Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01172
StatusFinaled
Name FUNNY BONE
Site Address 405 S 8TH ST Unit: 121
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(FUNNY BONE - SUITE 121) The fire sprinklers are used to substitute for 1-hr fire-resistance rated construction. To expand an existing tenant space and convert it to an A-2 Occupancy nightclub. The total size of the expanded tenant space will be 3,676 square feet. The occupant load will be 280. An approved aisle and seating diagram shall be posted near the main entrance. Work is to include interior nonbearing walls, a new entry at the alley, new stairways, new doors, new windows, new skylights, and interior finishes all per approved drawings, engineering, and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference10/17/200310/20/200310/20/2003ACANC
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Conference10/20/200310/20/200310/20/2003PPASS
DetailsDave Hannah
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final10/20/200310/20/200310/20/2003PPASS
DetailsDave Hannah
ok for perm occ
First Notice 10/20/200310/20/2003 DONE
Permanent Occupancy 10/20/200310/20/2003 DONE
Details
Permanent occupancy  10/20/2003 DONE
Perm. Occ. Cert. # 9845 issued 10-20-03 to the Funny Bone Comedy Club.
BLD-Conference6/30/20037/2/20037/2/2003PPASS
DetailsCarl Dependahl
hvac ok for t/o per 350 7/2/2003 4:29:19 PM
BLD-Final7/1/20037/2/20037/2/2003ANR
DetailsCarl Dependahl
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Final Inspection7/1/20037/2/20037/2/2003PPASS
DetailsRick Jackson
david; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final7/2/20037/2/20037/2/2003PPART
DetailsCarl Dependahl
dave, need hvac, plbg finals & hard copies weld reports...ok for t/o. 7/2/2003 4:30:24 PM
BLD-Conference6/27/20036/30/20036/30/2003PCANC
DetailsCarl Dependahl
DAVE
BLD-Conference6/24/20036/26/20036/26/2003PPASS
DetailsCarl Dependahl
dave 5732970...w/ bldr re exits 6/30/2003 1:52:19 PM
BLD-Framing/Rough-in6/24/20036/24/20036/24/2003PPART
DetailsCarl Dependahl
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore... walls ok to cover... 6/24/2003 3:30:45 PM
Routing - PLAN CHECK6/18/2003 6/19/2003 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  6/19/2003 PASS
Inspection Record Card- Bld  6/19/2003 DONE
Print Occupancy Form  6/19/2003 DONE
Telephone call  6/19/2003 DONE
CALLED LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  6/19/2003 DONE
Plan assigned to (CJW)5/20/2003 6/19/2003 PASS
DetailsCarl Westfall
6/19/2003 12:39:46 CJW - activity updated through activity BLDA022 from case BLD03-01172.
Routing - PUBLIC WORKS6/12/2003 6/18/2003 PASS
Routing - PLUMBING6/18/2003 6/18/2003 PASS
per4 plans and 2000 upc
Plan resubmittals received  6/17/2003 DONE
Letter of transmittal form CSHQA, with two copies of A1.0 and A3.0 and taken to Carl
Plan Reviewer's activity  6/12/2003 DONE
The resubmittal review was completed. The ventilation issues was not fully resolved. Sent an E-mail to Mark Gier and talked to him on the phone. Waiting for a resolution to this issue.
Routing - PLAN CHECK6/11/2003 6/12/2003  
Plan resubmittals received  6/11/2003 DONE
Letter of transmittal, Letter of response, three copies of product information, two copies of M2.0 and taken to Carl W.
Routing - PLUMBING6/9/2003 6/10/2003  
Failed 1st reveiw. please provide a detail of the bar showing fixtures to be installed, additional cross connection protection may be required.
Plan resubmittals received  6/10/2003 DONE
Response letter and letter of transmittal taken to Carl W.
Routing - PLANNING6/9/2003 6/9/2003 PASS
Routing - PUBLIC WORKS6/9/2003 6/9/2003  
Failed 2nd review.
Plan resubmittals received  6/9/2003  
Received two copies of revised sheets A1.0 & A3.0 and response letter to Carl W.and one copy of Occupancy Study. Routed to Carl W.
Routing - FIRE6/4/2003 6/9/2003 PASS
Routing - PLAN CHECK5/22/2003 6/4/2003  
Failed first IBC plan review. IBC plan review started June 3, 2003 and finished the next day. A response was required from the architect. See the plan review report.
Plan resubmittals received  5/29/2003 DONE
mechanical calculations, M1.0 sheet, and M2.0 and taken to Carl.
Plan resubmittals received  5/29/2003 DONE
letter of transmittal, M1.0, M2.0 and taken to Carl
Routing - PUBLIC WORKS5/20/2003 5/21/2003  
Details
Failed 1st review. per Connie no plumbing plan needs to route back to public works when that comes in.
Application received  5/20/2003  
Recd Pcfee & Taken To Pln CK  5/20/2003  
Plans ACCEPTED BY PLAN TECH  5/20/2003 DONE
Fee Review-notes5/20/20035/20/2003