Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD03-01135
StatusFinaled
Name RUSSELL CORPORATION
Site Address 7805 W GRATZ DR
Project NameLyle Pearson
Customer Number 
ePlanReviewNo
Description
Lyle Pearson Jaguar/Land Rover/Volvo * To construct a 23, 677 sq. ft. Type VB, fully fire sprinklered 2-story auto dealership with associated sales lot. Other work inlcudes all site improvements, paving and landscaping per approved plans and attachments. !st floor sq. ft. 19,525 2nd floor sq. ft. 4152. Grading done under permit BLD03-01080. Fire sprinklers used for area. DRH03-00016
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/21/20044/22/20044/22/2004APASS
DetailsTom Arcoraci
Bob, ###-#### - please call him 1st so he knows you're going out. I have the sign off card & everyone has signed off for final. Thanks, Russ!
First Notice 4/22/20044/22/2004 DONE
Permanent Occupancy 4/22/20044/22/2004 DONE
Details
Permanent occupancy UNPAID FEE  4/22/2004 DONE
Perm. Occ. Cert. # 10105 issued 4-22-04 to Lyle Pearson Jaguar/land Rover/Volvo.
Code Occupancy Approval  4/20/2004 PASS
The required CU has been applied for the storage of dirt off sight so I signed off the final occupancy ref, CUP04-00036
Fee Review-notes5/16/20035/16/20034/14/2004 DONE
FIRE-Final Inspection4/6/20044/7/20044/7/2004APASS
DetailsTroy Cobbley
fire lfie safety finaled 10/15/2003 11:37:58 PM
FIRE-Final Inspection2/12/20042/12/20042/12/2004PFAIL
DetailsTroy Cobbley
Door hardware issues still need addressed. Provide labels on the electrical panels. Provide map at the facp annunciator. Provide "No Parking - Fire Lane" text on red curbing
FIRE-Final Inspection2/3/20042/4/20042/4/2004APART
DetailsTroy Cobbley
Fire life safety given a temporary occupancy until the fire alarm resubmittals have been approved and the alarm system tested. The sprinkler system was given a temp until the fire alarm is tested as well 2/4/2004 9:55:43 AM
BLD-Final2/3/20042/4/20042/4/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/3/2004 at 2:34:39 PM. Contact: ###-####. Ok temp co, c/n posted for items. 2/4/2004 5:23:06 PM
BLD-Final2/3/20042/4/20042/4/2004ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/3/2004 at 4:42:04 PM. Contact: ###-####.
Temporary occupancy  2/4/2004 DONE
Temp. Occ. Cert. # 5071 issued 2-4-04 to Lyle Pearson.
BLD-Final2/3/20042/3/20042/3/2004PNR
DetailsTroy James
Scheduled by a contractor via Hello! on 2/3/2004 at 10:37:36 AM. Contact: ###-####.
FIRE-Conference2/3/20042/3/20042/3/2004PDONE
DetailsTroy Cobbley
Fire life safety items are ok when the fire sprinklers and fire alarm are finaled
Code Occupancy Approval Temp2/2/20042/2/20042/2/2004PDONE
DetailsScott M.Brown
SIGNED TEMP OCCUPANCY BECAUSE Z.C. ISSUED FOR THE DIRT PILE ON LOT NEXT DOOR (7849 GRANTZ) WILL SIGN FINAL WHEN CONDITIONAL USE PERMIT FILED FOR 2/2/2004 2:06:46 PM
BLD-Conference2/2/20042/2/20042/2/2004PDONE
DetailsTroy Cobbley
Went over life safety issues and notes with the general contractor. I looks like they need a racking permit
BLD-Conference1/28/20041/28/20041/28/2004PPART
DetailsRuss Owen
went over break room counters will be cut down. 1/29/2004 1:50:03 PM
BLD-Conference1/26/20041/27/20041/27/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/26/2004 at 4:38:52 PM. Contact: ###-####. Ceiling grid ok,have details from architect. also talked about access for sinks. 1/27/2004 4:42:32 PM
Code Occupancy Approval Temp  1/27/2004 FAIL
TO BOND OR REMOVE THE DIRT REMOVED FROM THIS LOCATION PLACED ON VACANT LOT LOCATED JUST WEST OF SITE, ADDRESS 7849 GRATZ, MAY OBTAIN SOME TYPE OF ZOING APPROVAL. NEEDS THIS DONE TO SIGN TEMP OCCUPANCY
BLD-Other1/23/20041/23/20041/23/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/23/2004 at 10:21:04 AM. Contact: ###-####. needs lights tied up a letter from architect for ceiling 1/23/2004 2:55:43 PM
BLD-Other1/21/20041/22/20041/22/2004AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/21/2004 at 4:09:50 PM. Contact: ###-####. ceiling grid c/n posted. 1/22/2004 1:02:12 PM
BLD-Energy code compliance12/11/200312/12/200312/12/2003APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/11/2003 at 4:50:39 PM. Contact: ###-####.
