bars 1-1/2 clearance at lids contractor on site notified. 3/15/2004 11:46:54 PM
|
FIRE-Final Inspection | 3/15/2004 | 3/15/2004 | 3/15/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Final | 1/8/2004 | 1/9/2004 | 1/9/2004 | P | CANC |
Russ Owen
|
|
|
Glen.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 1/9/2004 | 1/9/2004 | 1/9/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire alarm plans have been resubmitted showing the access control connected to the fire alarm. All other fire alarm devices have been tested. Fire life safety items are ok. I notified the contractor that painting the curbing for fire dept access will become an issue when the next building is built.
|
BLD-Final | 1/6/2004 | 1/9/2004 | 1/9/2004 | A | PART |
Russ Owen
|
|
|
OK, TEMP OC PENDING A C/N 1/9/2004 12:20:26 PM
|
Temporary occupancy | | | 1/9/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5057 issued 1-9-04 to the Pacific Republic Mortgage.
|
FIRE-Final Inspection | 1/6/2004 | 1/8/2004 | 1/8/2004 | A | FAIL |
Troy Cobbley
|
|
|
###-#### GLENN No approved plans on site 1/8/2004 11:36:07 AM
|
FIRE-Supply Line Hydro | 1/6/2004 | 1/8/2004 | 1/8/2004 | A | FAIL |
Troy Cobbley
|
|
|
No approved plans on site 1/8/2004 11:35:45 AM
|
FIRE-Alarm Testing | 1/6/2004 | 1/8/2004 | 1/8/2004 | A | FAIL |
Troy Cobbley
|
|
|
No approved plans on site 1/8/2004 11:35:39 AM
|
Code Occupancy Approval Temp | | | 1/8/2004 | | DON |
|
|
|
BOND IN PLACE FOR LANDSCAPE AND DUMPSTER AREA SCREENING FOR $4785.OO SO I SIGNED TEMP OCCUPANCY
|
PubWorks Occupancy Approval | 12/5/2003 | 12/5/2003 | 12/5/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 12/05/03. D.Erskine
|
BLD-Energy code compliance | 10/17/2003 | 10/20/2003 | 10/20/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/17/2003 at 4:24:22 PM. Contact: ###-####. Ok leter from architect with reference to insulation change. 10/20/2003 11:46:37 AM
|
BLD-Framing/Rough-in | 10/13/2003 | 10/14/2003 | 10/14/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/13/2003 at 1:22:06 PM. Contact: ###-####. allready done. 10/13/2003 10:22:06 PM
|
BLD-Energy code compliance | 10/13/2003 | 10/14/2003 | 10/14/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/13/2003 at 1:22:58 PM. Contact: ###-####. Need detail from architect for insulation in attic area. Called contractor. 10/14/2003 5:02:36 PM
|
BLD-Framing/Rough-in | 9/24/2003 | 9/26/2003 | 9/26/2003 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 8:15:15 AM. Contact: ###-####.
|
BLD-Wall cover | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 8:19:25 AM. Contact: ###-####.ok to side 9/23/2003 12:44:50 AM
|
BLD-Framing/Rough-in | 9/22/2003 | 9/22/2003 | 9/22/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 8:42:10 AM. Contact: ###-####. posted c/n 9/23/2003 12:45:00 AM
|
BLD-Conference | 9/17/2003 | 9/19/2003 | 9/19/2003 | P | PART |
Russ Owen
|
|
|
Please meet with Jed and project engineer at 2:00pm with engineer. 9/17/2003 11:32:27 PM Went over job with engineer on site clairified items missing from approved plans. 9/19/2003 12:19:14 AM
|
BLD-Wall cover | 9/17/2003 | 9/17/2003 | 9/17/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/17/2003 at 9:26:32 AM. Contact: ###-####. I have posted a c/n for a meeting with the project engineer and builder. callede and left message with builder.9/16/2003 10:00:07 PM 9/16/2003 10:01:19 PM
|
BLD-Foundation | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | PASS |
Russ Owen
|
|
|
STEVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
(F) Reprint permit | | | 7/23/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/23/2003 | | DONE |
|
|
|
|
BLD-Footing | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | PASS |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Meeting | | | 7/22/2003 | | DONE |
|
|
|
name changed from Dave Evans to Pine Creek per letter from Dave Evans. LH
|
(F) Reprint permit | | | 7/22/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/22/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/21/2003 | | |
|
|
|
|
Telephone call | | | 7/17/2003 | | |
|
|
|
let customer know permit is ready
|
Issue & PRINT permit | | | 7/17/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/17/2003 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/11/2003 | | 7/16/2003 | | PASS |
|
|
|
Contacted PDQ to take revised plans of 7/11/03 to outside engineering. kmm Received a fax from the consulting structural engineer approving resubmittals. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2003 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 5/15/2003 | | 7/16/2003 | | PASS |
John Menard
|
|
|
7/16/2003 14:06:07 JCM - activity updated through activity BLDA022 from case BLD03-01107.
