Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01459
StatusFinaled
Name DONUT STOP & COFFEE
Site Address 701 N ORCHARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(DONUT STOP & COFFEE) New tenant for donut/coffee shop use in an existing 1,178 sq. ft. building per approved plans on file. Work to include providing an accessible entrance if not existing, interior finish, new Type I hood installation, mechanical work, plumbing work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. Lighting/switching, heating/cooling, envelope, and water heating existing with no changes. NOTE: This building is NOT fire sprinklered. (PC#0355-03) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20038/25/20038/25/2003APASS
DetailsTom Arcoraci
tammy; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 8/25/2003 9:26:15 AM
First Notice 8/25/20038/25/2003 DONE
Permanent Occupancy 8/25/20038/25/2003 DONE
Details
Permanent occupancy UNPAID FEE  8/25/2003 DONE
Perm. Occ. Cert. #9776 issued to the Donut Stop and Coffee.
FIRE-Final Inspection8/19/20038/20/20038/20/2003APASS
DetailsTroy Cobbley
Life safety OK. Structural inspector to verify hardware on the rear exit door when installed 8/20/2003 11:00:35 AM
FIRE-Final Inspection8/19/20038/20/20038/20/2003APASS
DetailsTroy Cobbley
Life safety OK. Structural inspector to verify hardware on the rear exit door when installed 8/20/2003 11:00:35 AM
FIRE-Final Inspection8/19/20038/20/20038/20/2003APASS
DetailsTroy Cobbley
Life safety OK. Structural inspector to verify hardware on the rear exit door when installed 8/20/2003 11:00:35 AM
FIRE-Final Inspection8/15/20038/18/20038/18/2003AFAIL
DetailsTroy Cobbley
TAMMY; Phone #: ###-#### Provide approved door hardware all doors.
Move fire extinguisher to 48". 8/18/2003 10:35:17 AM 8/18/2003 10:35:39 AM
FIRE-Conference7/25/20037/25/20037/25/2003ADONE
DetailsTroy Cobbley
I spoke with the male owner about life safety issues. In paticular was door hardware which was incorrect. I verified items with Jason Blais. The male owner became quite verbally excited about the city and their personell and policies. I told him to have a nice day and left the premise. Next inspection should be fun
Inspection Record Card- Bld  7/25/2003 DONE
Print Occupancy Form  7/25/2003 DONE
Inspection Record Card- Bld  7/10/2003 DONE
Print Occupancy Form  7/10/2003 DONE
Telephone call  7/10/2003 DONE
LEFT MESS THAT PERMIT IS READY
Issue PAID IN FULL permit  7/10/2003 DONE
Routing - PLAN CHECK7/9/2003 7/9/2003 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  7/9/2003 PASS
Print Pending Permit.LaserJet4  7/9/2003  
Case Summary (BLD)  7/9/2003  
Plan assigned to (JCB)6/19/2003 7/9/2003 PASS
DetailsJason Blais
7/9/2003 08:13:38 JCB - activity updated through activity BLDA022 from case BLD03-01459.
Routing - FIRE7/1/2003 7/8/2003 PASS
Telephone call  7/1/2003  
Called mechanical engineer concerning grease duct wrap system. To be installed with (2) layers per ES Reports #4975 or #5907. Cannot find an ES Report approving only (1) layer. Red-lined on plans.
Routing - PLAN CHECK6/23/2003 7/1/2003 PEND
Plan review report sent to tenants. No response required. When approved by Fire Dept. permit can be issued. Plans to route to Fire Dept. for review.
Routing - PLUMBING6/20/2003 6/23/2003 PASS
may need premise backflow protection and thermal expansion protection. water heater may need pan with drain.
Routing - PUBLIC WORKS6/19/2003 6/20/2003 PASS
Plans ACCEPTED BY PLAN TECH  6/19/2003 PASS
<25,000.00
Application received  6/17/2003  
Recd Pcfee & Taken To Pln CK  6/17/2003  
Fee Review-notes6/17/20036/17/2003