Case Summary (BLD) | | | 4/11/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/28/2003 | 7/28/2003 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 7/28/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9744 issued 7-28-03 to Baumgart Construction.
|
BLD-Final | 7/25/2003 | 7/25/2003 | 7/25/2003 | P | PASS |
Jim Storey
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Temporary occupancy | | | 7/18/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4970 issued 7-18-03 to Baumgart Construction.
|
FIRE-Conference | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | PASS |
Rick Jackson
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows
|
BLD-Final | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Jim Storey
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows live load sign at mez/ under sink protection restaroom/ hand rail to mez. 7/17/2003 2:35:45 PM
|
FIRE-Final Inspection | 7/11/2003 | 7/11/2003 | 7/11/2003 | P | FAIL |
Rick Jackson
|
|
|
justin ###-#### manual flush bolts on main door; exit signs not working; need accessible door hardware on all doors per plans 7/11/2003 3:09:17 PM
|
Override - Parcel Holds | | | 7/11/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PART |
Steven Webb
|
|
|
###-#### justin Interior walls ok to cover, need additional wall brace on north side of interior (2) offices, (verify at final), set of 3 storage racks in warehouse need engineering, can verify loading, signage, bracing at final, contractor to secure fire/life safety prior to final. 7/10/2003 1:59:55 PM
|
Override - Parcel Holds | | | 7/10/2003 | | |
|
|
|
|
Plan assigned to (JCB) | 6/18/2003 | | 7/3/2003 | | PASS |
Jason Blais
|
|
|
7/3/2003 08:53:11 JCB - activity updated through activity BLDA022 from case BLD03-01427.
|
Routing - PLAN CHECK | 7/3/2003 | | 7/3/2003 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2003 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 7/3/2003 | | |
|
|
|
|
Print Occupancy Form | | | 7/3/2003 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2003 | | DONE |
|
|
|
permit ready
|
Override - Parcel Holds | | | 7/3/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/3/2003 | | DONE |
|
|
|
|
Routing - FIRE | 6/27/2003 | | 7/2/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/18/2003 | | 6/27/2003 | | PEND |
|
|
|
Plan review report sent and faxed to architect. No response required. When approved by Fire Dept. permit can be issued. Plans routed to Fire Dept. for review.
|
Plan resubmittals received | | | 6/18/2003 | | DONE |
|
|
|
received three A1.1 sheets and put with plans.
|
Plans ACCEPTED BY PLAN TECH | | | 6/17/2003 | | PEND |
|
|
|
Plans not dimensioned
|
Application received | | | 6/13/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2003 | | DONE |
|
|
|
|
Fee Review-notes | 6/13/2003 | 6/13/2003 | | | |
|
|
|
|