Permit Information
Permit NumberBLD03-01568
StatusFinaled
Name NCR
Site Address 670 E RIVERPARK LN Unit: 400
Project NameRIVER RUN CENTER
Customer Number 
ePlanReviewNo
Description
(NCR - RIVER RUN CENTER - BLDG E - SUITE 400) This building is NOT fire sprinklered. To remodel an existing 2,120 square foot tenant space for a new tenant (testing and research). Some interior nonstructural walls are being removed under this permit. Work is to include interior nonbearing walls and doors all per the approved drawings and plan review report on file. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/23/2014 DONE
First Notice 9/3/20039/3/2003 DONE
Permanent occupancy UNPAID FEE  9/3/2003 DONE
Perm. Occ. Cert. #9781 issued 9-3-03 to NCR.
Permanent Occupancy 9/2/20039/2/2003 DONE
Details
BLD-Final9/2/20039/2/20039/2/2003PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/2/2003 at 9:07:59 AM. Contact: ###-####.final ok
9/2/2003 3:15:55 PM
FIRE-Final Inspection8/28/20038/29/20038/29/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/28/2003 at 3:46:36 PM. Contact: ###-####. will have the key lock removed from double door for structrual inspector; detectors okay for AHU shutdown 8/29/2003 1:43:37 PM
BLD-Final8/28/20038/29/20038/29/2003PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/28/2003 at 3:47:09 PM. Contact: ###-####. dead bolt door 8. 8/29/2003 3:25:59 PM
FIRE-Final Inspection8/18/20038/19/20038/19/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/18/2003 at 3:16:19 PM. Contact: ###-####. door #8 must be openable from the inside without special knowledge; need to verify AHU's if they are over 2000 CFM and if so then a duct detector is required for AHU shutdown 8/19/2003 10:26:25 AM
BLD-Final8/18/20038/19/20038/19/2003PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/18/2003 at 3:17:51 PM. Contact: ###-####.denis called and cancled. 8/19/2003 1:31:52 PM
BLD-Framing/Rough-in8/7/20038/8/20038/8/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 8/7/2003 at 8:30:46 AM. Contact: ###-####....brace walls to deck, need elec walls ok 8/8/2003 10:42:31 AM
Issue PAID IN FULL permit  7/31/2003  
Plan assigned to (CJW)7/2/2003 7/30/2003 PASS
DetailsCarl Westfall
7/30/2003 08:46:22 CJW - activity updated through activity BLDA022 from case BLD03-01568.
Routing - PLAN CHECK7/30/2003 7/30/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/30/2003 PASS
Inspection Record Card- Bld  7/30/2003 DONE
Print Occupancy Form  7/30/2003 DONE
Telephone call  7/30/2003  
permit ready and fees due
Routing - FIRE7/28/2003 7/29/2003 PASS
Routing - PLAN CHECK7/7/2003 7/28/2003 PASS
IBC plan review started July 25, 2003 and finished July 28, 2003. The drawings were approved with conditions. See the plan review report.
Routing - PUBLIC WORKS7/2/2003 7/7/2003 PASS
Verify address (suite number).
Application received  6/27/2003  
Recd Pcfee & Taken To Pln CK  6/27/2003 DONE
Fee Review-notes6/27/20036/27/2003