Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD03-01565
StatusFinaled
Name GABRIELLI BUILDS INC
Site Address 2371 E EASTDALE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3722 sq. ft. two story single family dwelling (2581 sq. ft. first floor/1141 sq. ft. second floor) with a attached 868 sq. ft. three car garage. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible area will be maintained. PC#466 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/3/20042/4/20042/4/2004APASS
DetailsSteven Webb
tony; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C. of C issued. 2/4/2004 11:12:34 AM
DOC - Permit Finaled2/4/20042/4/20042/4/2004APASS
DetailsSteven Webb
Finaled by inspector at 2/4/2004 11:12:39 AM
BLD-Final2/3/20042/3/20042/3/2004PFAIL
DetailsSteven Webb
tony ; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N posted. 2/3/2004 1:43:02 PM
BLD-Grading Inspection2/3/20042/3/20042/3/2004 PASS
DetailsRita DeYoung
Final grading and drainage approved
BLD-Final2/2/20042/2/20042/2/2004PFAIL
DetailsDave Hannah
tony ; Phone #: ###-#### Internet Inspection Request from: Annette Moore landings at ext doors 2/2/2004 4:28:24 PM
BLD-Final1/28/20041/29/20041/29/2004AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/28/2004 at 12:57:38 PM. needs terry recordes sign off on inspection done 1/29/2004 11:20:01 AM
BLD-Final1/28/20041/29/20041/29/2004AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/28/2004 at 12:57:38 PM. needs terry recordes sign off on inspection done 1/29/2004 11:20:01 AM
BLD-Energy code compliance11/12/200311/13/200311/13/2003APASS
DetailsDave Hannah
ok to cover 11/13/2003 9:13:55 AM
BLD-Energy code compliance11/12/200311/12/200311/12/2003PCANC
DetailsRuss Owen
tony; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieout of time 11/12/2003 12:21:19 AM
BLD-Framing/Rough-in11/7/200311/7/200311/7/2003PPASS
DetailsDave Hannah
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes c/n items completed ok to insulate 11/7/2003 12:26:27 PM
BLD-Framing/Rough-in11/5/200311/6/200311/6/2003AFAIL
DetailsDave Hannah
Jess; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes do not insulate need to install foam seal package c/n on site 11/6/2003 11:51:27 AM
BLD-Framing/Rough-in10/27/200310/27/200310/27/2003PPART
DetailsDave Hannah
shear nail jeff-- ###-####ok to cover ext 10/27/2003 5:41:33 AM
BLD-Foundation9/4/20039/5/20039/5/2003PPART
DetailsTony Young
DAVE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
wip 9/5/2003 1:53:38 PM
BLD-Footing9/2/20039/3/20039/3/2003APART
DetailsTony Young
DAVE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
wip per 316 9/3/2003 10:25:59 AM
BLD-Footing8/29/20039/2/20039/2/2003ACANC
DetailsDave Hannah
DAVE; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Disp set to [CANC] by a contractor via Hello! on Sep 2 2003 7:22AM.
BLD-Grading Inspection8/28/20038/28/20038/28/2003 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer
Issue PAID IN FULL permit  8/25/2003 DONE
Inspection Record Card- Bld  8/14/2003 DONE
Print Occupancy Form  8/14/2003 DONE
Telephone call  8/14/2003 DONE
permit ready and fees due
Plan assigned to (SAM)8/8/2003 8/13/2003 PASS
DetailsSteve Munroe
8/13/2003 15:33:26 SAM - activity updated through activity BLDA022 from case BLD03-01565.
Case Summary (BLD)  8/13/2003  
Plan Review Report  8/13/2003  
PLANS/APPL TAKEN TO FRONT DESK  8/13/2003 DONE
Routing - PLAN CHECK8/5/2003 8/13/2003 DONE
Plan assigned to (DJO)6/27/2003 8/8/2003 DONE
DetailsDan Overy
**hillside**
Routing - PLANNING8/4/2003 8/5/2003 PASS
Per updated site plan. Driveway limited to 33' in front setback. AKT
Routing - Erosion and Sediment7/31/2003 8/1/2003 PASS
ESC plan approved with attached conditions.
Routing - FIRE8/1/2003 8/1/2003 DONE
No fire sprinklers are required. (Nativa Terrace Block 2, Lot 2).
Routing - PUBLIC WORKS GRADING7/25/2003 7/25/2003 PASS
DetailsRita DeYoung
Approved revised grading plan with driveway that is approvable by P&Z. However, architectural site plan must still be revised.
Routing - PLANNING7/8/2003 7/10/2003 PEND
Conversation w/ Tony: need corrected site plan & driveway limited to 33' in front setback. AKT 7/28 Another call requested corrected site plan.
Routing - PUBLIC WORKS7/7/2003 7/8/2003 PASS
Routing - PUBLIC WORKS GRADING6/27/2003 7/7/2003 PASS
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter from Boise Public Works attached to the plan
Application received  6/27/2003