Permit Information
Permit NumberBLD03-01510
StatusFinaled
Name CREEKSIDE CUSTOM HOMES
Site Address 4879 N ARROW VILLA WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2808 sq. ft. two story single family dwelling with a 897 sq. ft. attached three car garage, a 368 sq. ft. covered entry porch and a 390 sq. ft. partially covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible space will be maintained. (1st floor 1550 sq. ft.)(2nd floor 1258 sq. ft.) PC #408 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/29/200310/30/200310/30/2003APART
DetailsTony Young
justin --call for access; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
working on c/n items 10/30/2003 11:41:13 AM
BLD-Grading Inspection10/30/200310/30/200310/30/2003 PASS
DetailsRita DeYoung
Final grading and drainage approved.
BLD-Conference10/30/200310/30/200310/30/2003PPASS
DetailsTony Young
justin ph# ###-####
final ok, l of c issued 10/30/2003 1:59:11 PM
BLD-Final10/30/200310/30/200310/30/2003PPASS
DetailsTony Young
DOC - Permit Finaled10/30/200310/30/200310/30/2003PPASS
DetailsTony Young
Finaled by inspector at 10/30/2003 2:04:54 PM
BLD-Final10/27/200310/28/200310/28/2003ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 10/27/2003 at 9:55:06 PM. Contact: ###-####.
c/n posted 10/28/2003 10:06:48 AM JUSTIN CALLED TO CANC THIS INSPECTION WAS NOT READY///DLD 10-28-03 10:06 AM
BLD-Grading Inspection10/27/200310/28/200310/28/2003ACANC
DetailsRita DeYoung
Scheduled by a contractor via Hello! on 10/27/2003 at 9:55:40 PM. Contact: ###-####.
BLD-Energy code compliance9/9/20039/9/20039/9/2003PPASS
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Framing/Rough-in9/8/20039/8/20039/8/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/8/2003 at 7:42:12 AM. Contact: ###-####. Posted c/n to recall when ready still blowing insulation at this time. 9/7/2003 9:30:14 PM
BLD-Energy code compliance9/8/20039/8/20039/8/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 9/8/2003 at 7:42:29 AM. Contact: ###-####.Posted c/n to complete and recall still blowning insulation. 9/7/2003 9:31:17 PM
BLD-Framing/Rough-in9/4/20039/4/20039/4/2003PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/4/2003 at 7:59:49 AM. Contact: ###-####.
c/n,,, ok to insulate 9/4/2003 4:19:56 PM
BLD-Framing/Rough-in9/3/20039/3/20039/3/2003PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 9/3/2003 at 7:57:49 AM. Contact: ###-####.
need trades 1st,,, conf. only w/ tyler the framer,
c/n on back of truss specs 9/3/2003 3:37:25 PM
BLD-Energy code compliance9/3/20039/3/20039/3/2003PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 9/3/2003 at 7:58:04 AM. Contact: ###-####.
seal pack only 9/3/2003 3:31:44 PM
BLD-Energy code compliance8/29/20039/2/20039/2/2003PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/29/2003 at 7:48:03 AM. Contact: ###-####.
seal package ok 9/2/2003 3:18:05 PM
BLD-Conference8/29/20039/2/20039/2/2003APART
DetailsTony Young
working on nailing of block lines as going up w/ building wrap, ok so far 9/2/2003 11:39:45 AM
BLD-Framing/Rough-in8/29/20038/29/20038/29/2003PPART
DetailsTony Young
PLease caal first//Shear wall also please//Scheduled by a contractor via Hello! on 8/29/2003 at 7:46:28 AM. Contact: ###-####.
ext ok to cover after finish nailing off block lines 8/29/2003 3:33:52 PM
BLD-Foundation7/30/20037/31/20037/31/2003APART
DetailsTony Young
jay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing7/29/20037/29/20037/29/2003PPART
DetailsTony Young
jay; Phone #: ###-#### Internet Inspection Request from: Annette Moore
wip 7/29/2003 3:56:13 PM
BLD-Grading Inspection7/28/20037/28/20037/28/2003 DONE
DetailsRita DeYoung
Geotech engineer approved the footing subgrade.
Issue & PRINT permit  7/24/2003  
Plan assigned to (DJO)7/21/20037/21/20037/21/2003 PASS
DetailsDan Overy
7/21/2003 08:58:12 DJO - activity updated through activity BLDA022 from case BLD03-01510.
Case Summary (BLD)  7/21/2003 DONE
Plan Review Report  7/21/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/21/2003 DONE
Inspection Record Card- Bld  7/21/2003 DONE
Print Occupancy Form  7/21/2003 DONE
Telephone call  7/21/2003 DONE
permit ready and fees due
Plans ACCEPTED BY PLAN CHECK  7/21/2003  
Routing - FIRE7/7/2003 7/8/2003 DONE
7/8/03- OK. D. Miller indicates no AS required for this subdivision.
7/7-No information for Eyrie Canyon on file. Requested further info from FD/Dave MIller; hold for response.
Routing - Erosion and Sediment7/7/2003 7/7/2003 PASS
ESC plan approved with attached conditions.
Routing - PLANNING7/7/2003 7/7/2003 PASS
Routing - PLANNING6/26/2003 6/30/2003 FAIL
Doesn't meet rear 30 ft. setback required in R-1B zone. Called Justin and told him.
Routing - PLANNING6/25/2003 6/25/2003 FAIL
Plat not recorded. AKT
Routing - PUBLIC WORKS6/24/2003 6/25/2003 PASS
NORTHWEST BOISE SEWER DISTRICT
Routing - PUBLIC WORKS GRADING6/20/2003 6/24/2003 PASS
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to plans.
Application received  6/20/2003  
Pending Assignment by DJO6/20/2003    
DetailsDan Overy
Routing - PLAN CHECK7/8/2003