|
Routing - PLAN CHECK | 6/26/2003 | | 7/16/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/11/2003 | | DONE |
|
|
|
Received three copies of reivsed sheets 7 and revised calculations. Routed to John M. kmm
|
Plan resubmittals requested | | | 7/8/2003 | | |
|
|
|
Faxed the contractor a copy of the comments from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 6/26/2003 | | 7/7/2003 | | FAIL |
|
|
|
Received fax from consulting structural engineer requesting additional revisions and calculations. JCM
|
Routing - PLAN CHECK | 6/25/2003 | | 6/26/2003 | | |
|
|
|
|
Routing - PLANNING | 6/26/2003 | | 6/26/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/25/2003 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets as drawn, includeing resubmittals on energy. JCM
|
Routing - FIRE | 6/25/2003 | | 6/25/2003 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 6/20/2003 | | 6/24/2003 | | FAIL |
|
|
|
building is to be sprinklered but no details of valving provided as required in initial review. Added sprinkler and fire alarm comments. Revised review comments faxed to Wes Steel, ###-####.
|
Plan resubmittals received | | | 6/20/2003 | | DONE |
|
|
|
transmittal letter, two copies of sheet 8 and EN-1 and taken to John
|
Routing - PUBLIC WORKS | 6/18/2003 | | 6/20/2003 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 6/18/2003 | | |
|
|
|
Faxed the achitect a request for additional revisions, not addressed on the original resubmitted plan sheets. JCM
|
Routing - PLANNING Land Div | 6/18/2003 | | 6/18/2003 | | PASS |
|
|
|
Approved for one building permit on parcel. Parcel will be included as part of Interchange Subdivision.
|
Routing - PLAN CHECK | 6/11/2003 | | 6/18/2003 | | |
|
|
|
|
Plan resubmittals received | | | 6/17/2003 | | DONE |
|
|
|
transmittal letter from Dave Evans, two copies of a letter from United Water, with 2 of page 1, 2 of page 3, two copies of pages 1 thru 5 and taken to John M
|
Plan Review Completed(1st rev) | | | 6/10/2003 | | DONE |
|
|
|
|
Routing - FIRE | 6/5/2003 | | 6/10/2003 | | FAIL |
Bill Alexander
|
|
|
Requires hydrant, fire flows and underground appurtenance locations. (if fire sprinklering).
|
Plan resubmittals received | | | 6/9/2003 | | DONE |
|
|
|
Received three copies of revised sheets 8 & 9. Routed to John M. kmm
|
Routing - PLUMBING | 6/3/2003 | | 6/4/2003 | | PASS |
|
|
|
provide a plan showing the required service sink and related piping, see note 10 on the building plan review.
|
Plan resubmittals received | | | 6/3/2003 | | DONE |
|
|
|
Received six copies of revised sheets 8 & 9. Routed to John M. kmm
|
Plan resubmittals requested | | | 6/3/2003 | | |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 6/3/2003 | | |
|
|
|
Mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 5/29/2003 | | 6/3/2003 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/27/2003 | | 6/2/2003 | | FAIL |
|
|
|
Contacted PDQ to take struct. calcs to outside engineering. kmm Received a faxed copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 5/28/2003 | | 5/29/2003 | | FAIL |
|
|
|
need plumbing isometrics of dwv and water with a fixture schedule including water heater and building backflow protection device
|
Routing - PLANNING | 5/28/2003 | | 5/28/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/19/2003 | | 5/27/2003 | | FAIL |
|
|
|
1. Incomplete site plan.
2. This will be in a new subdivision, so the addresswill be different. Per AM
|
Routing - Erosion and Sediment | 5/27/2003 | | 5/27/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLANNING Land Div | 5/16/2003 | | 5/19/2003 | | FAIL |
|
|
|
Need site of entire property with setbacks marked from exterior property lines and proposed future lot lines. Left messsage with Wes Steele on Monday, May 19, 2003.
|
Plans ACCEPTED BY PLAN TECH | | | 5/16/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/16/2003 | | |
|
|
|
|
Application received | | | 5/14/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/14/2003 | | |
|
|
|
|
Fee Review-notes | 5/14/2003 | 5/14/2003 | | | |
|
|
|
|
Routing Off Site -Energy | 5/16/2003 | | | | |
|
|
|
routed to Eric
|
Routing Off Site - STRUCTURAL | 5/16/2003 | | | | |
|
|
|
contacted PDQ to take to outside engineering
|