Permit Information
Permit NumberBLD03-01609
StatusExpired
Name MERIDIAN JOINT SCHOOL DIST NO 2
Site Address 11851 W MUSKET CT
Project NameSchool (Frontier Elementary)
Customer Number 
ePlanReviewNo
Description
(Frontier Elementary School)(Relocation of drainage facilities in Parking lot) * The scope of the project consists of removing a section of existing curb and gutter, placing a slurry seal on the existing parking lot behind the school, small sections of pavement repair and the installation of a gravel swale. The gravel swale is being implemented south of the parking lot to contain stormwater runoff that currently collects and ponds in this area. All per engineered plans on file as approved by the Public Works department. Not buildings to be demolished, installed or constructed under this permit. Site utilities included in this permit. PC#379-03
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/14/20051/14/20051/14/2005 DONE
No final inspection, drive-by shows complete. 1/14/05 R.Rokovitz
BLD-Aging Inspection3/25/20043/25/20043/25/2004 CANC
DetailsTom Arcoraci
DOC - Permit Expired3/25/20043/25/20043/25/2004APASS
DetailsTom Arcoraci
Expired by inspector at 3/25/2004 8:46:01 AM
Issue PAID IN FULL permit  7/24/2003 DONE
Telephone call  7/17/2003 DONE
left mess that permit is ready
Routing - Erosion and Sediment7/16/2003 7/16/2003 PASS
Rita, re-route to Planning to sign off. ESC approved with conditions attached to plans.
Print Pending Permit.LaserJet4  7/16/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/16/2003 DONE
Plan assigned to (KMM)7/3/2003 7/16/2003 PASS
DetailsKathy Miller
7/16/2003 11:07:15 KMM - activity updated through activity BLDA022 from case BLD03-01609.
Routing - PLAN CHECK7/16/2003 7/16/2003 DONE
Routing - FIRE7/10/2003 7/15/2003 PASS
Plan resubmittals received  7/15/2003 DONE
Received two copies of revised sheet 1 of 1 and narrative. Put with plans. kmm
Routing - PLANNING7/9/2003 7/10/2003 PASS
No requirements per P&Z
Routing - PUBLIC WORKS7/3/2003 7/9/2003 PASS
Routing - Erosion and Sediment7/9/2003 7/9/2003 FAIL
Waiver request not approved. A ESC plan is needed. Contacted Toothman-Orton
Plan routing begun/TENANTS  7/3/2003 DONE
Application received  7/3/2003  
Plans ACCEPTED BY PLAN TECH  7/3/2003 DONE
Routing - PLANNING Land Div7/3/2003 7/3/2003 PASS
Approved. Site is over 5 acres in size.