Permit Information
Permit NumberBLD03-01183
StatusFinaled
Name THERAPEUTIC ASSOCIATES
Site Address 1520 W STATE ST. (STE. 201)
Project Name 
Customer Number 
ePlanReviewNo
Description
(THERAPEUTIC ASSOCIATES) This building is fire sprinklered to substitute for 1-hr fire-resistance rated construction. To create a 1,829 square foot physical therapist office on the 2nd floor of a 26,100 square foot, 2 story with basement, building. The common restrooms on the 2nd floor and in the basement are also being altered to be accessible to the disabled. Work is to include interior nonbearing walls, interior doors, suspended ceilings, a shower room accessible to the disabled, millwork, and interior finishes all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/10/200510/10/200510/10/2005 DONE
DetailsTony Young
First Notice10/10/200510/10/200510/10/2005 DONE
DetailsTony Young
DOC - Permit Finaled10/10/200510/10/200510/10/2005PPASS
DetailsTony Young
BLD-Conference4/4/20054/4/20054/4/2005PPASS
DetailsTony Young
verify if they have a c of o
BLD-Conference3/30/20054/1/20054/1/2005PCANC
DetailsTony Young
verify if they have a c of o
BLD-Aging Inspection8/2/20048/2/20048/2/2004 NR
DetailsTony Young
BLD-Final9/22/20039/22/20039/22/2003PPASS
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ 9/22/2003 1:17:24 PM
BLD-Final9/11/20039/12/20039/12/2003ANR
DetailsRuss Owen
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore. needs fire life safety inspection. Called and informed person.9/11/2003 6:53:50 PM 9/11/2003 6:54:19 PM 9/11/2003 6:56:53 PM
FIRE-Final Inspection9/11/20039/12/20039/12/2003PPASS
DetailsRick Jackson
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final9/12/20039/12/20039/12/2003PPART
DetailsDave Hannah
pending fire insp - dave- ###-#### call 1st before insp ok for temp occ needs to finsh ada restrooms signs and plumbing pipe padding under sinks 9/12/2003 4:49:22 PM
BLD-Framing/Rough-in8/27/20038/28/20038/28/2003APART
DetailsTony Young
DAVID CELING GRID; Phone #: ###-#### Internet Inspection Request from: Darla Downs
ceiling grid ok now, pending trades 8/28/2003 11:20:23 AM
BLD-Framing/Rough-in7/24/20037/25/20037/25/2003APART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/24/2003 at 8:19:50 AM.
ceiling grid,, verify siesmic pods at final 7/25/2003 11:18:21 AM
BLD-Framing/Rough-in7/25/20037/25/20037/25/2003PPART
DetailsTony Young
ok to cover walls after minor fixes 7/25/2003 4:40:58 PM
BLD-Conference7/25/20037/25/20037/25/2003PFAIL
DetailsTony Young
disreguard frame inspection abuot the ceiling grid comments,,, was entered on the wrong permit,,, 415
PLANS/APPL TAKEN TO FRONT DESK  7/2/2003 PASS
Inspection Record Card- Bld  7/2/2003 DONE
Print Occupancy Form  7/2/2003 DONE
Telephone call  7/2/2003 DONE
LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  7/2/2003 DONE
Plan assigned to (CJW)5/27/2003 7/2/2003 PASS
DetailsCarl Westfall
7/2/2003 08:17:28 CJW - activity updated through activity BLDA022 from case BLD03-01183.
Routing - PLAN CHECK6/25/2003 7/1/2003 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  6/26/2003 DONE
Transmittal from Russ Powers, with two sets of A0.0, A1.1, A2.1, A2.2, A4.2, and taken to Carl,
Routing - FIRE6/23/2003 6/24/2003 PASS
Routing - PLAN CHECK5/30/2003 6/23/2003  
Failed first IBC plan review. IBC plan review started June 20, 2003 and finished June 23, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the architect.
Routing - PLUMBING5/29/2003 5/30/2003 PASS
no plan no review t.i.
Routing - PUBLIC WORKS5/27/2003 5/29/2003 PASS
DetailsBrandi Dominguez
Plans ACCEPTED BY PLAN TECH  5/22/2003 DONE
Application received  5/21/2003  
Recd Pcfee & Taken To Pln CK  5/21/2003 DONE
Fee Review-notes5/21/20035/21/2003