Idaho Athletic Club - To construct a new 28,600 square foot, 2-story athletic club and related site improvements. This building contains a basketball court, swimming pool, exercise areas, locker rooms and accessory support areas. This building is constructed of reinforced concrete masonry block exterior walls with interior steel structural frame, concrete floors and metal roof deck. This building is fully fire sprinklered. All construction per the approved plans and attached comment list. DRH03-00071/CUP03-00023/PC#340-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/13/20044/13/2004 DONE
Permanent occupancy  4/13/2004 DONE
Perm. Occ. Cert. # 10098 issued 4-13-04 to the Idaho Athletic Club.
Permanent Occupancy 3/3/20043/3/2004 DONE
Details
BLD-Final3/1/20043/3/20043/3/2004PPASS
DetailsRuss Owen
dan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Ok for a perm oc. 3/2/2004 10:08:04 PM
BLD-Final2/18/20042/18/20042/18/2004PFAIL
DetailsRuss Owen
dan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore. called and left a message with dan, bottom handrails ext do not comply in exit tower. 2/18/2004 12:37:36 AM
BLD-Final2/2/20042/2/20042/2/2004PPART
DetailsJim Storey
Gary; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n made ok arch letter in your box/ handraillins missing back west stair wall mounts. 2/2/2004 4:03:49 PM
FIRE-Final Inspection1/8/20041/9/20041/9/2004AFAIL
DetailsTroy Cobbley
need alarm reports and could not test elevators 1/9/2004 10:31:52 AM
FIRE-Final Inspection1/9/20041/9/20041/9/2004PPASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinkler are finaled 1/9/2004 2:18:15 PM
Temporary occupancy  1/9/2004 DONE
Temp. Occ. Cert. # 5058 issued 1-9-04 to the Idaho Athletic Club.
FIRE-Final Inspection1/7/20041/8/20041/8/2004APART
DetailsTroy Cobbley
A temporary occupancy was given until the elevator has been tested, knox box is provided, signage per review note #33, remove plumbing pipe from sprinkler line at riser, provide address and paint curbing for fire dept access. Need NFPA 72 forms and monitoring verification 1/8/2004 10:06:42 AM
BLD-Final1/7/20041/8/20041/8/2004PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 1/7/2004 at 4:03:10 PM. Contact: ###-####. issued a c/n ok for temp oc . 1/8/2004 5:05:48 PM
BLD-Framing/Rough-in12/29/200312/30/200312/30/2003AFAIL
DetailsRuss Owen
cell ###-#### 12/29/2003 3:43:53 PM > this needs penetrations of 1 hr walls completed. also went over this with contractor. 12/30/2003 12:08:57 PM
BLD-Other12/29/200312/29/200312/29/2003PNH
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/29/2003 at 9:13:49 AM. Contact: ###-####. Called contractor unable to locate at job , need to meet with cont for this insp. 12/29/2003 3:39:40 PM
Print Occupancy Form  12/18/2003 DONE
BLD-Framing/Rough-in12/10/200312/11/200312/11/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/10/2003 at 10:24:25 AM. Contact: ###-####. Got letter from architect no 1 hr shaft needed at ducts through floor as long as they are sealed tight which they are. Need narchitect to clairify insulation at exterior walla some not contionous contractor notified and will address soon 2 days. 12/11/2003 11:45:38 AM
BLD-Framing/Rough-in12/3/200312/3/200312/3/2003PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/3/2003 at 8:08:10 AM. Contact: ###-####. need to complete the 1 hr walls and shafts at second floor also shafts will need to be addressedas to how they will be built as offsets exist contractor on site notified. 12/4/2003 1:54:00 PM
BLD-Framing/Rough-in11/18/200311/20/200311/20/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/18/2003 at 4:24:29 PM. Contact: ###-####. 1st floor framing minus elevator shaft OK 11/20/2003 5:05:55 PM
BLD-Framing/Rough-in11/14/200311/19/200311/18/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/14/2003 at 4:56:44 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 18 2003 4:27PM.
BLD-Footing9/15/20039/15/20039/15/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/15/2003 at 8:47:51 AM. Contact: ###-####. subject to s-i. 9/15/2003 12:38:52 AM
BLD-Foundation9/4/20039/5/20039/5/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/4/2003 at 8:44:54 AM. Contact: ###-####. ok subject to s-i. 9/4/2003 7:58:39 PM 9/4/2003 7:58:43 PM
BLD-Foundation9/4/20039/4/20039/4/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/4/2003 at 8:44:15 AM. Contact: ###-####. ok subject to s-i. 9/4/2003 12:28:49 AM
BLD-Foundation8/28/20038/29/20038/29/2003APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/28/2003 at 1:49:16 PM. Contact: ###-####.
BLD-Foundation8/26/20038/27/20038/27/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/26/2003 at 2:32:41 PM. Contact: ###-####.subject to special inspection. 8/28/2003 9:37:42 AM
BLD-Footing8/25/20038/26/20038/26/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/25/2003 at 9:18:48 AM. Contact: ###-####. Subject to s-i. 8/28/2003 12:17:27 PM
(F) Reprint permit  8/25/2003  
BLD-Footing8/21/20038/21/20038/21/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 8/21/2003 at 8:34:33 AM. Contact: ###-####.
Inspection Record Card- Bld  8/20/2003 DONE
Print Occupancy Form  8/20/2003 DONE
Telephone call  8/20/2003 DONE
permit ready and fees due
Issue PAID IN FULL permit  8/20/2003  
Plan assigned to (JCM)6/16/2003 8/19/2003 PASS
DetailsJohn Menard
8/19/2003 15:43:40 JCM - activity updated through activity BLDA022 from case BLD03-01377.