BLD-Framing/Rough-in12/11/200312/12/200312/12/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/11/2003 at 4:51:18 PM. Contact: ###-####. ok all walls. 12/12/2003 10:19:09 AM
BLD-Framing/Rough-in12/8/200312/9/200312/9/2003ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/8/2003 at 1:45:10 PM. Contact: ###-####.
BLD-Energy code compliance12/8/200312/9/200312/9/2003ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/8/2003 at 1:45:53 PM. Contact: ###-####.
BLD-Energy code compliance12/9/200312/9/200312/9/2003PPART
DetailsRuss Owen
Ok pending new com check report. 12/9/2003 2:17:29 PM
BLD-Energy code compliance12/5/200312/5/200312/5/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/5/2003 at 7:15:26 AM. Contact: ###-####. will be back to check allwork after completion partial only Architect has a new report to submit showing insulation values as on plans r-15 wall report shows r-21. does not match plans typicall. 12/5/2003 12:30:12 PM
BLD-Energy code compliance12/5/200312/5/200312/5/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/5/2003 at 7:16:10 AM. Contact: ###-####. lower wall ok. 12/5/2003 3:40:14 PM
BLD-Framing/Rough-in12/2/200312/3/200312/3/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/2/2003 at 4:48:50 PM. Contact: ###-####. Need to putty pad boxes in 2 hr wall. ok to insulate exterior and complete drywall at all other interior locations .contractor on site . 12/3/2003 2:23:56 PM
BLD-Framing/Rough-in11/24/200311/25/200311/25/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/24/2003 at 4:23:57 PM. Contact: ###-####. Out of Time. 11/24/2003 10:37:38 PM
BLD-Framing/Rough-in11/24/200311/25/200311/25/2003PPART
DetailsRuss Owen
Need to build the 2 hr celings at locations shown on plans also at stair enclosure the walls will need to go to roof deck, needs plumbing approved and insulation inspection ok to rock 1 side only Bob with Russell corp on site and will resolve. 11/24/2003 10:37:04 PM
BLD-Framing/Rough-in11/4/200311/5/200311/5/2003ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/4/2003 at 4:04:15 PM. Contact: ###-####.
BLD-Framing/Rough-in11/5/200311/5/200311/5/2003PPART
DetailsRuss Owen
Ok to complete above roof area. 11/5/2003 12:47:54 AM
BLD-Framing/Rough-in10/31/200310/31/200310/31/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/31/2003 at 8:43:57 AM. Contact: ###-####. north west exterior walls ok to cover. 10/31/2003 1:56:45 PM
BLD-Framing/Rough-in10/20/200310/21/200310/21/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/20/2003 at 11:45:17 AM. Contact: ###-####. 10/20/2003 7:53:39 PM
BLD-Footing7/25/20037/28/20037/28/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 7/25/2003 at 1:33:01 PM. Contact: ###-####.Ok pending special inspection approval. 7/28/2003 12:05:44 PM
BLD-Energy code compliance7/24/20037/25/20037/25/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/24/2003 at 4:31:29 PM. Contact: ###-####. OK R-10 insul at (CMU area) foundation wall. 7/25/2003 10:32:01 AM
BLD-Footing7/17/20037/18/20037/18/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 7/17/2003 at 9:18:08 AM. Contact: ###-####.. out of time recalled. 7/18/2003 12:20:44 PM
BLD-Footing7/18/20037/18/20037/18/2003PPART
DetailsRuss Owen
ok MTI will inspect. 7/18/2003 3:18:44 PM
(F) Reprint permit  7/7/2003  
Routing Off Site - STRUCTURAL7/2/2003 7/3/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/3/2003 DONE
Inspection Record Card- Bld  7/3/2003 DONE
Print Occupancy Form  7/3/2003 DONE
Telephone call  7/3/2003 DONE
LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  7/3/2003 DONE
Plan assigned to (MLO)5/19/2003 7/3/2003 PASS
DetailsMike Otto
7/3/2003 10:41:02 MLO - activity updated through activity BLDA022 from case BLD03-01135.
