Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD03-01512
StatusFinaled
Name LIFESTYLE HOMES
Site Address 4274 E APHRODITE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2108 sq. ft. two story single family dwelling with a 882 sq. ft. attached three car garage, a 180 sq. ft. covered entry porch and a 160 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1230 sq. ft.)(2nd floor 878 sq. ft.) PC #383 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/200311/14/200311/14/2003APASS
DetailsJim Storey
DOC - Permit Finaled11/14/200311/14/200311/14/2003APASS
DetailsJim Storey
Finaled by inspector at 11/14/2003 10:34:03 AM
FIRE-Final Inspection11/13/200311/13/200311/13/2003PCANC
DetailsRick Jackson
please come eary afternoon they will be puting final on hardwood latter
garage door code 2222 enter; Phone #: ###-#### Internet Inspection Request from: David Mortensen Inspection cancelled from web by: David Mortensen
BLD-Final11/13/200311/13/200311/13/2003PCANC
DetailsJim Storey
please come eary afternoon they will be put final on hardwood later.
garage door code 2222 enter; Phone #: ###-#### Internet Inspection Request from: David Mortensen
BLD-Energy code compliance9/23/20039/23/20039/23/2003APASS
DetailsJim Storey
I will be in this morning geting the back wall Eng. Aproved and I will bring it out as soon as they are done. I also have bolt info from the truss Co.; Phone #: ###-#### Internet Inspection Request from: David Mortensen framing c/n made ok. 9/23/2003 9:27:49 AM
BLD-Energy code compliance9/21/20039/22/20039/22/2003AFAIL
DetailsJim Storey
The rockers did start they did not get the word untill it was to late i have pulled them off now. call me and i will meet you out there if we have to pull some off we will. thanks David ; Phone #: ###-#### Internet Inspection Request from: David Mortensen 5 ply girder needs 1/2 bolts all joints. 9/22/2003 10:12:23 AM
BLD-Energy code compliance9/17/20039/19/20039/19/2003AFAIL
DetailsJim Storey
inspect insulation but back wall we will have eng. on monday.; Phone #: ###-#### Internet Inspection Request from: David Mortensen other c/n idems not completed no gyp to be instaled. 9/19/2003 9:56:10 AM
BLD-Framing/Rough-in9/17/20039/17/20039/17/2003PFAIL
DetailsJim Storey
inspect late afternoon after HVAC reinspection is done; Phone #: ###-#### Internet Inspection Request from: David Mortensen plan modifacation with eingeering required to be aproved by plan review. 9/17/2003 4:49:05 PM
BLD-Foundation7/28/20037/29/20037/29/2003PPASS
DetailsJim Storey
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing7/25/20037/28/20037/28/2003APASS
DetailsDave Hannah
###-####
Issue PAID IN FULL permit  7/23/2003 DONE
Inspection Record Card- Bld  7/2/2003 DONE
Telephone call  7/2/2003 DONE
permit ready and fees due
Plan assigned to (DJO)6/30/20036/30/20037/1/2003 PASS
DetailsDan Overy
7/1/2003 15:30:49 DJO - activity updated through activity BLDA022 from case BLD03-01512.
Plan Reviewer's activity  7/1/2003 DONE
spoke with designer. will red-line corrections
PLANS/APPL TAKEN TO FRONT DESK  7/1/2003 DONE
Case Summary (BLD)  7/1/2003  
Plan Review Report  7/1/2003 DONE
Plan Reviewer's activity  6/30/2003 PEND
spoke with Kent from lifestyle about corrections to plans. will issue after designer calls and verifies/resolves issues.


Plans ACCEPTED BY PLAN CHECK  6/30/2003  
Routing - PLANNING6/20/2003 6/24/2003 PASS
Routing - PUBLIC WORKS6/24/2003 6/24/2003 PASS
Application received  6/20/2003  
Pending Assignment by DJO6/20/2003    
DetailsDan Overy
Routing - PLAN CHECK6/24/2003