BLD-Final | 12/4/2003 | 12/5/2003 | 12/5/2003 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 3:23:59 PM. Contact: ###-####.
|
DOC - Permit Finaled | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 12/5/2003 2:48:13 PM
|
BLD-Grading Inspection | 12/4/2003 | 12/4/2003 | 12/4/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved. Recommended to Chris Connor that downspouts reaplace chains that were installed so that runoff can be more effectively transported away from the foundation.
|
BLD-Final | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 11:22:31 AM. Contact: ###-####. C/N has been issued by Insp. 415 12/4/2003 1:47:29 PM
|
BLD-Final | 11/28/2003 | 12/1/2003 | 12/1/2003 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/28/2003 at 8:09:20 AM. Contact: ###-####.
need hillside and f/p signoff before a final inspection can be made 12/2/2003 10:48:57 AM
|
BLD-Wall cover | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 7:28:31 AM. Contact: ###-####.
int. shear ok 10/3/2003 12:26:43 PM
|
BLD-Wall cover | 9/26/2003 | 9/29/2003 | 9/29/2003 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/26/2003 at 4:35:22 PM. Contact: ###-####. 9/29/2003 11:18:54 AM out of time rescheduled for pm 9/29/2003 11:22:05 AM
|
BLD-Wall cover | 9/29/2003 | 9/29/2003 | 9/29/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/26/2003 at 4:35:22 PM. Contact: ###-####.
still need to verify U value of windows, and interior shear 9/29/2003 12:33:44 PM
|
BLD-Framing/Rough-in | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 2:05:56 PM. Contact: ###-####.c/n posted 9/24/2003 2:41:03 PM
|
BLD-Framing/Rough-in | 9/24/2003 | 9/24/2003 | 9/24/2003 | P | CANC |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 9/19/2003 | 9/23/2003 | 9/23/2003 | A | FAIL |
Tony Young
|
|
|
Shear wall inspection please//Scheduled by a contractor via Hello! on 9/19/2003 at 7:26:00 AM. Contact: ###-####.
conf. only 9/23/2003 2:11:29 PM
|
BLD-Foundation | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PART |
Dave Hannah
|
|
|
terry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore work in progress forms up rebar in progress still needs to set hold downs 7/22/2003 2:48:22 PM
|
BLD-Footing | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | PART |
Steven Webb
|
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows wip--85% ready at time of inspection. 7/16/2003 11:53:12 AM
|
BLD-Grading Inspection | 7/16/2003 | 7/16/2003 | 7/16/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
Plan assigned to (DJO) | 7/10/2003 | 7/10/2003 | 7/10/2003 | | PASS |
Dan Overy
|
|
|
7/10/2003 09:37:02 DJO - activity updated through activity BLDA022 from case BLD03-01450.
|
Case Summary (BLD) | | | 7/10/2003 | | DONE |
|
|
|
|
Plan Review Report | | | 7/10/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2003 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/10/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/10/2003 | | |
|
|
|
|
Routing - PLAN CHECK | 6/27/2003 | | 7/1/2003 | | PEND |
|
|
|
taken back to Erosion
|
Plan resubmittals received | | | 7/1/2003 | | DONE |
|
|
|
four copies of Erosion and Sediment Control Plan, and put with plans in Dans office
|
Routing - Erosion and Sediment | 7/1/2003 | | 7/1/2003 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - Erosion and Sediment | 6/25/2003 | | 6/27/2003 | | FAIL |
|
|
|
ESC plan not per 8-17, need const. schedule and inspection table.
|
Routing - FIRE | 6/27/2003 | | 6/27/2003 | | DONE |
|
|
|
No fire sprinklers required (Highlands Hackberry #4 subdiv.)
|
Routing - PLANNING | 6/23/2003 | | 6/24/2003 | | PASS |
|
|
|
Approved Mark P.
|
Routing - PUBLIC WORKS | 6/20/2003 | | 6/23/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 6/18/2003 | | 6/20/2003 | | PASS |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 1(cfh03-00009) WITH CONDITIONS OF APPROVAL IN LETTER FROM BOISE PUBLIC WORKS ATTACHED TO THE PLANSET.
|
Application received | | | 6/16/2003 | | |
|
|
|
|
Pending Assignment by DJO | 6/16/2003 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 7/1/2003 | | | | |
|
|
|
|