(GRACE FURNITURE - EMPIRE BLDG - 1ST FLOOR) This building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall, too big, and has too many stories. To remodel an existing tenant space located on the first floor of the Empire Building. A 657 square foot mezzanine will be constructed within this tenant space. The total floor area of this tenant space will be 3,767 square feet (3,110 square feet on the grade level and 657 square feet on the mezzanine). Work is to include a store front door, raised display area, and a mezzanine. The mezzanine will be constructed of steel beams, a concrete pan deck, and cable lateral bracing. It will be supported by the existing building columns. The guard around the mezzanine will be constructed of steel posts with stretched cables. All work shall comply with the approved drawing, adopted codes, and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/9/20042/9/2004 DONE
Permanent occupancy UNPAID FEE  2/9/2004 DONE
Perm. Occ. Cert. # 9980 issued 2-9-04 to Grace Furniture in the Empire Bldg.
Permanent Occupancy 12/29/200312/29/2003 DONE
Details
BLD-Final12/29/200312/29/200312/29/2003PPASS
DetailsDave Hannah
pam ( ekc) PLEASE CALL FOR KEY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok for perm occ 12/29/2003 2:22:18 PM
FIRE-Final Inspection11/12/200311/13/200311/13/2003APASS
DetailsRick Jackson
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final11/13/200311/13/200311/13/2003PPART
DetailsDave Hannah
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ need panic hardware on doors and returns on handrails 11/13/2003 3:48:35 PM
BLD-Wall cover11/12/200311/12/200311/12/2003PPART
DetailsDave Hannah
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ceiling grid ok to cover 11/12/2003 4:56:01 PM
BLD-Framing/Rough-in10/3/200310/3/200310/3/2003PPART
DetailsRuss Owen
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore . needs special inspection for deck and welding. 10/3/2003 12:14:51 AM
Issue PAID IN FULL permit  8/22/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/20/2003 PASS
Inspection Record Card- Bld  8/20/2003 DONE
Print Occupancy Form  8/20/2003 DONE
Telephone call  8/20/2003 DONE
permit ready and fees due
Plan assigned to (CJW)6/25/2003 8/20/2003 PASS
DetailsCarl Westfall
8/20/2003 10:17:38 CJW - activity updated through activity BLDA022 from case BLD03-01501.
Routing - PLAN CHECK7/21/2003 8/20/2003 PASS
(8-14-03) Failed 2nd IBC plan review. Resubmittal review completed. Three items required additional information. (8-20-03) Drawings approved after review of resubmitted items.
Plan resubmittals received  8/18/2003  
Received two copies of revised sheets A4.0 & A5.0, Albi Manufacturing product literature and one copy of explanation. Routed to Carl W. kmm
Plan resubmittals received  8/7/2003 DONE
Received two copies of revised sheets A1.0, A2.0, A3.0, A4.0, A4.1, A5.0, S1.0, two copies of revised structural calcs, one letter of explanation, one copy of lighting compliance report and one copy of intumescent paint cutheet. Routed to Carl W. kmm
Routing - PLANNING7/18/2003 7/21/2003 DONE
Routing - FIRE7/15/2003 7/17/2003 PASS
Routing - PLAN CHECK6/27/2003 7/11/2003  
Failed first IBC plan review. IBC plan review started July 11, 2003 and finished July 15, 2003. A response from the architect was required. See the plan review report. A copy was E-mailed to the archtiect.
Routing - PUBLIC WORKS6/25/2003 6/27/2003 PASS
Application received  6/20/2003  
Recd Pcfee & Taken To Pln CK  6/20/2003  
Fee Review-notes6/20/20036/20/2003