Description
(VANILLA FINISH - NO OCCUPANCY / NO TENANT)(ORCHARD CENTER MALL) To create a new 6,073 sq. ft. vacant tenant space within an existing 20,370 sq.ft. building for proposed future retail tenant. NOTE:This building is fully sprinklered for allowable area increase under BLD03-01810; FIR03-00390. Work includes sective demolition; construction of new interior walls to create restroom(s), future storage and office area; installation of second exit; removal of ceiling panels & painting of exposed structure black; and modification of electrical, mechanical, plumbing and sprinkler system as needed to meet tenant needs and comply with current adopted codes and ordinances. All per approved plans, red-line notes there on and all attached plan review conditions of reviewing agencies. A"Letter of Compliance" is required for this permit project scope. DRH03-00119 PC03-376/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/22/20044/22/20044/22/2004 CANC
DetailsTom Arcoraci
DOC - Permit Expired4/22/20044/22/20044/22/2004APASS
DetailsTom Arcoraci
Expired by inspector at 4/22/2004 10:42:48 AM
BLD-Aging Inspection2/19/20042/19/20042/19/2004 NR
DetailsTom Arcoraci
3-24 ex 2/19/2004 8:56:18 AM
BLD-Final10/2/200310/3/200310/3/2003PPASS
DetailsTom Arcoraci
###-#### mark ok for letter 10/3/2003 2:19:02 PM
FIRE-Final Inspection10/3/200310/3/200310/3/2003PPASS
DetailsRick Jackson
Permit Ready to Issue  9/26/2003  
Inspection Record Card- Bld  9/26/2003 DONE
Issue & PRINT to be Invoiced  9/26/2003 DONE
Routing - PLAN CHECK9/25/2003 9/25/2003 PASS
Approved as noted on plans and attached plan review conditions of all reviewing agencies.
PLANS/APPL TAKEN TO FRONT DESK  9/25/2003 PASS
To permit desk to issue.
Routing - PLAN CHECK9/19/2003 9/25/2003 PEND
Routed back to fire code analyst. BLD03-01739, Snake River Pool & Spa will be under separate plans to allow the three VANILLA SPACE permits to be issued while waiting for hazardous materials report for Snake River Pool & Spa.
Plan assigned to (DRS)6/27/2003 9/25/2003 PASS
DetailsDan Stuart
9/25/2003 07:23:20 DRS - activity updated through activity BLDA022 from case BLD03-01554.
Routing - FIRE9/24/2003 9/24/2003 PASS
Snake River Pool & Spa, BLD03-01739 to be under separate plan submittal to allow the issuing of permits for (3) Vanilla Finish spaces. No occupancy or use of the three Vanilla Finish Spaces 1346 S. Orchard (BLD03-01554); 1342 S. Orchard (BLD03-01738); and 1338 S. Orchard (BLD03-01880), until the tenant improvement permits are issued, the sprinkler system throughout the building has been approved and the sprinkler alarm monitoring system has been permited, installed and approved.
Routing - FIRE9/17/2003 9/18/2003 FAIL
Items related to this permit are acceptable but Haz Mat info not acceptable for Snake River Pool. Since all permits are on one set of plans, approved plans cannot be issued until the Snake River Pool issues are resolved. Faxed revised review to archtect.
Routing - PLAN CHECK9/15/2003 9/17/2003 PEND
Resubmittals incerted by John Menard, 9/9/03, with plans routed to fire code analyst while I was on vacation. I checked with fire code analyst and determined he would not get to plans for a couple of days so I retrieved them for review. The basic restroom layout detail for all new restrooms was still incorrect, so I called the architect and red-lined the plans. Energy code analysis also incorrect. I met with architect at city office on 9/17/03 to review and he will resubmit while I circulate plans back to fire code analyst.
