Permit Information
Permit NumberBLD03-01289
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 8455 W WESTPARK ST
Project NameSCP GLOBAL TECHNOLOGIES
Customer Number 
ePlanReviewNo
Description
(SCP GLOBAL TECHNOLOGIES-RACKING) To install high pile storage racking in the warehouse area per approved plans on file. Storage area is approximately 7,108 sq.ft. To be installed to resist seismic lateral forces per attached engineering details. NOTE: this building is fully sprinklered for allowable area increase. A "Letter of Compliance" is required for this project. PC03-319/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/16/2009  
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice Sent 7/6/20044/26/2005 DONE
DOC - Permit Finaled7/6/20047/6/20047/6/2004PPASS
DetailsJim Sly
Finaled by inspector at 7/6/2004 11:39:35 AM
BLD-Other6/30/20047/6/20047/6/2004APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/30/2004 at 2:21:04 PM. Contact: ###-####. C/C issued. 7/6/2004 11:39:28 AM
FIRE-Final Inspection5/19/20045/19/20045/19/2004PPASS
DetailsTroy Cobbley
fire life safety finaled 5/19/2004 3:09:27 PM
FIRE-Final Inspection4/22/20044/22/20044/22/2004PFAIL
DetailsTroy Cobbley
Provide maximum storage height designation of 18' for the racks. Provide transverse flu space of 6" per review notes
FIRE-Final Inspection9/30/20039/30/20039/30/2003PPASS
DetailsRick Jackson
BLD-Other9/4/20039/5/20039/5/2003ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/4/2003 at 8:00:13 AM. Contact: ###-####. Need Electr final if applicable....Need fire approval prior to calling for struct insp.....Notified Contractor/owner. 9/5/2003 12:06:54 PM
Issue PAID IN FULL permit  8/1/2003 DONE
Plan assigned to (DRS)6/5/2003 7/22/2003 PASS
DetailsDan Stuart
7/22/2003 15:05:20 DRS - activity updated through activity BLDA022 from case BLD03-01289.
Routing - PLAN CHECK7/21/2003 7/22/2003 PASS
Approved as noted on plans, permits & attached engineering & ER #4627 for Hilti Kwik Bolt II anchors and attached plan review reports of fire and plan review divisions..
PLANS/APPL TAKEN TO FRONT DESK  7/22/2003 PASS
To permit desk for issue.
Inspection Record Card- Bld  7/22/2003 DONE
Telephone call  7/22/2003 DONE
permit ready and fees due
Routing - FIRE7/17/2003 7/21/2003 PASS
DetailsBill Alexander
Routing - PLAN CHECK6/27/2003 7/17/2003 PEND
Received response from structural engineer concerning racking. Engineer stated that engineering package #02-0476A using 1/4" long-thread style Hilti Kwik Bolt II x 1-1/8" embedment were for max. 12 foot high rack systems and package #02-0539A was for racks greater than 12' to 16' maximum using 3/8" Hilti Kwik Bolt II x 2-1/2" embedment with storage height maximum of 18' above finish floor based on fire supression design data. Inserted information recieved into plans and routed back to fire code analyst for re-review.
Plan resubmittals received  7/16/2003 DONE
received three sets of structural correction for SCP Global with 5 sheets of light duty storage fixture details and taken to Dan
Routing - PLAN CHECK7/16/2003 7/16/2003 PEND
Received engineers explanation, clarification & engineering calcs. Made notes on plan sheets per the engineers clarification that design package 02-0476A was applicable for rack design upto 12' maximum. as the architectural plans show only 16 foot hight for racks engineering package 03-0539A would be the applicable design package to use for all racks.Routing to fire code analys for re-review.
Telephone call  6/30/2003 DONE
RETURNED PHONE CALL TO BEN HILL. NO NEED TO SUBMIT NEW SHEETS T1.0 & A5 TO CHANGE DIMENSIONS FROM 20 FEET TO 18 FEET MAXIMUN STORAGE HEIGHT, 2 FEET ABOVE THE RACK HEIGHT INSTEAD OF 4 FEET. THIS HEIGHT MATCHES THE SPRINKLER SYSTEM DESIGN DATA INFORMATION PROVIDED BY SHILO AUTOMATIC SPRINKLER SYSTEMS TO PROVIDE HIGH PILE CLASS IV COMMODITIES PROTECTION. i WILL NOTE CHANGE ON PLAN SHEETS & CLOUD FOR CHANGES. HEIGHT WILL BE VERIFIED IN FIELS AND IS RECORDED IN DESIGN DATA SUBMITTED TO FIRE AND AS MODIFIED ON PLANS BY ME. WAITING FOR DESIGN ENGINEERS ANALYSIS WHERE HE HAD NOTED 12' RACK HEIGHT FOR 6 FOOT SECTIONS AND A HILTI CONNECTION NOT APPROVED FOR RESISTANCE OF SEISMIC LOADS PER ER REPORT.
Routing - FIRE6/26/2003 6/27/2003 FAIL
DetailsBill Alexander
Plan "Key Notes" and displayed rack height information do not correlate on the plans or in the calcs.
Plan Review Completed(1st rev)  6/27/2003 DONE
Plan resubmittals requested  6/26/2003 FAIL
Based on engineers reference to ER-4427 for Hilti Kwik Bolt II for attachment of the racking to the floor and discrepencies between the report and a detail for 1/4" anchor bolts at 1-1/8" embedment not being acceptable to resisit seismic lateral loads I ask the engineer to review his design details. I faxed a copy of the request to Sal E. Fateen, Seizmic Material Handling Engineering and Ben Hill, Arrow Rock Architects. Also ask for clarification of design hieght of 12 feet for the 6 foot rack sections versus the architects call out for 16 foot height racks with storage to 20 feet to make sure which is right and that proper design consideration is given if greater height is used.
Telephone call  6/26/2003 DONE
Called Ben Hill architect, to verify the height of the racks to be installed. the 16' dimension on the front of p[lans was written over with 20'. Ben said the racks were to be 16 feet as he understood with storage height to 20 feet. I told him that in checking with fire code analyst, plans for the fire supression system modifications and a list of hte Class IV commodities have been submitted to Bill Alexander, sprinkler system plans reviewer.
Routing - PLAN CHECK6/5/2003 6/26/2003 FAIL
Resubmittals required on engineering and actual rack height & storage limits of design. Routing to fire code analys for review of high pile storage & sprinkler system coverage for declared Class IV commodities with storage to 20'.
Plans ACCEPTED BY PLAN TECH  6/5/2003 DONE
Application received  6/3/2003  
Recd Pcfee & Taken To Pln CK  6/3/2003 DONE
Fee Review-notes6/3/20036/3/2003