Permit Information
Permit NumberBLD03-01319
StatusFinaled
Name JOE MARSHALL
Site Address 420 W MAIN ST Unit: 401
Project NameVeltex Building-4th&5th flrs
Customer Number 
ePlanReviewNo
Description
(MARSHALL RESIDENCE)(VELTEX BLDG-4TH &5TH FLOORS) To finish approximately 2,059 sq.ft. of floor area, for a residential condominium units. Work to include interior walls, ceilings, bathrooms, HVAC system and electric stair lift. All construction per the approved plans and attached comment list. NOTE: This building is fully fire sprinklered for story increase per the 1997 UBC. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/22/2009  
BLD-Final5/28/20045/28/20045/28/2004APASS
DetailsDave Hannah
ok for perm occ 5/28/2004 10:34:06 AM
DOC - Permit Finaled5/28/20045/28/20045/28/2004APASS
DetailsDave Hannah
Finaled by inspector at 5/28/2004 10:34:52 AM
Letter of compliance  5/28/2004 DONE
Letter of Compliance issued 5-28-04.
Temporary occupancy  3/19/2004 DONE
Temp. Occ. Cert. # 5090 issued 3-19-04 to the Joe Marshall condominium.
BLD-Final3/18/20043/18/20043/18/2004PPART
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ needs elec to go perm 3/18/2004 2:04:11 PM
FIRE-Final Inspection3/16/20043/16/20043/16/2004PPASS
DetailsRick Jackson
fire/life safety okay; doors in corridor to be completed for structural inspector 3/16/2004 4:09:46 PM
FIRE-Final Inspection3/15/20043/15/20043/15/2004PFAIL
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need sprinkler head installed in furnace room 3/15/2004 2:26:02 PM
BLD-Conference3/15/20043/15/20043/15/2004PPASS
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Final Inspection3/15/20043/15/20043/15/2004PFAIL
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need sprinkler head installed in furnace room 3/15/2004 2:25:37 PM
Override - Condition Holds1/1/19001/1/19003/15/2004  
Override - Condition Holds1/1/19001/1/19003/15/2004  
inspection
Override - Condition Holds1/1/19001/1/19003/15/2004  
fir inspection
Override - Condition Holds1/1/19001/1/19003/15/2004  
inspection
Override - Condition Holds1/1/19001/1/19003/15/2004  
bld inspection
BLD-Conference3/12/20043/12/20043/12/2004PCANC
DetailsTroy James
###-#### jim
Override - Condition Holds  3/12/2004  
BLD-Framing/Rough-in1/21/20041/21/20041/21/2004PPASS
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
FIRE-Sprinkler Rough-in1/21/20041/21/20041/21/2004PPASS
DetailsRick Jackson
okay to cover
Override - Condition Holds1/1/19001/1/19001/21/2004  
bld inspection
BLD-Framing/Rough-in1/20/20041/20/20041/20/2004PFAIL
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs to protect stuct steel colmuns ok to install ceiling 1/20/2004 2:11:30 PM
Override - Condition Holds1/1/19001/1/19001/20/2004  
bld inspection
Override - Condition Holds1/1/19001/1/19001/20/2004  
bld inspection
BLD-Framing/Rough-in12/15/200312/15/200312/15/2003PPART
DetailsDave Hannah
jim- ###-#### beam protection shaft walls in stair towers 12/15/2003 5:06:04 PM
Override - Condition Holds  12/15/2003  
Override - Condition Holds  12/15/2003  
BLD-Framing/Rough-in12/12/200312/12/200312/12/2003PPART
DetailsDave Hannah
###-#### Jim
Override - Condition Holds  12/12/2003  
Override - Condition Holds  12/12/2003  
BLD-Aging Inspection11/17/200311/17/200311/17/2003 PART
DetailsDave Hannah
work in progress 11/17/2003 9:29:35 AM
Plan Reviewer's activity  9/24/2003 DONE
Added a condition tag to the building permit so that a permanent c.o. cannot be issued until condo plat is recorded.
Issue PAID IN FULL permit  8/15/2003 DONE
Inspection Record Card- Bld  8/13/2003 DONE
Print Occupancy Form  8/13/2003 DONE
Telephone call  8/13/2003 DONE
permit ready and fees due
Plan assigned to (M_P)6/6/2003 8/12/2003 PASS
DetailsMike Phillips
8/12/2003 15:18:38 M_P - activity updated through activity BLDA022 from case BLD03-01319.
Routing Off Site -Energy6/16/2003 8/12/2003 DONE
Contacted Ron O for energy review
Routing - FIRE8/7/2003 8/12/2003 PASS
resubmittal acceptable.
Routing - PLAN CHECK8/12/2003 8/12/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/12/2003 DONE
Print Pending Permit.LaserJet4  8/12/2003 DONE
Routing - PLAN CHECK7/10/2003 8/7/2003 PEND
Waiting for others to approve prior to issuing permit.
Plan resubmittals received  7/14/2003 DONE
Transmittal letter, two page response letter from the Architect, two pages of detail sheets, Two sets of A2.13,A5.11,A5.12, A6.11, and taken to Mike P.
Routing - FIRE7/2/2003 7/10/2003 FAIL
Just need to review resubmittal items requested by IBC reviewer.
Routing - PLAN CHECK6/11/2003 7/2/2003 FAIL
Plan review completed sent correction report to architect requesting additional information be resubmitted for further review prior to issuing permit.
Routing - PLUMBING6/11/2003 6/11/2003 PASS
DetailsLee Rice
approved per plan and 2000 UPC
Routing - PLANNING6/10/2003 6/10/2003 PASS
Approve
Routing - PUBLIC WORKS6/6/2003 6/10/2003 PASS
Plan routing begun/TENANTS  6/6/2003 DONE
Application received  6/6/2003  
Recd Pcfee & Taken To Pln CK  6/6/2003 DONE
Plans ACCEPTED BY PLAN TECH  6/6/2003 DONE
Fee Review-notes6/6/20036/6/2003