BLD-Final | 4/28/2005 | 4/29/2005 | 4/29/2005 | A | PASS |
Jim Sly
|
|
|
per your request Internet Inspection Request from: Barbara Moore OKm for Perm Occ. 4/29/2005 10:33:15 AM
|
Letter of compliance | | | 4/29/2005 | | DONE |
|
|
|
Letter of Compliance issued 4-29-05.
|
CHANGE STATUS TO (ISS) | | | 4/28/2005 | | DONE |
|
|
|
per Jim Sly///4/28/05 BAS
|
Code Occupancy Approval | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF 4/26/2005 4:00:41 PM
|
FIRE-Final Inspection | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | FAIL |
Forrest France
|
|
|
Remove thumbturn on S.W. exit door. Repair emergency light.
|
PubWorks Occupancy Approval | 4/15/2005 | 4/15/2005 | 4/15/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 4/15/05. R.Rokovitz
|
Print Occupancy Form | | | 4/6/2005 | | DONE |
|
|
|
|
BLD-Concrete | 12/15/2004 | 12/15/2004 | 12/15/2004 | P | PART |
Lane Manuel
|
|
|
jim --- rebar insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
3 tilt up panels, to have special insp. by Terracon on 12/16/04. 12/15/2004 2:10:20 PM
|
BLD-Footing | 11/23/2004 | 11/24/2004 | 11/24/2004 | A | PART |
Lane Manuel
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
perimeter footings ok. Terracon to provide reports. 11/24/2004 12:49:35 PM
|
BLD-Concrete | 11/17/2004 | 11/18/2004 | 11/18/2004 | P | PART |
Lane Manuel
|
|
|
jim Note: concrete bar tilt wall panel; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
terracon special insp. to provide reports for all found. and tilt up panels, as to compliance with plans,etc. 11/18/2004 12:46:29 PM
|
BLD-Concrete | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PART |
Jim Sly
|
|
|
re-bar inspection please////jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Concrete | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | PART |
Tom Arcoraci
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice spec insp 11/12/2004 9:01:49 AM
|
BLD-Footing | 10/19/2004 | 10/20/2004 | 10/20/2004 | P | PART |
Dave Hannah
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles center colmn pads also terrocon will be on site to test concrece and due spec inspection 10/20/2004 4:43:33 PM
|
(F) Reprint permit | | | 6/2/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2004 | | DONE |
|
|
|
|
Telephone call | | | 5/28/2004 | | DONE |
|
|
|
per jennifer ok to pickup permit on june 1st
|
Extend Permit 180 days | | 2/9/2004 | 2/9/2004 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 2/9/2004 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 2/9/2004 | | |
|
|
|
per letter from jennifer gilliland extend permit until may 31st, 2004
|
Permit EXTENDED | | | 1/29/2004 | | DONE |
|
|
|
per letter on file from jenifer gilliland extent permit until may31st 2004/mls
|
Telephone call | | | 1/27/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Reviewer's activity | | | 1/9/2004 | | |
|
|
|
This permit was extended by Jenifer Gililand in a letter to Gayle Jensen. The permit must be issued by 5/31/2004 or the application will expire. JCM
|
Telephone call | | | 1/8/2004 | | DONE |
|
|
|
Spoke with Gayle...he says they still want to do this but due to economics they haven't been able to, he is going to write a letter to Jennifer to ask for an extension as the permit will be expiring soon//1/8/04 9:18am BAM
|
Telephone call | | | 10/21/2003 | | DONE |
|
|
|
Spoke with Gayle to remind that permit is ready & fees
|
Telephone call | | | 9/24/2003 | | DONE |
|
|
|
Left message that permit is ready & fees
|
Routing - FIRE | 8/4/2003 | | 8/7/2003 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 8/7/2003 | | 8/7/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2003 | | DONE |
|
|
|
called and left message that the permit is ready but we need to see the ACHD certificate.
|
Plan assigned to (JCM) | 6/6/2003 | | 8/7/2003 | | PASS |
John Menard
|
|
|
8/7/2003 10:46:15 JCM - activity updated through activity BLDA022 from case BLD03-01306.
|
Plan Reviewer's activity | | | 8/4/2003 | | PASS |
|
|
|
Reviewed and approved revisions as submitted. JCM
|
Routing - PLAN CHECK | 7/9/2003 | | 8/4/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/31/2003 | | DONE |
|
|
|
Received two copies of revised sheets SP-1, A-3, A-4, EN, SPEC-1, water supply letter and copy of redlines from Doug Miller. Routed to John M. kmm
|
Routing - PLANNING | 7/8/2003 | | 7/8/2003 | | PASS |
|
|
|
Approved per DRH01-198.
|
Plan Review Completed(1st rev) | | | 7/7/2003 | | DONE |
|
|
|
|
Routing - FIRE | 7/1/2003 | | 7/7/2003 | | FAIL |
Bill Alexander
|
|
|
Problems with fire department access. No water supply info for fire sprinkler design. System design specs do not meet city ordinance for fire protection of spec warehouses.
|
Routing Off Site - STRUCTURAL | 6/30/2003 | | 7/2/2003 | | PASS |
|
|
|
Faxed responses to the consulting structural engineer. JCM Received an e-mail from the consulting structural engineer approving the resubmittals. JCM
|
Plan resubmittals requested | | | 7/1/2003 | | |
|
|
|
Mailed the applicant a copy of the plan review comment list requesting revisions. JCM
|
Plan resubmittals received | | | 7/1/2003 | | DONE |
|
|
|
received letter of transmittal with three revised landscape plans, and one copie of subdivision plat for Marty and taken to John M.
|
Routing - PLAN CHECK | 6/23/2003 | | 7/1/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/27/2003 | | DONE |
|
|
|
Response to structural review received from engineer which includes cover letter and calculations. Information forwarded to John Menard.
|
Telephone call | | | 6/26/2003 | | DONE |
|
|
|
Phone call with Gayle Jensen. Discussed the Design Review conditions that had not been met, specifically 1a and 1e. Condition 1a: Landscape plan shall include both trees an shrubs as per condition of approval. Trees need to comply with D.R. guidelines; e.g., Class II trees at 25 to 35 ft. apart. Shrubs at 4-6 ft. apart, depending on species.
|
Plan resubmittals requested | | | 6/23/2003 | | |
|
|
|
Faxed the applicant a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 6/20/2003 | | 6/23/2003 | | PASS |
|
|
|
need building cleanout two feet outside building
|
Routing - PLANNING | 6/19/2003 | | 6/20/2003 | | FAIL |
|
|
|
Plans do not comply with DRH01-198 conditions of approval.
|
Routing Off Site - STRUCTURAL | 6/6/2003 | | 6/20/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm Received comment list from consulting structural engineer requiring revisions. JCM
|
Routing - Erosion and Sediment | 6/18/2003 | | 6/19/2003 | | PASS |
|
|
|
ESC approved w/conditions attached to plans.
|
Routing - PUBLIC WORKS | 6/6/2003 | | 6/18/2003 | | PASS |
Jon Williams
|
|
|
ok per john williams
|
Routing - PLANNING Land Div | 6/6/2003 | | 6/6/2003 | | PASS |
|
|
|
Lot 4, Block 1 of Trustmark Subdivision
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/6/2003 | | DONE |
|
|
|
|
Application received | | | 6/4/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/4/2003 | | |
|
|
|
|
Fee Review-notes | 6/4/2003 | 6/4/2003 | | | |
|
|
|
|