BLD-Conference | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
|
DOC - Permit Finaled | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PASS |
Tony Young
|
|
|
should have been doc finaled
|
BLD-Final | 3/17/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Jan Rice cc issued by 415 3/18/2005 8:32:28 AM
|
BLD-Grading Inspection | 3/17/2005 | 3/17/2005 | 3/17/2005 | | DONE |
|
|
|
final grading and drainage approved
|
PubWorks Subgrade Approval | 3/15/2005 | 3/15/2005 | 3/17/2005 | | DONE |
|
|
|
Needs hillside approvals prior to building final.
|
Override - Activity Holds | 1/1/1900 | 1/1/1900 | 3/17/2005 | | |
|
|
|
per Terry ok
|
BLD-Final | 3/11/2005 | 3/11/2005 | 3/14/2005 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
Hillside requirements not complete.
|
BLD-Final | 3/8/2005 | 3/10/2005 | 3/10/2005 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
needs hillside sign off 1st 3/11/2005 9:16:07 AM
|
BLD-Framing/Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Jim Sly
|
|
|
janet; Phone #: ###-#### Internet Inspection Request from: Jan Rice Owner has copy of shear approval by engineer. 1/26/2005 10:14:34 AM
|
BLD-Energy code compliance | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Jim Sly
|
|
|
janet; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PART |
Tony Young
|
|
|
PLEASE CALL ROB WITH ANY QUESTIONS ###-####; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
seal around tub drains,,, fireblock ceiling lines,,, ok to insulate 1/20/2005 11:48:47 AM
|
BLD-Framing/Rough-in | 1/18/2005 | 1/19/2005 | 1/19/2005 | A | FAIL |
Troy James
|
|
|
Please call Rob w/questions ###-####; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
Need approved set of plans, seal package done, no shear inspection done, need letter from engineer approving shear. 1/19/2005 11:27:38 AM
|
PubWorks Subgrade Approval | 10/26/2004 | 10/26/2004 | 1/18/2005 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
|
BLD-Foundation | 11/9/2004 | 11/10/2004 | 11/10/2004 | A | PART |
Tony Young
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Jan Rice
wip,, need to add more rebar in some areas 11/10/2004 10:35:52 AM
|
Override - Activity Holds | 1/1/1900 | 1/1/1900 | 11/9/2004 | | |
|
|
|
Tony was there already & inspected
|
BLD-Footing | 11/4/2004 | 11/4/2004 | 11/4/2004 | P | PART |
Tony Young
|
|
|
###-####
basement ftgs,, wip 11/4/2004 3:26:27 PM
|
Override - Activity Holds | | | 11/4/2004 | | |
|
|
|
|
BLD-Grading Inspection | 10/11/2004 | 10/11/2004 | 10/11/2004 | | DONE |
|
|
|
Received footing subgrade approval for lower retaining wall
|
BLD-Wall cover | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | NR |
Dave Hannah
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 10/7/2004 | 10/7/2004 | 10/7/2004 | A | CANC |
Dave Hannah
|
|
|
second level retianning wall ok to pour
|
BLD-Footing | 10/4/2004 | 10/5/2004 | 10/5/2004 | A | PART |
Tom Arcoraci
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles lower retain wall wip ok 10/5/2004 9:08:58 AM
|
BLD-Footing | 9/29/2004 | 9/29/2004 | 9/29/2004 | P | NR |
Tony Young
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Concrete | 9/15/2004 | 9/16/2004 | 9/16/2004 | A | PART |
Troy James
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to place concrete to upper retaining wall. 9/16/2004 10:21:10 AM
|
BLD-Footing | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PART |
Tony Young
|
|
|
ED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
upper retaining wall ftgs,, wip 9/14/2004 11:46:09 AM
|
BLD-Grading Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | | DONE |
|
|
|
Footing subgrade for retaining wall has been approved by the geotechnical engineer.
|
BLD-Footing | 9/13/2004 | 9/13/2004 | 9/13/2004 | P | CANC |
Dave Hannah
|
|
|
ED; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 9/2/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/28/2004 | | DONE |
|
|
|
Spoke with Janet at Barclay to remind her that permit is still here and ready///5/28/04 10:45am BAM
|
Telephone call | | | 3/12/2004 | | DONE |
|
|
|
talked to rob with barclay const/per linda h. ok to extend permit for 180 days 09/12/04 (/rob will pickup in may...
|
Ready Permit EXTENDED | | | 3/12/2004 | | DONE |
|
|
|
per linda ok to extend
|
Telephone call | | | 3/10/2004 | | DONE |
|
|
|
left mess that permit is ready-needs to pickup by fir or will void
|
Telephone call | | | 3/9/2004 | | DONE |
|
|
|
left mess that permit needs to be pickup or file for ext
|
Telephone call | | | 10/23/2003 | | DONE |
|
|
|
Left message to remind that permit is ready & fees
|
Plan assigned to (DJO) | 8/13/2003 | 8/13/2003 | 8/22/2003 | | PASS |
Dan Overy
|
|
|
8/22/2003 09:24:59 DJO - activity updated through activity BLDA022 from case BLD03-01203.
|
Plan Reviewer's activity | | | 8/22/2003 | | DONE |
|
|
|
DELETED PARCEL TAG. Parcel tag originally placed on permit due to an appeal being filed through Planning on CFH03-01203. Susan Riggs notified me on 8/22/03 that it was okay to issue permit.
|
Plan Reviewer's activity | | | 8/22/2003 | | DONE |
|
|
|
appeal period over. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/22/2003 | | |
|
|
|
CALLED PERMIT READY & FEE GIVEN///DLD
|
Permit Ready to Issue | | | 8/22/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 7/8/2003 | | 8/22/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/13/2003 | | PEND |
|
|
|
review is complete. can issue permit when appeal period is over.
|
Plan Review Report | | | 8/13/2003 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/13/2003 | | |
|
|
|
|
Routing - PLANNING | 7/8/2003 | | 7/8/2003 | | FAIL |
|
|
|
An appeal has been filed. This will go to the Planning Commission on August 11th for a decision.
|
Routing - FIRE | 7/8/2003 | | 7/8/2003 | | DONE |
|
|
|
7/8/03pm - Okay. D. Miller indicates No AS required for this subdivision.
7/8/03am-No information on file for Briarhill subdivision. Requested further info from FD/Dave Miller.
|
Routing - Erosion and Sediment | 7/3/2003 | | 7/3/2003 | | PASS |
|
|
|
ESC approved with conditons attached to plans.
|
Routing - PLANNING | 6/27/2003 | | 7/3/2003 | | FAIL |
|
|
|
Can't sign off until appeal period ends at 5:00 7-7-03
|
Routing - PUBLIC WORKS | 6/27/2003 | | 6/27/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 6/27/2003 | | 6/27/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as category 1 with conditions of approval in letter from Public Works attached to the plan and this case.
|
Routing - PUBLIC WORKS GRADING | 5/29/2003 | | 6/3/2003 | | FAIL |
Rita DeYoung
|
|
|
Grading cannot be approved until Cat 1 Hillside application is submitted
|
Application received | | | 5/23/2003 | | |
|
|
|
|