Routing Off Site - STRUCTURAL6/20/2003 7/2/2003 FAIL
contacted PDQ to take to outside engineering. Corrections faxed and mailed to architect
Plan resubmittals requested  7/2/2003 DONE
structural corrections
Routing - PLANNING5/27/2003 6/30/2003 PEND
Approved Per CFH03-00010. Hold permit until July 1, 2003 at which time the appeal period will expire. Verify no appeals were filed prior to issuing any permits. MAP

Approve per DRH03-16 in accordance with plans on file. TKW
Routing - FIRE6/25/2003 6/28/2003 PASS
Resubmittal acceptable.
Routing - PLAN CHECK6/23/2003 6/24/2003 PASS
Plan resubmittals received  6/24/2003 DONE
Plan resubmittal sheet M1.1 received and forwarded to Mike Otto.
Routing Off Site -Energy6/20/2003 6/24/2003 PASS
contacted Eric
Plan resubmittals received  6/20/2003 DONE
Received two copies of revised sheets A0.2, A0.3, C-1, C-2, A8.1, S2.1, S2.2, S3.1, S4.1, S4.2, S4.4, E2.0, E2.1F. Two copies of response letter. Two copies of struct. calcs. kmm. Routed to Mike Otto
Plan resubmittals received  6/19/2003 FAIL
Received two copies of revised sheets A0.2, A0.3, C-1, C-2, A8.1, S2.1, S2.2, S3.1, S4.1, S4.2, S4.4, E2.0, E2.1F. Two copies of response letter, lighting compliance, Annomated site map, summary of haz. material, supplemental calcs. Routed to Mike O. kmm Plan resubs are insufficient. Lacking resubs for outside structural and engergy as requested to be provided in plan review reports. Architect notified to provide additional plans. MLO
Routing - PLAN CHECK6/10/2003 6/10/2003 NR
Routing - FIRE6/4/2003 6/9/2003 FAIL
Review comments faxed to architect; hazardous materials, storage arrangements and sprinkler control valve issues.
Routing Off Site -Energy5/19/2003 6/4/2003 FAIL
Contacted Eric M. for energy review. kmm corrections faxed and mailed to architect. MLO
Routing Off Site - STRUCTURAL5/19/2003 6/4/2003 FAIL
Contacted PDQ to take plans to outside engineering. kmm corrections faxed and mailed to architect. MLO
Plan resubmittals requested  6/4/2003 DONE
corrections structural, energy, IBC
Routing - PLAN CHECK6/2/2003 6/4/2003 FAIL
corrections faxed and mailed to architect
Routing - PLUMBING5/29/2003 5/30/2003 PASS
1. sheet P1.1-all vents in a combination waste and vent system need a cleanout. 2. trench drain outlets to include a catch basin with a santee on end of drain with a plug in to of it. 3. SP-1 drain line needs a cleanout every fifty feet.
Routing - Erosion and Sediment5/27/2003 5/27/2003 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS5/19/2003 5/23/2003 PASS
DetailsBrandi Dominguez
Routing - PLANNING Land Div5/19/2003 5/19/2003 PASS
Lots 2 and 3 combined by metes and bounds description on warranty deed recorded on May 2, 2003.
Plans ACCEPTED BY PLAN TECH  5/19/2003 DONE
Plan routing begun/NEW & ADDTN  5/19/2003 DONE
Application received  5/16/2003  
Recd Pcfee & Taken To Pln CK  5/16/2003