Permit Information
Permit NumberBLD03-01219
StatusFinaled
Name ELKS REHABILITAION HOSPITAL
Site Address 600 N ROBBINS RD
Project NameIdaho Elks Hospital
Customer Number 
ePlanReviewNo
Description
Idaho Elks Hospital * Parking lot * To excavate, grade, and pave a parking lot per engineered plans on file as approved by the Public works department. Electrical utilities included in this permit. Install curbing and striping as noted on the plans. No builidngs to be demolished, installed or constructed under this permit. PC#299-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/11/2014 DONE
PubWorks Occupancy Approval10/11/200410/11/200410/11/2004 DONE
Drainage project complete, signed permanent occupancy 10/11/04. R.Rokovitz
BLD-Final10/4/200410/5/200410/5/2004APASS
DetailsTroy James
###-#### - colyn
/4/2004 2:24:42 PM 10/4/2004 2:25:53 PM
Letter of compliance  10/5/2004 DONE
Letter of Compliance issued 10-5-04.
Code Occupancy Approval10/5/200410/4/200410/4/2004APASS
DetailsWm. Michael Meloy
Compliance met. 10/5/2004 9:21:48 AM
BLD-Final10/4/200410/4/200410/4/2004PCANC
DetailsTroy James
Scheduled by a contractor via Hello! on 10/4/2004 at 8:05:27 AM. Contact: ###-####.
FIRE-Final Inspection9/30/20049/30/20049/30/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/30/2004 at 10:09:14 AM. Contact: ###-####.
FIRE-Final Inspection9/28/20049/28/20049/28/2004PFAIL
DetailsRick Jackson
###-#### Need curbing painted red as shown on plans 9/28/2004 1:58:05 PM
BLD-Aging Inspection9/13/20049/13/20049/13/2004 PART
DetailsTroy James
wip 9/13/2004 12:33:12 PM
BLD-Aging Inspection7/14/20047/14/20047/14/2004 PASS
DetailsTroy James
revised plans wip 7/14/2004 11:39:19 AM
CHANGE STATUS TO (ISS)  7/13/2004 DONE
already pd in full before
(F) Reprint permit  7/13/2004 DONE
Permit Ready to Issue  6/23/2004 DONE
Inspection Record Card- Bld  6/23/2004 DONE
Telephone call  6/23/2004 DONE
PERMIT READY AND FEE DUE
Plan assigned to (RAD) Rita4/30/20044/30/20046/22/2004 PASS
DetailsRita DeYoung
6/22/2004 15:09:41 RAD - activity updated through activity BLDA022 from case BLD03-01219.
Routing - PLAN CHECK6/15/2004 6/22/2004 PASS
**Plan Mod**Plans in hold box, waiting on ESC approval.
Plan resubmittals received  6/22/2004 DONE
brought in to front desk(Annette) ESC application, Steve took plans from hold box to do his review.
Routing - Erosion and Sediment6/22/2004 6/22/2004 PASS
ESC plan approved with attached conditions. Need RP prior to start of construciton.
(F) Reprint permit  6/22/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/22/2004 DONE
Routing - FIRE5/18/2004 5/21/2004 PASS
PLAN MOD - approved subject to FD access roadway as annotated on plans and attached review comments.
Routing - PLANNING5/11/2004 5/18/2004 PASS
Approve
Routing - Erosion and Sediment5/7/2004 5/10/2004 FAIL
PLAN MOD. This ESC permit has expired (valid for 6-months) A new ESC permit is required. 5-10-04 Called Pat Walsh to let him know that the ESC permit has expired and that another Applacation needs to be sent in . Pat said he would let the appropriate people know . ///dld
Routing - PUBLIC WORKS5/3/2004 5/7/2004 PASS
PLAN MOD
Routing - PLANNING Land Div5/3/2004 5/3/2004 PASS
Approved.
Plan Modification Accepted  4/30/2004 DONE
making parking lot smaller
Plan routing begun/NEW & ADDTN  4/30/2004 DONE
PLAN MOD
BLD-Aging Inspection9/17/20039/17/20039/17/2003 DONE
DetailsDave Hannah
exp on 12/15 9/17/2003 9:46:34 AM
Issue PAID IN FULL permit  6/18/2003  
Print Pending Permit.LaserJet4  6/16/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/16/2003 DONE
Inspection Record Card- Bld  6/16/2003 DONE
Telephone call  6/16/2003 DONE
permit ready
Plan assigned to (KMM)5/28/2003 6/16/2003 PASS
DetailsKathy Miller
6/16/2003 07:53:38 KMM - activity updated through activity BLDA022 from case BLD03-01219.
Routing - PLAN CHECK6/16/2003 6/16/2003 DONE
Routing - PLANNING6/10/2003 6/13/2003 PASS
Approve per DRH97-195.
Routing - FIRE6/6/2003 6/10/2003 PASS
Approved subject to field inspection, No written review comments.
Routing - PUBLIC WORKS5/29/2003 6/5/2003 PASS
Routing - Erosion and Sediment6/5/2003 6/5/2003 PASS
ESC approved with conditions attached to plans. Individual listed as RP is not certified by Boise City. Prior to the start of earthwork or construction a RP must be designated for this site.
Routing - PLANNING Land Div5/28/2003 5/28/2003 PASS
Approved.
Plan routing begun/TENANTS  5/28/2003 DONE
Plans ACCEPTED BY PLAN TECH  5/28/2003 PEND
Requires Planning and Zoning. Contacted Wes Edwards to talk with Tempra. kmm
Application received  5/27/2003  
Recd Pcfee & Taken To Pln CK  5/27/2003 DONE
Fee Review-notes5/27/20035/27/2003