First Notice | | 9/26/2003 | 9/26/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/26/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9812 issued 9-26-03 to Proctor and Gamble on 2nd floor of the River Quarry Bldg. C.
|
Permanent Occupancy | | 9/25/2003 | 9/25/2003 | | DONE |
|
|
|
|
BLD-Final | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 2:47:15 PM. Contact: ###-####.perm. occ. ok pending fire sign off. 9/25/2003 10:36:59 AM
|
FIRE-Final Inspection | 9/25/2003 | 9/25/2003 | 9/25/2003 | A | PASS |
Rick Jackson
|
|
|
|
FIRE-Final Inspection | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/25/2003 at 8:39:21 AM. Contact: ###-####.
|
FIRE-Final Inspection | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 2:46:31 PM. Contact: ###-####. fire/life safety on temp occupancy per Dave Miller pending fire alarm sync module installed 9/24/2003 5:07:25 PM
|
BLD-Final | 9/23/2003 | 9/24/2003 | 9/24/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 2:47:15 PM. Contact: ###-####. waiting for fire final.rolled over am. 9/24/2003 4:27:41 PM
|
BLD-Framing/Rough-in | 9/2/2003 | 9/2/2003 | 9/2/2003 | P | PART |
Jim Storey
|
|
|
17. (Sheet A2.0 – Door 27A - Door encroachment) Doors opening into the path of egress travel shall
not reduce the required width to less than one-half during the course of the swing. When fully open, the
door shall not project more than 7 inches into the required width. (2000 IBC 1003.2.3.1)/ maintane ceilling to 1 hr corridor/
|
Routing - PLAN CHECK | 8/28/2003 | | 8/28/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/28/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/28/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/28/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2003 | | DONE |
|
|
|
permit ready and fees due
|
Issue PAID IN FULL permit | | | 8/28/2003 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/10/2003 | | 8/28/2003 | | PASS |
Carl Westfall
|
|
|
8/28/2003 14:31:29 CJW - activity updated through activity BLDA022 from case BLD03-01618.
|
Routing - FIRE | 8/21/2003 | | 8/28/2003 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/11/2003 | | 8/21/2003 | | PASS |
|
|
|
IBC plan review started July 30, 2003. The plan review was suspended untill receipt of resubmitted drawings on August 14, 2003 correcting door swings and ventilation. Drawings approved with clarifications after final review.
|
Plan resubmittals received | | | 8/14/2003 | | DONE |
|
|
|
letter of transmittal with two sets of A1.0, A2.0 one sheet of M1.1 taken to Carl
|
Plan resubmittals received | | | 7/22/2003 | | DONE |
|
|
|
recieved two copies of revised sheetsA0.0, A1.0, A2.0, M1.1, P1.0, E2.1P, E2.1L. One copy of response letter. Routed to Carl W. kmm
|
Routing - PUBLIC WORKS | 7/10/2003 | | 7/11/2003 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/7/2003 | | DONE |
|
|
|
|
Application received | | | 7/3/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/3/2003 | | DONE |
|
|
|
|
Fee Review-notes | 7/3/2003 | 7/3/2003 | | | |
|
|
|
|