Case Summary (BLD) | | | 9/26/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/26/2016 | | DONE |
|
|
|
|
BLD-Final | 11/7/2003 | 11/10/2003 | 11/10/2003 | P | PASS |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 11/10/2003 | 11/10/2003 | 11/10/2003 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/10/2003 4:22:19 PM
|
BLD-Grading Inspection | 11/7/2003 | 11/7/2003 | 11/7/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved. Recommended to the contractor that better daqinage away from the house be provided in the rear yard.
|
BLD-Framing/Rough-in | 9/19/2003 | 9/22/2003 | 9/22/2003 | A | PASS |
Tony Young
|
|
|
need to better support stair landing,,,, ok to cover after 9/22/2003 4:18:36 PM
|
BLD-Energy code compliance | 9/19/2003 | 9/22/2003 | 9/22/2003 | A | PART |
Tony Young
|
|
|
need to insulate upper south rim above kitchen and garage,,,, ok to cover after 9/22/2003 4:19:33 PM
|
BLD-Framing/Rough-in | 9/18/2003 | 9/19/2003 | 9/19/2003 | P | CANC |
Russ Owen
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. out of time cloned . 9/19/2003 12:41:44 AM
|
BLD-Energy code compliance | 9/18/2003 | 9/19/2003 | 9/19/2003 | P | CANC |
Russ Owen
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreout of time cloned 9/19/2003 12:41:51 AM
|
BLD-Framing/Rough-in | 9/16/2003 | 9/17/2003 | 9/17/2003 | P | FAIL |
Tony Young
|
|
|
BRYAN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
c/n posted, ok to insulate 9/17/2003 3:41:01 PM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | P | NR |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no insp. job not ready for insp. 9/16/2003 1:37:29 PM
|
(F) Reprint permit | | | 9/16/2003 | | DONE |
|
|
|
|
BLD-Foundation | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | PART |
Steven Webb
|
|
|
brian-or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Retaining wall--wip--80% ready--rebar per engineering. 8/19/2003 10:40:48 AM
|
BLD-Footing | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 11:22:36 AM. Contact: ###-####.
retaining wall ftgs 8/8/2003 11:40:15 AM
|
BLD-Foundation | 7/23/2003 | 7/24/2003 | 7/24/2003 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 12:06:29 PM. Contact: ###-####.
letter from Briggs eng. accepts as ok as built 7/24/2003 10:18:15 AM
|
BLD-Footing | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | NR |
Tony Young
|
|
|
ERIC; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows
|
BLD-Footing | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | FAIL |
Tony Young
|
|
|
eric ###-####
c/n posted on thickness of ftg,,, call for reinspection,,, need letter from engineer approving as built or a fix or tear out and re-pour 7/22/2003 4:11:10 PM
|
BLD-Footing | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | PART |
Dave Hannah
|
|
|
###-#### setbacks ok forms in crew finishing rebar 7/21/2003 9:46:28 AM
|
BLD-Grading Inspection | 7/18/2003 | 7/18/2003 | 7/18/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/18/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2003 | | DONE |
|
|
|
left mess with doug that permit is ready
|
Plan assigned to (DJO) | 7/9/2003 | 7/9/2003 | 7/17/2003 | | PASS |
Dan Overy
|
|
|
7/17/2003 09:11:34 DJO - activity updated through activity BLDA022 from case BLD03-01326.
|
Plan Reviewer's activity | | | 7/17/2003 | | DONE |
|
|
|
received energy calcs and requested engineering. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2003 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/9/2003 | | PEND |
|
|
|
rescheck being faxed. lateral and overheight and isolated footing engineering will be provided before issuance of permit.
|
Case Summary (BLD) | | | 7/9/2003 | | PEND |
|
|
|
|
Plan Review Report | | | 7/9/2003 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/9/2003 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/23/2003 | | 6/24/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - FIRE | 6/24/2003 | | 6/24/2003 | | DONE |
|
|
|
No fire sprinklers required (Arrowhead Canyon subdiv).
|
Routing - PLANNING | 6/20/2003 | | 6/23/2003 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/20/2003 | | 6/20/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1, CFH03-00013
|
Routing - PUBLIC WORKS | 6/20/2003 | | 6/20/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 6/6/2003 | | 6/9/2003 | | FAIL |
Rita DeYoung
|
|
|
Needs Category 1 application
|
Application received | | | 6/6/2003 | | |
|
|
|
|
Pending Assignment by DJO | 6/6/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 6/27/2003 | | | | |
|
|
|
|