Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD03-01313
StatusFinaled
Name LEASE OFFICE SPACES (AIR TERMINAL)
Site Address 3201 W AIRPORT WAY (2ND FLOOR)
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(LEASE OFFICE SPACES - NEW AIR TERMINAL - 2ND FLOOR) This building is fully fire sprinklered. To create a 1,730 square foot office suite with several lease office spaces on the 2nd floor of the new Boise City Air Terminal. "Globe Security" and "Pradies" will be two of the occupants. Work is to include interior nonbearing walls, interior doors, interior finishes, and suspended ceilings all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/2/20044/2/20044/2/2004 DONE
DetailsJim Storey
First Notice 4/2/20044/2/2004 DONE
Permanent occupancy  4/2/2004 DONE
Perm. Occ. Cert. # 10072 issued to the Boise Airport Terminal for the lease office spaces.
BLD-Aging Inspection1/23/20041/23/20041/23/2004 DONE
DetailsJim Storey
Permanent Occupancy 11/17/200311/17/2003 DONE
Details
BLD-Final11/7/200311/7/200311/7/2003PPASS
DetailsJim Storey
BLD-Final11/5/200311/6/200311/6/2003ANR
DetailsJim Storey
Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Final11/6/200311/6/200311/6/2003PFAIL
DetailsJim Storey
ch.7 maintane coridor. 11/7/2003 11:43:21 AM
FIRE-Final Inspection11/5/200311/5/200311/5/2003PPASS
DetailsRick Jackson
BLD-Final11/3/200311/3/200311/3/2003PNR
DetailsJim Storey
###-#### fire/mech 11/3/2003 12:36:38 PM
Override - Parcel Holds  11/3/2003  
BLD-Framing/Rough-in9/18/20039/18/20039/18/2003PPART
DetailsJim Storey
###-#### ted ###-#### ted fire proofing patches ok ceiling ok/ fire damper aplacation needs verified with mech insp. w/acess door labled./fire alarm plans not isued at this time from plan review. 9/18/2003 2:54:30 PM
BLD-Framing/Rough-in8/25/20038/26/20038/26/2003APASS
DetailsJim Storey
ted; Phone #: ###-#### Internet Inspection Request from: Marc Lileks wall refrigarator water supply wraped with gyp and fire stopped. 8/26/2003 8:22:57 AM
BLD-Framing/Rough-in8/21/20038/22/20038/22/2003PPART
DetailsJim Storey
ted//before 3:30 please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire wall plm box 8/22/2003 1:58:15 PM
Issue PAID IN FULL permit  7/23/2003 DONE
Telephone call  7/16/2003 DONE
left mess that permit is ready
Inspection Record Card- Bld  7/16/2003  
Print Occupancy Form  7/16/2003 DONE
Plan assigned to (CJW)6/9/2003 7/15/2003 PASS
DetailsCarl Westfall
7/15/2003 08:12:34 CJW - activity updated through activity BLDA022 from case BLD03-01313.
Routing - PLAN CHECK7/15/2003 7/15/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/15/2003 PASS
Routing - FIRE7/9/2003 7/14/2003 PASS
Routing - PLAN CHECK6/12/2003 7/9/2003 PASS
IBC plan review started July 7, 2003 and finished July 9, 2003. The drawngs were approved with conditions. See the plan review report.
Routing - PUBLIC WORKS6/9/2003 6/12/2003 PASS
Plans ACCEPTED BY PLAN TECH  6/6/2003 DONE
Application received  6/5/2003  
Fee Review-notes6/5/20036/5/2003