Permit Information
Permit NumberBLD03-01629
StatusExpired
Name CISCO SYSTEMS INC
Site Address 225 N 9TH ST Unit: 500
Project NameSEDGWICK CNTR-5TH FLR
Customer Number 
ePlanReviewNo
Description
(CISCO SYSTEMS INC - SEDGWICK CENTER - SUITE 500) This building is fire sprinklered because it is a high-rise. To divide an existing 4,880 square foot office tenant space into two (2) separate office tenant spaces. These tenant spaces are located on the 5 story of a 8 story high-rise building. "Suite 500" will have a floor area of about 3,746 square feet and "Suite 510" will have a floor area of about 1,134 square feet. Cisco Systems, Inc. will continue to occupy "Suite 500". Occupancy of "Suite 510" is addressed under permit BLD03-1899. Work is to include "SMED" wall partitions, interior doors, and a new corridor door all per approved drawings and plan review conditions on file. Existing high-rise systems shall be maintained. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/27/20047/27/20047/27/2004 PASS
DetailsDave Hannah
DOC - Permit Expired7/27/20047/27/20047/27/2004APASS
DetailsDave Hannah
Expired by inspector at 7/27/2004 8:04:30 AM
Letter of compliance  9/30/2003 DONE
Letter of Compliance #24121 issued 9-30-03.
FIRE-Final Inspection9/26/20039/26/20039/26/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/26/2003 at 9:48:04 AM. Contact: ###-####.
BLD-Final9/26/20039/26/20039/26/2003PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/26/2003 at 9:48:42 AM. Contact: ###-####. ok for perm occ 9/26/2003 2:19:27 PM
BLD-Framing/Rough-in9/9/20039/10/20039/10/2003ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/9/2003 at 12:13:48 PM. Contact: ###-####. 9/10/2003 11:30:50 AM
BLD-Framing/Rough-in9/10/20039/10/20039/10/2003PPASS
DetailsDave Hannah
partion wall 9/10/2003 12:12:07 PM
BLD-Conference8/14/20038/14/20038/14/2003PPASS
DetailsCarl Dependahl
c/n issued...wip?? 8/14/2003 6:11:04 PM
Telephone call  8/13/2003 DONE
left mess that permit is ready
Issue & PRINT permit  8/13/2003 DONE
Inspection Record Card- Bld  8/12/2003 DONE
Print Occupancy Form  8/12/2003 DONE
Plan assigned to (CJW)7/10/2003 8/11/2003 PASS
DetailsCarl Westfall
8/11/2003 14:04:29 CJW - activity updated through activity BLDA022 from case BLD03-01629.
Routing - FIRE8/5/2003 8/11/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/11/2003 DONE
Routing - PLAN CHECK7/11/2003 8/5/2003 PASS
IBC plan review started August 4, 2003 and finished the next day. The drawings were approved with conditions. See the plan review report.
Routing - PUBLIC WORKS7/11/2003 7/11/2003 PASS
Plans ACCEPTED BY PLAN TECH  7/9/2003 DONE
Application received  7/7/2003 PASS
Routing - PLAN CHECK8/11/2003