BLD-Conference | 12/10/2003 | 12/11/2003 | 12/11/2003 | A | DONE |
Dave Hannah
|
|
|
|
First Notice | | 12/11/2003 | 12/11/2003 | | DONE |
|
|
|
|
BLD-Final | 12/11/2003 | 12/11/2003 | 12/11/2003 | A | PASS |
Dave Hannah
|
|
|
ok for perm occ
|
Permanent Occupancy | | 12/11/2003 | 12/11/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/11/2003 | | DONE |
|
|
|
Perm. Occ. Cert. # 9903 issued 12-11-03 to the Milkyway Restuarant on the 1st floor of the Empire Bldg.
|
BLD-Final | 12/9/2003 | 12/10/2003 | 12/10/2003 | A | PART |
Tony Young
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ok for temp. occ. pending trades and other outstanding issues w/ 425 12/10/2003 1:30:31 PM
|
FIRE-Final Inspection | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Final Inspection | 12/1/2003 | 12/1/2003 | 12/1/2003 | P | FAIL |
Rick Jackson
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore not a final butr sprinkler rough-in; see FIR permit for sprinklers 12/1/2003 3:58:14 PM
|
BLD-Conference | 11/6/2003 | 11/6/2003 | 11/6/2003 | P | DONE |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Wall cover | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | CANC |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | PART |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok cover steel stud walls 11/5/2003 12:34:21 PM
|
BLD-Framing/Rough-in | 10/29/2003 | 10/30/2003 | 10/30/2003 | A | PART |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover food prep area 10/30/2003 2:15:37 PM
|
BLD-Framing/Rough-in | 10/24/2003 | 10/27/2003 | 10/27/2003 | A | PART |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing around shaft 10/27/2003 3:04:44 AM
|
BLD-Conference | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | DONE |
Dave Hannah
|
|
|
tim ###-#### need to buld stairs to plan 10/22/2003 2:13:41 PM
|
Issue PAID IN FULL permit | | | 9/22/2003 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/11/2003 | | 8/20/2003 | | PASS |
Carl Westfall
|
|
|
8/20/2003 13:46:39 CJW - activity updated through activity BLDA022 from case BLD03-01560.
|
Routing - PLAN CHECK | 7/30/2003 | | 8/20/2003 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/20/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/20/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/20/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan resubmittals received | | | 8/18/2003 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A2.4 and one copy of response letter. Routed to Carl W. kmm
|
Plan resubmittals received | | | 8/7/2003 | | DONE |
|
|
|
Received two copies of revised sheets A2.0, A2.3, A2.4, A3.0 One copy of letter of explenation and one copy of duct wrap cutsheets. Routed to Carl Westfall. kmm
|
Routing - FIRE | 7/25/2003 | | 7/29/2003 | | PASS |
|
|
|
Review comments faxed to architect for reference.
|
Routing - PLANNING | 7/23/2003 | | 7/25/2003 | | PASS |
|
|
|
Approve
|
Plan resubmittals received | | | 7/23/2003 | | DONE |
|
|
|
Received three copies of revised sheets A0.0, A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A3.0, A4.0, P1.1, P2.0, P2.1, P2.2, P2.3, P2.4, P3.1, P4.1, M1.1, M1.2, M2.1, M2.2, M2.3, M3.1, M3.2, M4.1, M5.1, E1.1, E1.2, E2.1, E2.2, E3.1, E3.2, E3.3, E4.1, E4.2, E5.1, E5.2. Routed to Carl W. kmm
|
Routing - PLAN CHECK | 7/16/2003 | | 7/23/2003 | | |
|
|
|
Failed first IBC plan review. IBC plan review started July 18, 2003 and finished July 23, 2003. A response from the architect was required. See the plan review report.
|
Routing - PUBLIC WORKS | 7/14/2003 | | 7/16/2003 | | PASS |
|
|
|
|
Routing - PLUMBING | 7/16/2003 | | 7/16/2003 | | PASS |
|
|
|
Verify building backflow protection
|
Routing Off Site - C.D.H | 6/30/2003 | | 7/10/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/10/2003 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2003 | | FAIL |
|
|
|
called Curt with Stan Coles office and let them know that we need CDH to sign off. Placed in hold box.
|
Application received | | | 6/27/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/27/2003 | | DONE |
|
|
|
|
Fee Review-notes | 6/27/2003 | 6/27/2003 | | | |
|
|
|
|