Routing - PLAN CHECK8/13/2003 8/19/2003 PASS
Routing Off Site - STRUCTURAL8/14/2003 8/19/2003 PASS
Contacted PDQ to take revised calcs of 8/14/03 to outside engineering. kmm Received an e-mail from the consulting structural engineer approving the revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/19/2003 PASS
Plan resubmittals received  8/18/2003 DONE
Received three copies of revised sheets S0.1, S3.0 and S3.1. Routed to John M. kmm
Routing Off Site -Energy8/11/2003 8/15/2003 PASS
Contacted Ron O for energy review on plans resubmitted 8/11/03. kmm Received e-mail from energy reviewer approving revisions. JCM
Plan resubmittals received  8/14/2003 DONE
Received letter of transmittal, three comments responses, three structural calc's, three misc. details and taken to John M.
Routing - PLANNING Land Div8/13/2003 8/13/2003 PASS
Approved by ROS 6190. Notice of Buildable Parcel recorded on 8/13/03.
Routing - FIRE8/7/2003 8/12/2003 PASS
resubmittal acceptable; separate swimming pool permit to be obtained.
Plan resubmittals received  8/11/2003 DONE
Recieved one copy of sheets T2.0, M3.1, M4.1, E2.1L, E2.2L, E4. Routed to John M. kmm
Routing - PLANNING Land Div8/7/2003 8/7/2003 FAIL
Need to complete vacation of easement. Need to approve and record Notice of Buildable Parcel. Need new recorded deed and new tax parcel number.
Plan resubmittals requested  8/7/2003  
E-mailed the architect a copy of the comment list from the consulting structural engineer, for the resubmittals, requesting revisions. JCM
Routing - PLANNING8/5/2003 8/7/2003 PASS
Susan Riggs/Marty Santoyo
Routing Off Site - STRUCTURAL8/5/2003 8/7/2003 FAIL
Contacted PDQ to take revised plans to outside engineering. kmm Received e-mailed comment list from the consulting structural engineer requesting additional revisions. JCM
Plan resubmittals requested  8/5/2003  
E-mailed the architect to request additional information on required special inspections. JCM
Routing - PLAN CHECK7/17/2003 8/5/2003 FAIL
Plan resubmittals received  8/1/2003 DONE
Received three copies of resubmittal sheets T0.0, T1.0, T2.0, C1.0, C2.0, C3.0, C4.0, C5.0, C6.0, L1.0,L2.0, A1.0, A1.1, A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A4.1, A4.2, A5.1, A5.2, A6.1, A7.1, A8.1, A8.2, A8.3, A8.4, A10.1, A10.2, A10.3, A11.1, A12.1, A12.2, S0.1, S1.0, S1.1, S2.0, S2.1, S3.0, S3.1, S4.1, S4.2, S5.1, M0.1, M1.1A, M1.1B, M1.2A, M1.2B, M1.3A, M1.3B, M2.1, M3.1, M4.1, P1.1A, P1.1B, P1.2A, P1.3A, P1.3B, P2.1A, P2.1B, P2.2A, P3.1, E0, E1.0, E2.1P, E2.1L, E2.1F, E2.2P, E2.2L, E2.2F, E3.0, E4.0, and (2) books of Calculations, (2) response letter packages, (2) letters from Idaho Athletic Club, (1) transmittal. Routed to John Menard.
Routing - FIRE7/11/2003 7/16/2003 FAIL
Need Haz Mat evaluation; 1-hour constructin for AS riser room. Review comments faxed to Roger Nielsen, architect.
Routing - PLAN CHECK6/27/2003 7/11/2003 FAIL
Plan resubmittals requested  7/11/2003  
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Plan resubmittals requested  7/8/2003  
Faxed the architect a copy of the plan review comment list from the consulting structural engieer requesting revisions. JCM
Routing Off Site -Energy6/16/2003 6/27/2003 FAIL
Contacted Ron O. for outside energy. kmm
Routing - PLUMBING6/26/2003 6/27/2003 PASS
per plans and 2000 upc, additional cross connection may be required, if an automatic soap dispensor is installed at the mop sink, provide a water supply fot it.
Routing - PLANNING6/26/2003 6/26/2003 FAIL
Routing Off Site - STRUCTURAL6/16/2003 6/26/2003 FAIL
Contacted PDQ to take plans to outside engineering. kmm
Routing - PUBLIC WORKS6/18/2003 6/26/2003 PASS
DetailsBrandi Dominguez
Routing - Erosion and Sediment6/16/2003 6/17/2003 PASS
ESC approved with conditions attached to plans. Person listed as Responsible Person is not certified by Boise City.
Routing - PLANNING Land Div6/13/2003 6/16/2003 FAIL
Prior to issuing building permit, must complete Record of Survey process. Record of Survey has been signed. Need recorded Record of Survey, recorded Notice of Buildable Parcel, recorded deed and new tax parcel number. Talked to Scott Freeman at ###-####.
Pending Assignment by JCM6/13/2003 6/16/2003 DONE
DetailsJohn Menard
6/16/2003 08:29:37 JCM - activity updated through activity BLDA166 from case BLD03-01377.
Plan routing begun/NEW & ADDTN  6/13/2003 DONE
Plans ACCEPTED BY PLAN TECH  6/13/2003 DONE
Application received  6/11/2003  
Recd Pcfee & Taken To Pln CK  6/11/2003  
Fee Review-notes6/11/20036/11/2003