Case Summary (BLD) | | | 7/28/2008 | | |
|
|
|
|
BLD-Final | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ 4/7/2004 8:30:53 AM
|
First Notice | | 4/7/2004 | 4/7/2004 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/7/2004 | 4/7/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/7/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10083 issued 4-7-04 to the Bruce Dental Clinic.
|
BLD-Final | 3/23/2004 | 3/24/2004 | 3/24/2004 | A | NR |
Jim Sly
|
|
|
tom heinz-- -###-####
|
BLD-Final | 3/24/2004 | 3/24/2004 | 3/24/2004 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 9:33:47 AM. Contact: ###-####. Temp Occ. OK Pending Plumb and Med gas approval. 3/24/2004 2:35:29 PM
|
FIRE-Final Inspection | 3/23/2004 | 3/23/2004 | 3/23/2004 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled
|
PubWorks Occupancy Approval | 3/22/2004 | 3/22/2004 | 3/22/2004 | | DONE |
|
|
|
Drainage found complete, letter from owner verified drainage, approved by Brian Murphy 3/22/04.
|
BLD-Conference | 3/19/2004 | 3/19/2004 | 3/19/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/19/2004 at 9:44:09 AM. Contact: ###-####.
|
FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire sprinkler protection in the gas closet per the review notes. Provide verification that the exhaust tubes on the duct smoke detectors can have inlet holes as the installation instructions do not shown this 3/18/2004 10:34:13 AM
|
BLD-Framing/Rough-in | 3/9/2004 | 3/9/2004 | 3/9/2004 | P | PASS |
Jim Sly
|
|
|
ceiling grid inspection please///mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 12/23/2003 | 12/24/2003 | 12/24/2003 | A | PASS |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/18/2003 | 12/19/2003 | 12/19/2003 | A | PART |
Tom Arcoraci
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ok to insulate need 1 hr to deck on south and east wall see plan 12/19/2003 9:31:29 AM
|
BLD-Framing/Rough-in | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PASS |
Jim Sly
|
|
|
shear wall inspection please//mike heinz; Phone #: ###-#### Internet Inspection Request from: Barbara Moore OK to cover E and S walls. 11/12/2003 4:08:19 PM
|
BLD-Foundation | 10/10/2003 | 10/10/2003 | 10/10/2003 | P | PART |
Russ Owen
|
|
|
STEVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ok pending letter from engineer will get asap. 10/9/2003 10:56:37 PM
|
BLD-Footing | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PART |
Jim Sly
|
|
|
LAZARO; Phone #: ###-#### Internet Inspection Request from: Darla Downs Footing and Bar OK.....Need letter from Eng 4000/3500 PSI... to 2500 PSI. 10/9/2003 12:06:58 PM
|
(F) Reprint permit | | | 9/30/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/11/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/11/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/11/2003 | | DONE |
|
|
|
Left message permit ready and fees due
|
Plan assigned to (MLO) | 6/11/2003 | | 9/11/2003 | | PASS |
Mike Otto
|
|
|
9/11/2003 10:21:57 MLO - activity updated through activity BLDA022 from case BLD03-01356.
|
Routing - PLUMBING | 9/8/2003 | | 9/10/2003 | | PASS |
|
|
|
SEPARATE MED AIR INTAKE FROM VACUUM EXHAUST AT ROOF LINE TO EXCLUDE CROSS CONTAMINATION, PER RESUBMITTED PLANS AND LETTER DATED 9/8/03
|
Plan resubmittals received | | | 9/8/2003 | | DONE |
|
|
|
Received three copies of revised sheets P1.1, P3.0, P4.0, one copy of cover letter. Routed to Mike O. kmm
|
Routing - PUBLIC WORKS | 8/28/2003 | | 9/3/2003 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/27/2003 | | 8/27/2003 | | FAIL |
|
|
|
prime f.d. s and f.s. s, rp required on service installed over floor sink, the med air compressor area shall be located separately from med gas cylinder system sources and be provided with drainage facilities, med vacuum plant shall have drainage facilities, show locations of med air and vacuum intake and exhaust.
|
Plan resubmittals requested | | | 8/15/2003 | | DONE |
|
|
|
energy corrections
|
Routing Off Site -Energy | 8/15/2003 | | 8/15/2003 | | PASS |
|
|
|
Corrections have been satisfied approval has been emailed. MLO
|
Routing Off Site -Energy | 8/8/2003 | | 8/15/2003 | | FAIL |
|
|
|
Contacte Ron O for energy review. kmm Corrections sent to architect MLO
|
Routing - PUBLIC WORKS | 8/8/2003 | | 8/14/2003 | | FAIL |
|
|
|
Requires Drainage plan Revision per Brian M. kmm
|
Routing - PLANNING | 8/7/2003 | | 8/8/2003 | | PASS |
|
|
|
Approved per DRH03-141.
|
Routing - PLAN CHECK | 8/5/2003 | | 8/7/2003 | | PASS |
|
|
|
|
Routing - FIRE | 7/30/2003 | | 8/4/2003 | | PASS |
|
|
|
jResubmittal acceptable
|
Plan resubmittals received | | | 8/4/2003 | | DONE |
|
|
|
Response letter, three copies of A-2.0, two copies of A-3.0,A-4.0,A-6.1, A-7.0, A-9.0 taken to Mike O.
|
Routing - PLAN CHECK | 7/28/2003 | | 7/30/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 7/30/2003 | | DONE |
|
|
|
IBC and energy
|
Plan resubmittals received | | | 7/28/2003 | | DONE |
|
|
|
received response letter, response letter to Sam Rogers, two sets of A-0.0,A-1.0,A-2.0,A-3.0,A-4.0,A-5.1,A-6.0,A-6.1,A-7.0,A-8.0,A-9.0,P4.0, P5.0, taken to Mike O.
|
Routing - FIRE | 7/15/2003 | | 7/21/2003 | | FAIL |
|
|
|
inadequate hydrant and flow information; review comments faxed to architect.
|
Routing Off Site -Energy | 6/11/2003 | | 7/15/2003 | | FAIL |
|
|
|
Contacted Ron Oltman for energy review. kmm Corrections sent to architect
|
Routing - PLAN CHECK | 7/2/2003 | | 7/15/2003 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 6/27/2003 | | 7/1/2003 | | FAIL |
|
|
|
water heater requires a pan with drain, provide a med gas plan that complies with the min. requirements of the 2000 upc or nfpa 99c.
|
Routing - PLANNING | 6/20/2003 | | 6/27/2003 | | FAIL |
|
|
|
Design Review application required for proposed office building.
|
Routing - Erosion and Sediment | 6/19/2003 | | 6/20/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 6/13/2003 | | 6/19/2003 | | FAIL |
|
|
|
Requires drainage plan revisions. Per Brian M. kmm
|
Routing - PLANNING Land Div | 6/11/2003 | | 6/12/2003 | | PASS |
|
|
|
Approved. Lot 3 of Block1 of Exeter Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 6/11/2003 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/11/2003 | | DONE |
|
|
|
|
Application received | | | 6/10/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/10/2003 | | DONE |
|
|
|
|
Fee Review-notes | 6/10/2003 | 6/10/2003 | | | |
|
|
|
|