Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/14/2004 | 4/26/2005 | | DONE |
|
|
|
|
First Notice | | 5/14/2004 | 4/26/2005 | | DONE |
|
|
|
|
First Notice | | 5/14/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/14/2004 | 5/14/2004 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 5/14/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10139 issued 5-14-04 to Liberty Motors.
|
FIRE-Final Inspection | 5/11/2004 | 5/12/2004 | 5/12/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 5/12/2004 9:45:07 AM
|
BLD-Final | 5/11/2004 | 5/12/2004 | 5/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
dean or david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK FOR PERM OCC WHEN OTHERS SIGN PERM 5/12/2004 1:13:13 PM
|
BLD-Final | 5/3/2004 | 5/4/2004 | 5/4/2004 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/3/2004 at 3:06:44 PM. Contact: ###-####. posted a c/n.. 5/4/2004 1:41:31 PM
|
FIRE-Final Inspection | 5/3/2004 | 5/3/2004 | 5/3/2004 | P | FAIL |
Troy Cobbley
|
|
|
Change sticker at the front exit to new code version. Remove manual flush bolts at the main entry. Mount fire extinguishers. Provide approved door hardware on all doors. 5/4/2004 10:15:59 AM
|
BLD-Framing/Rough-in | 3/17/2004 | 3/17/2004 | 3/17/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/17/2004 at 9:13:49 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | PART |
Tom Arcoraci
|
|
|
dean or call ###-#### dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs ok from plan rev for door change 2/20/2004 10:34:05 AM
|
BLD-Aging Inspection | 2/19/2004 | 2/19/2004 | 2/19/2004 | | NR |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 2/19/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 12/16/2003 | 12/16/2003 | 12/16/2003 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 9/16/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/5/2003 | | DONE |
|
|
|
|
CHANGE STATUS TO (R) | | | 9/5/2003 | | DONE |
|
|
|
permit ready to issue
|
Telephone call | | | 9/5/2003 | | |
|
|
|
left mess that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/25/2003 | | 9/2/2003 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 6/5/2003 | | 9/2/2003 | | PASS |
|
|
|
9/2/2003 11:54:49 RMH - activity updated through activity BLDA022 from case BLD03-01269.
|
Case Summary (BLD) | | | 8/29/2003 | | DONE |
|
|
|
|
Routing - PLANNING | 8/15/2003 | | 8/25/2003 | | PASS |
|
|
|
Approved per CZC03-129.
|
Routing - PLAN CHECK | 7/28/2003 | | 8/15/2003 | | PEND |
|
|
|
Routed back to planning, 8/15/03
|
Plan resubmittals received | | | 8/13/2003 | | DONE |
|
|
|
Received two copies of revised sheets A0-0, A1.0, A2.0, A3.0, A4.0, and one copy of response letter. Routed to Ron H. kmm
|
Routing - PLANNING | 7/22/2003 | | 7/28/2003 | | FAIL |
|
|
|
Plans do not comply with Design Review, DRH03-125, conditions of approval.
|
Routing - PLAN CHECK | 7/3/2003 | | 7/22/2003 | | PEND |
|
|
|
Permit pending Design review sign off, Routed to Marty on 7/22/03
|
Plan resubmittals received | | | 7/18/2003 | | DONE |
|
|
|
Received three sets of revised sheets A0-0, A1.0, A3.0. One copy of struct. calcs., response letter and two copies of envelope compliance 8 1/2 X 11. routed to Ron Hill. kmm
|
Routing - Erosion and Sediment | 7/3/2003 | | 7/3/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PLAN CHECK | 7/1/2003 | | 7/3/2003 | | |
|
|
|
|
Plan resubmittals received | | | 7/2/2003 | | DONE |
|
|
|
Received ESC application. Routed to Ron Hill.
|
Routing - Erosion and Sediment | 6/27/2003 | | 6/30/2003 | | FAIL |
|
|
|
NO ESC Permit Application with submittal.
|
Telephone call | | | 6/30/2003 | | DONE |
|
|
|
called Eric Peterson to let him know we need a Erosion Application.
|
Routing - PLAN CHECK | 6/26/2003 | | 6/27/2003 | | |
|
|
|
|
Routing - FIRE | 6/23/2003 | | 6/26/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/13/2003 | | 6/23/2003 | | FAIL |
|
|
|
Faxed and mailed requirements to the architect, routed plans to the fire department for review on 6/23/03
|
Plan resubmittals received | | | 6/13/2003 | | DONE |
|
|
|
received two copies of Erosion Control plans and taken to Ron H.
|
Routing - PLANNING | 6/10/2003 | | 6/12/2003 | | FAIL |
|
|
|
Staff level Design Review required prior to issuance of a building permit.
|
Routing - Erosion and Sediment | 6/10/2003 | | 6/10/2003 | | FAIL |
|
|
|
ESC required.
|
Routing - PUBLIC WORKS | 6/5/2003 | | 6/10/2003 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/5/2003 | | DONE |
|
|
|
Assigned the plan and began routing even though it is incomplete and needs planning approvals (possibly DR).
|
Routing Off Site -Energy | 6/5/2003 | | 6/5/2003 | | DONE |
|
|
|
contacted Ron for outside energy
|
Plans ACCEPTED BY PLAN TECH | | | 6/4/2003 | | FAIL |
Rita DeYoung
|
|
|
Possibly needs zoning and public works information, needs ESC permit and plan per Jim Rogers, I left a message for Bruce Poe letting him know he needs a plan and application for eroison.
|
Application received | | | 6/2/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2003 | | |
|
|
|
|
Fee Review-notes | 6/2/2003 | 6/2/2003 | | | |
|
|
|
|