Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-01561
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 4632 N TORRIDON WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two bathroom 2100 sq. ft. single story single family dwelling with a attached 820 sq. ft. two car garage / shop and a 112 sq. ft. covered back porch. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible area will be maintained. PC#417 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/200312/18/200312/18/2003PPASS
DetailsTony Young
randy- office ###-####--call 1st for access ###-#### ralph call him 1st
BLD-Grading Inspection12/18/200312/18/200312/18/2003 PASS
DetailsRita DeYoung
Final grading and drainage is approved. Recommended to the contractor that the gutter chains be replaced with downspouts so that the roof runoff can more effectively be directed away from the foundation and into the storm drain.
DOC - Permit Finaled12/18/200312/18/200312/18/2003PPASS
DetailsTony Young
Finaled by inspector at 12/18/2003 2:35:35 PM
BLD-Energy code compliance10/10/200310/13/200310/13/2003ANR
DetailsTom Arcoraci
troy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance10/13/200310/13/200310/13/2003PPASS
DetailsJim Storey
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in10/9/200310/9/200310/9/2003PPART
DetailsSteven Webb
RANDY; Phone #: ###-#### Internet Inspection Request from: Annette Moore Corrections completed except still not ResCheck--Ok to insulate at own risk, provide ResCheck for inspector at Energy. 10/9/2003 4:24:49 PM
BLD-Framing/Rough-in10/7/200310/7/200310/7/2003PFAIL
DetailsSteven Webb
troy; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N issued--Do not insulate--Need to check for items on c./notice and energy. Air seal package had not been done at time of inspection. 10/7/2003 2:57:12 PM 10/7/2003 2:58:11 PM
BLD-Framing/Rough-in9/23/20039/24/20039/24/2003APART
DetailsTony Young
troy or ###-####///shear wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ext shear ok 9/24/2003 2:41:29 PM
BLD-Framing/Rough-in9/24/20039/24/20039/24/2003PPART
DetailsTony Young
ext shear ok, double inspection 9/24/2003 3:09:23 PM
BLD-Framing/Rough-in8/18/20038/19/20038/19/2003ANR
DetailsDave Hannah
BLD-Foundation8/19/20038/19/20038/19/2003APART
DetailsDave Hannah
BLD-Framing/Rough-in8/18/20038/18/20038/18/2003PCANC
DetailsDave Hannah
BRIAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing8/12/20038/13/20038/13/2003APART
DetailsRuss Owen
ryan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Concrete truck and pump truck now on site work is about 80% complete, Still has no report of excavation investigation from soils engineer,now 1:30 pm. This was requested by inspector 415 yesterday. I now have told them to get engineer out to site prior to pour. 8/13/2003 12:28:29 PM
BLD-Grading Inspection8/13/20038/13/20038/13/2003 PASS
DetailsRita DeYoung
Geotechnical engineer approved footing subgrade
BLD-Footing8/12/20038/12/20038/12/2003PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 8/12/2003 at 11:08:04 AM. Contact: ###-####.
need soils report 8/12/2003 2:58:10 PM
Inspection Record Card- Bld  8/5/2003 DONE
Issue & PRINT permit  8/5/2003 DONE
(F) Reprint permit  8/5/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/4/2003 DONE
Plan assigned to (SAM)7/15/2003 8/4/2003 PASS
DetailsSteve Munroe
8/4/2003 09:50:53 SAM - activity updated through activity BLDA022 from case BLD03-01561.
Routing - PLAN CHECK7/11/2003 8/4/2003 DONE
Case Summary (BLD)  7/30/2003  
Plan Review Report  7/30/2003  
Plan Reviewer's activity  7/15/2003 PEND
7/15/03 14:50 I talked to Roger, the engineer. I let him know that I need footings for pony walls in two areas plus calculations for 2 foot footing. I also talked to Mark with Glancey. I let him know that I need engineering calculations for the front of the living and dining rooms since the walls are over 10' in height.
Plan assigned to (DJO)6/27/2003 7/15/2003 DONE
DetailsDan Overy
**hillside**
Routing - Erosion and Sediment7/10/2003 7/10/2003 PASS
ESC approved with conditions attached to plans.
Routing - FIRE7/10/2003 7/10/2003 DONE
No fire sprinklers required (Highlands Hackberry #4)
Routing - PLANNING7/7/2003 7/10/2003 PASS
Routing - PUBLIC WORKS GRADING6/27/2003 7/7/2003 PASS
DetailsRita DeYoung
APPROVED AS CATEGORY 3 WITH CONDITIONS OFAPPROVAL IN LETTER FROM BOISE PUBLIC WORKS ATTACHED TO THE PLANS
Routing - PUBLIC WORKS7/7/2003 7/7/2003 PASS
NORTHWEST BOISE SEWER DISTRICT
Plan resubmittals received  7/1/2003 DONE
four copies of a Erosion and Sediment Control plan and put with plans in PW grading.
Application received  6/27/2003