First Notice | | 4/13/2004 | 4/13/2004 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/13/2004 | | DONE |
|
|
|
Perm. Occ. Cert. # 10098 issued 4-13-04 to the Idaho Athletic Club.
|
Permanent Occupancy | | 3/3/2004 | 3/3/2004 | | DONE |
|
|
|
|
BLD-Final | 3/1/2004 | 3/3/2004 | 3/3/2004 | P | PASS |
Russ Owen
|
|
|
dan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Ok for a perm oc. 3/2/2004 10:08:04 PM
|
BLD-Final | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | FAIL |
Russ Owen
|
|
|
dan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore. called and left a message with dan, bottom handrails ext do not comply in exit tower. 2/18/2004 12:37:36 AM
|
BLD-Final | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | PART |
Jim Storey
|
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n made ok arch letter in your box/ handraillins missing back west stair wall mounts. 2/2/2004 4:03:49 PM
|
FIRE-Final Inspection | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | FAIL |
Troy Cobbley
|
|
|
need alarm reports and could not test elevators 1/9/2004 10:31:52 AM
|
FIRE-Final Inspection | 1/9/2004 | 1/9/2004 | 1/9/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinkler are finaled 1/9/2004 2:18:15 PM
|
Temporary occupancy | | | 1/9/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5058 issued 1-9-04 to the Idaho Athletic Club.
|
FIRE-Final Inspection | 1/7/2004 | 1/8/2004 | 1/8/2004 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the elevator has been tested, knox box is provided, signage per review note #33, remove plumbing pipe from sprinkler line at riser, provide address and paint curbing for fire dept access. Need NFPA 72 forms and monitoring verification 1/8/2004 10:06:42 AM
|
BLD-Final | 1/7/2004 | 1/8/2004 | 1/8/2004 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/7/2004 at 4:03:10 PM. Contact: ###-####. issued a c/n ok for temp oc . 1/8/2004 5:05:48 PM
|
BLD-Framing/Rough-in | 12/29/2003 | 12/30/2003 | 12/30/2003 | A | FAIL |
Russ Owen
|
|
|
cell ###-#### 12/29/2003 3:43:53 PM > this needs penetrations of 1 hr walls completed. also went over this with contractor. 12/30/2003 12:08:57 PM
|
BLD-Other | 12/29/2003 | 12/29/2003 | 12/29/2003 | P | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/29/2003 at 9:13:49 AM. Contact: ###-####. Called contractor unable to locate at job , need to meet with cont for this insp. 12/29/2003 3:39:40 PM
|
Print Occupancy Form | | | 12/18/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/10/2003 at 10:24:25 AM. Contact: ###-####. Got letter from architect no 1 hr shaft needed at ducts through floor as long as they are sealed tight which they are. Need narchitect to clairify insulation at exterior walla some not contionous contractor notified and will address soon 2 days. 12/11/2003 11:45:38 AM
|
BLD-Framing/Rough-in | 12/3/2003 | 12/3/2003 | 12/3/2003 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/3/2003 at 8:08:10 AM. Contact: ###-####. need to complete the 1 hr walls and shafts at second floor also shafts will need to be addressedas to how they will be built as offsets exist contractor on site notified. 12/4/2003 1:54:00 PM
|
BLD-Framing/Rough-in | 11/18/2003 | 11/20/2003 | 11/20/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 4:24:29 PM. Contact: ###-####. 1st floor framing minus elevator shaft OK 11/20/2003 5:05:55 PM
|
BLD-Framing/Rough-in | 11/14/2003 | 11/19/2003 | 11/18/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/14/2003 at 4:56:44 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 18 2003 4:27PM.
|
BLD-Footing | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 8:47:51 AM. Contact: ###-####. subject to s-i. 9/15/2003 12:38:52 AM
|
BLD-Foundation | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 8:44:54 AM. Contact: ###-####. ok subject to s-i. 9/4/2003 7:58:39 PM 9/4/2003 7:58:43 PM
|
BLD-Foundation | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 8:44:15 AM. Contact: ###-####. ok subject to s-i. 9/4/2003 12:28:49 AM
|
BLD-Foundation | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 1:49:16 PM. Contact: ###-####.
|
BLD-Foundation | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/26/2003 at 2:32:41 PM. Contact: ###-####.subject to special inspection. 8/28/2003 9:37:42 AM
|
BLD-Footing | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 9:18:48 AM. Contact: ###-####. Subject to s-i. 8/28/2003 12:17:27 PM
|
(F) Reprint permit | | | 8/25/2003 | | |
|
|
|
|
BLD-Footing | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 8:34:33 AM. Contact: ###-####.
|
Inspection Record Card- Bld | | | 8/20/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/20/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/20/2003 | | DONE |
|
|
|
permit ready and fees due
|
Issue PAID IN FULL permit | | | 8/20/2003 | | |
|
|
|
|
Plan assigned to (JCM) | 6/16/2003 | | 8/19/2003 | | PASS |
John Menard
|
|
|
8/19/2003 15:43:40 JCM - activity updated through activity BLDA022 from case BLD03-01377.
