Permit Information
Permit NumberBLD03-01431
StatusFinaled
Name COREY BARTON HOMES
Site Address 12343 W ABRAM DR
Project Name 
Customer Number 
ePlanReviewNo
Description
"SAVANNA PLAN" To construct a three bedroom, two bathroom 1268 sq. ft. single story single family dwelling with a attached 460 sq. ft. two car garage. Per approved plans, engineering and requirement list. PC#355 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/200312/17/200312/17/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/17/2003 at 7:08:43 AM. Contact: ###-####. C/C issued. 12/17/2003 10:00:19 AM
DOC - Permit Finaled12/17/200312/17/200312/17/2003APASS
DetailsJim Sly
Finaled by inspector at 12/17/2003 10:00:25 AM
BLD-Energy code compliance11/12/200311/12/200311/12/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/12/2003 at 11:19:25 AM. Contact: ###-####.
BLD-Framing/Rough-in11/10/200311/10/200311/10/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/10/2003 at 10:40:18 AM. Contact: ###-####.
BLD-Foundation10/27/200310/29/200310/29/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/27/2003 at 5:23:40 PM. Contact: ###-####.
BLD-Footing10/27/200310/28/200310/28/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/27/2003 at 5:23:11 PM. Contact: ###-####.
Issue PAID IN FULL permit  10/15/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/10/2003 DONE
Inspection Record Card- Bld  10/10/2003 DONE
Permit Ready to Issue  10/10/2003 DONE
Telephone call  10/10/2003 DONE
Left message for Michelle that permit is ready & fees
Routing - PLAN CHECK6/18/2003 10/10/2003 DONE
Plan assigned to (SAM)6/19/2003 10/10/2003 PASS
DetailsSteve Munroe
10/10/2003 13:22:55 SAM - activity updated through activity BLDA022 from case BLD03-01431.
Plan Reviewer's activity  9/24/2003 PEND
9/24/03 11:45 I called and left a message for Corey about these plans. I informed them that they need to either write time a letter asking for an extension or provide me the engineering by September 30. If either one of these are not done the plans will be voided.
Print Pending Permit.LaserJet4  6/20/2003  
Plan Review Report  6/20/2003  
Plan Reviewer's activity  6/20/2003 PEND
Plans are on hold till I recieve the engineering done under the 2000 code.
Pending Assignment by DJO6/13/2003 6/19/2003 DONE
DetailsDan Overy
6/19/2003 14:12:39 SAM - activity updated through activity BLDA183 from case BLD03-01431.
Routing - PLANNING6/13/2003 6/18/2003 PASS
Routing - PUBLIC WORKS6/18/2003 6/18/2003 PASS
Application received  6/13/2003