Plan resubmittals received  9/9/2003 DONE
Received two copies of revised sheets, A1.0, A1.1, A1.2, A1.3, A1.4, A2.1, A3.1, A3.2, E1.1, M0.0, M1.0, M2.0, one copy of response letter, four copies of envelope compliance cert., two copies of struct. claculations for orcard center mall openings, four copies of United Water letter, one copy of chemicals for pools and spa and response letter regarding the external storage area. Routed to Dan S. kmm
Telephone call  9/3/2003 DONE
telcon freom Pat Olsen. Agreed to accept one existing hydrant directly in front of shopping mall, across Orchard St.
Plan resubmittals requested  8/5/2003 FAIL
Faxed, e-mailed & mailed copy of plan review report items needing to be addressed for code compliance to Pat Dalgleish & Stan Olson.
Telephone call  8/5/2003 DONE
Talked with Pat Dalgleish concerning hazardous materials report and need to provide clarification on items not clearly addressed in his response of 7/31/03.
Telephone call  8/5/2003 DONE
Mark Bowen called to inquire about resubmittals received and hazardous materials list. I told him I was working on plan resubmittals and the response was incomplete and I was preparing further clarification review comments to send to architect.
Routing - PLAN CHECK7/28/2003 8/5/2003 FAIL
Inserted new copies of plans into original set. Some portions of previous plan check items needing corrected were not addressed; only partially addressed; or modifications to the plans for exiting and creation of a 4th tenant space in the building required additional clarification & details.
Plan resubmittals received  8/4/2003 DONE
Two sets of A1.1,A2.1, A3.2, taken to Dan S.
Routing - FIRE7/22/2003 7/28/2003 FAIL
Comments faxed to architect. FD access, water suppy and Haz Mat issues.
Routing - PLAN CHECK7/9/2003 7/22/2003 FAIL
Plans incomplete. Faxed copy of plan review comments to architect for resubmittal response. Routing plans to fire code analyst for review.
Plan resubmittals requested  7/22/2003 FAIL
Copy of plan review comments faxed and mailed to architect of record.
Telephone call  7/18/2003 DONE
Call to Mark Bowen to discuss the way the plans were turned in. There are three tenant spaces being created and each has a tenant name given but only one space has a complete interior finish shown. there was also only one application for a permit submitted. As there are three spaces each tenant space will need a permit to cover the scope of work to be done and so that each can receive either a certificate of occupancy ( Snake River Pool & Spa) or a letter of compliance (proposed Everton Matress & The Children's Store). Mark stated that the building owner & owner of Snake river Pool & Spa, Jim Paxton, would do the demo, fully sprinkler the building, create interior walls & restrooms as shown on approved plans but that the proposed tenants ( Everton Mattress & The Children's Store) would need to provide their own applications and plans for work to finish up thier tenant spaces per thier needs and for certificate of occupancy. Mark felt that Everton Mattress would do very little additional work if any (probably and MIS permit but he felt The Children's Store would do several additional modification within thier proposed space and would they are responsible to provide application and plans for their upgrades and to get a certificate of occupancy. I told him I would do a permit for each space. the two unoccupied spaces would be "Vanill Finish" only, no occupancy, to the extent indicated on the approved plans. the same set of plans could be used for all three projects and had to be at the job site. This would allow Snake River Pool & Spa to be completed and approved for occupancy while other spaces were still being finished and each of the other spaces could act independantly for thier finish. The only item that would need to be completed throughout the building before any space could be occupied is the sprinkler & alarm system per NFPA 13 & the 2000 IFC as regulated by the fire department. I told mark I would need two more applications and separate certificate of values for each space & permit.
Routing - PLANNING7/2/2003 7/9/2003 PASS
Approve per DRH03-00119 and as noted on the plans.
Routing - PLANNING Land Div7/1/2003 7/1/2003 PASS
Approved, existing building no addition.
Routing - PUBLIC WORKS6/27/2003 7/1/2003 PASS
Application received  6/26/2003  
ONE VALUE WAS TURNED IN ON THIS PERMIT, PERMITS WERE SPLIT INTO A TOTAL OF 4 PERMITS. I TRASFERED THE FEES TO OTHER PERMIT...BLD03-01554 AND BLD03-01739...LH
Recd Pcfee & Taken To Pln CK  6/26/2003  
Fee Review-notes6/26/20036/26/2003