BLD-Conference | 8/4/2004 | 8/6/2004 | 8/6/2004 | P | PART |
Tony Young
|
|
|
bill ###-####
front stair issues 8/6/2004 2:39:11 PM
|
DOC - Permit Finaled | 2/2/2004 | 2/2/2004 | 2/2/2004 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 2/2/2004 8:47:36 AM
|
BLD-Final | 1/28/2004 | 1/29/2004 | 1/29/2004 | P | PASS |
Tony Young
|
|
|
frank ###-####
|
BLD-Final | 1/28/2004 | 1/28/2004 | 1/28/2004 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/28/2004 at 5:45:39 AM. Contact: ###-####.
|
BLD-Final | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PART |
Tony Young
|
|
|
###-#### frank
conf. only,,, need f/p finished 1/28/2004 2:52:52 PM
|
BLD-Grading Inspection | 1/15/2004 | 1/15/2004 | 1/15/2004 | | BND |
Rita DeYoung
|
|
|
Grading and drainage has been completed. However, the contractor built some retaining walls that were not on the approved plans. These walls must be approved by a Hillside Development application. The engineer has recommended a $1500.00 bond to replace the walls and grade as originally approved. Upon receipt of the bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | PASS |
Tony Young
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Tony Young
|
|
|
Frank; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted, ok to insulate 11/3/2003 2:57:30 PM
|
BLD-Framing/Rough-in | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Tony Young
|
|
|
Frank; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
conf only, need plans and truss engineering 10/31/2003 1:36:44 PM
|
BLD-Framing/Rough-in | 10/10/2003 | 10/13/2003 | 10/13/2003 | A | PART |
Tom Arcoraci
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok to side 10/13/2003 9:53:29 AM
|
BLD-Foundation | 8/15/2003 | 8/15/2003 | 8/15/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 7:09:29 AM. Contact: ###-####.
|
BLD-Footing | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 3:22:47 PM. Contact: ###-####.
|
BLD-Grading Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer provided that all loose material is removed from the footing excavation.
|
Issue PAID IN FULL permit | | | 8/1/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/25/2003 | | 7/31/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/28/2003 | | 7/31/2003 | | PASS |
Steve Munroe
|
|
|
7/31/2003 10:57:24 SAM - activity updated through activity BLDA022 from case BLD03-01615.
|
Plan Review Report | | | 7/31/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 7/31/2003 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2003 | | DONE |
|
|
|
|
Telephone call | | | 7/31/2003 | | DONE |
|
|
|
called and told permit is ready and fees amount
|
Pending Assignment by DJO | 7/3/2003 | | 7/28/2003 | | DONE |
Dan Overy
|
|
|
7/28/2003 15:52:42 SAM - activity updated through activity BLDA183 from case BLD03-01615.
|
Routing - Erosion and Sediment | 7/24/2003 | | 7/25/2003 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 7/22/2003 | | 7/24/2003 | | PEND |
|
|
|
Plan review not done. Routed to ESC after resubmittals received.
|
Plan resubmittals received | | | 7/24/2003 | | DONE |
|
|
|
ESC plans resubmitted and forwarded to Jim Rogers.
|
Routing - FIRE | 7/21/2003 | | 7/22/2003 | | DONE |
|
|
|
No fire sprinklers required (Cartwright Canyon)
|
Routing - Erosion and Sediment | 7/18/2003 | | 7/21/2003 | | FAIL |
|
|
|
ESC plan incomplete-need fold out blueprint, etc. Refer to Appendix A and C of plan design manuel.
|
Routing - PLANNING | 7/11/2003 | | 7/18/2003 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/11/2003 | | 7/11/2003 | | PASS |
|
|
|
NORTHWEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 7/3/2003 | | 7/10/2003 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to the plans
|
Application received | | | 7/3/2003 | | |
|
|
|
|