|
Routing - PLAN CHECK | 8/13/2003 | | 8/19/2003 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/14/2003 | | 8/19/2003 | | PASS |
|
|
|
Contacted PDQ to take revised calcs of 8/14/03 to outside engineering. kmm Received an e-mail from the consulting structural engineer approving the revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2003 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/18/2003 | | DONE |
|
|
|
Received three copies of revised sheets S0.1, S3.0 and S3.1. Routed to John M. kmm
|
Routing Off Site -Energy | 8/11/2003 | | 8/15/2003 | | PASS |
|
|
|
Contacted Ron O for energy review on plans resubmitted 8/11/03. kmm Received e-mail from energy reviewer approving revisions. JCM
|
Plan resubmittals received | | | 8/14/2003 | | DONE |
|
|
|
Received letter of transmittal, three comments responses, three structural calc's, three misc. details and taken to John M.
|
Routing - PLANNING Land Div | 8/13/2003 | | 8/13/2003 | | PASS |
|
|
|
Approved by ROS 6190. Notice of Buildable Parcel recorded on 8/13/03.
|
Routing - FIRE | 8/7/2003 | | 8/12/2003 | | PASS |
|
|
|
resubmittal acceptable; separate swimming pool permit to be obtained.
|
Plan resubmittals received | | | 8/11/2003 | | DONE |
|
|
|
Recieved one copy of sheets T2.0, M3.1, M4.1, E2.1L, E2.2L, E4. Routed to John M. kmm
|
Routing - PLANNING Land Div | 8/7/2003 | | 8/7/2003 | | FAIL |
|
|
|
Need to complete vacation of easement. Need to approve and record Notice of Buildable Parcel. Need new recorded deed and new tax parcel number.
|
Plan resubmittals requested | | | 8/7/2003 | | |
|
|
|
E-mailed the architect a copy of the comment list from the consulting structural engineer, for the resubmittals, requesting revisions. JCM
|
Routing - PLANNING | 8/5/2003 | | 8/7/2003 | | PASS |
|
|
|
Susan Riggs/Marty Santoyo
|
Routing Off Site - STRUCTURAL | 8/5/2003 | | 8/7/2003 | | FAIL |
|
|
|
Contacted PDQ to take revised plans to outside engineering. kmm Received e-mailed comment list from the consulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals requested | | | 8/5/2003 | | |
|
|
|
E-mailed the architect to request additional information on required special inspections. JCM
|
Routing - PLAN CHECK | 7/17/2003 | | 8/5/2003 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 8/1/2003 | | DONE |
|
|
|
Received three copies of resubmittal sheets T0.0, T1.0, T2.0, C1.0, C2.0, C3.0, C4.0, C5.0, C6.0, L1.0,L2.0, A1.0, A1.1, A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A4.1, A4.2, A5.1, A5.2, A6.1, A7.1, A8.1, A8.2, A8.3, A8.4, A10.1, A10.2, A10.3, A11.1, A12.1, A12.2, S0.1, S1.0, S1.1, S2.0, S2.1, S3.0, S3.1, S4.1, S4.2, S5.1, M0.1, M1.1A, M1.1B, M1.2A, M1.2B, M1.3A, M1.3B, M2.1, M3.1, M4.1, P1.1A, P1.1B, P1.2A, P1.3A, P1.3B, P2.1A, P2.1B, P2.2A, P3.1, E0, E1.0, E2.1P, E2.1L, E2.1F, E2.2P, E2.2L, E2.2F, E3.0, E4.0, and (2) books of Calculations, (2) response letter packages, (2) letters from Idaho Athletic Club, (1) transmittal. Routed to John Menard.
|
Routing - FIRE | 7/11/2003 | | 7/16/2003 | | FAIL |
|
|
|
Need Haz Mat evaluation; 1-hour constructin for AS riser room. Review comments faxed to Roger Nielsen, architect.
|
Routing - PLAN CHECK | 6/27/2003 | | 7/11/2003 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/11/2003 | | |
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Plan resubmittals requested | | | 7/8/2003 | | |
|
|
|
Faxed the architect a copy of the plan review comment list from the consulting structural engieer requesting revisions. JCM
|
Routing Off Site -Energy | 6/16/2003 | | 6/27/2003 | | FAIL |
|
|
|
Contacted Ron O. for outside energy. kmm
|
Routing - PLUMBING | 6/26/2003 | | 6/27/2003 | | PASS |
|
|
|
per plans and 2000 upc, additional cross connection may be required, if an automatic soap dispensor is installed at the mop sink, provide a water supply fot it.
|
Routing - PLANNING | 6/26/2003 | | 6/26/2003 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/16/2003 | | 6/26/2003 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm
|
Routing - PUBLIC WORKS | 6/18/2003 | | 6/26/2003 | | PASS |
Brandi Dominguez
|
|
|
|
Routing - Erosion and Sediment | 6/16/2003 | | 6/17/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans. Person listed as Responsible Person is not certified by Boise City.
|
Routing - PLANNING Land Div | 6/13/2003 | | 6/16/2003 | | FAIL |
|
|
|
Prior to issuing building permit, must complete Record of Survey process. Record of Survey has been signed. Need recorded Record of Survey, recorded Notice of Buildable Parcel, recorded deed and new tax parcel number. Talked to Scott Freeman at ###-####.
|
Pending Assignment by JCM | 6/13/2003 | | 6/16/2003 | | DONE |
John Menard
|
|
|
6/16/2003 08:29:37 JCM - activity updated through activity BLDA166 from case BLD03-01377.
|
Plan routing begun/NEW & ADDTN | | | 6/13/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2003 | | DONE |
|
|
|
|
Application received | | | 6/11/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/11/2003 | | |
|
|
|
|
Fee Review-notes | 6/11/2003 | 6/11/2003 | | | |
|
|
|
|