Case Summary (BLD) | | | 4/19/2007 | | DONE |
|
|
|
|
Letter of compliance | | | 11/22/2006 | | DONE |
|
|
|
Letter of Compliance issued 11-22-06
|
BLD-Final | 11/16/2006 | 11/17/2006 | 11/21/2006 | A | PASS |
Dave Hannah
|
|
|
kevin ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
FIRE-Final Inspection | 11/21/2006 | 11/21/2006 | 11/21/2006 | A | PASS |
Forrest France
|
|
|
Life safety final inspection per the revised scope of work is acceptable.
|
FIRE-Final Inspection | 11/17/2006 | 11/20/2006 | 11/20/2006 | A | NH |
Forrest France
|
|
|
No access to complete inspeciton.
|
Plan Reviewer's activity | | | 10/26/2006 | | DONE |
|
|
|
10/26/06 - Contractor Kevin Michaels had reviewed the exisitng conditions above the ceiling at the designated new door location. He found a major structural element (GLB) that would have been over the new opening. Thinking this not to be a good situation he moved the door location to the north until the beam above would still have full bearing on the existing masonry wall. When he went to install the new grab bar on the wll adjacent to the toilet he found that there was no longer room to place the grab bar 54" from the finish wall behind the toilet to the end face of the grab bar. Kevin stated he could put the grab bar to the door edge side of the wood casing and have 52" to 53" maximum. I signed and dated approval of this dimension as meeting the intent of the code even though the letter of the code will be missed upto 2". Sec. 3408.6, 2000 IBC for existing buildings the 20% rule is applicable and has been applied toward modifications within existing men & womens restroom and this restroom upgrade. Work done has provided and accessible route to and into the accessible restroom, existing fixture locations were modified for compliance and the grab bars on the side and the rear provide a deffinite improvement for accessibility and use of this existing restroom as a unisex unit.
|
BLD-Framing/Rough-in | 10/6/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Dave Hannah
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wall between mop and restroom ok to cover after elec r/i
|
BLD-Framing/Rough-in | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PART |
Dave Hannah
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley area in front of ext restroom ok to cover
|
BLD-Aging Inspection | 8/18/2006 | 8/18/2006 | 8/25/2006 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 5/23/2006 | 5/23/2006 | 5/24/2006 | | PASS |
Dave Hannah
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2006 | | DONE |
|
|
|
tlk to zga secretary for permit and fees - she will call back
|
Override - Parcel Holds | | | 4/25/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/25/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/25/2006 | | |
|
|
|
|
Telephone call | | | 4/25/2006 | | DONE |
|
|
|
left mess that permit is ready
|
(F) Reprint permit | | | 4/25/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/25/2006 | | DONE |
|
|
|
paid fee and picked up permit
|
Plan assigned to (DRS) | 4/20/2006 | 4/20/2006 | 4/24/2006 | | PASS |
|
|
|
4/24/2006 16:17:03 DRS - activity updated through activity BLDA022 from case BLD03-01633.
|
Plan assigned to (DRS) | 4/17/2006 | 4/17/2006 | 4/24/2006 | | PASS |
|
|
|
4/24/2006 16:17:03 DRS - activity updated through activity BLDA022 from case BLD03-01633.
|
Routing - PLAN CHECK | 4/20/2006 | | 4/24/2006 | | PASS |
|
|
|
Plan modifications reviewed and approved for this project. Upgrade of existing his / hers restrooms done under 1991 permit were deleted from this project and the existing staff restroom is to be upgraded for full accessibility as a unisex restroom with new door to the room from the museum area. 8-1/2" x 11" details of changes are atached to plans. Plans do not have to route to any other agency to review changes.
|
Plan resubmittals received | | | 4/24/2006 | | |
|
|
|
received 1 letter of transmittal, 2 copies of remodel/toilet opening detail (2 pgs. each) and taken to Dan Stuart
|
Override - Parcel Holds | | | 4/24/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2006 | | PASS |
|
|
|
|
Telephone call | | | 4/20/2006 | | DONE |
|
|
|
Placed a phone call to Tom Zabala, architect of record for this project asking for additional structural design information for support at proposed new opening through masonry wall to proposed staff restroom upgrade. I also ask him to review the increased project cost for the original project that has been submitted as part of the plan modification application and come up with a plan showing how the 20% of the project cost is to be applied for accessibility upgrade. 20% of original project cost was $12,000.00 plus and based on the new plan mod cost this will increase to $17,000.00 plus. He needs to review overall costs with Mr. Johns and value & cost to be applied to accessibility upgrade. He is to call me back if he has questions.
|
Plan Reviewer's activity | | | 4/20/2006 | | DONE |
|
|
|
Sent e-mail to Jenifer Gilliland with copy to Marlene seeking direction on the plan modification as this was not one of the two choices given to Mr. Johns in a response to him from Jenifer on 1/10/06.
|
Plan Modification Accepted | | | 4/20/2006 | | |
|
|
|
Plan Modification excepted for BLD03-01633 for restroom upgrade
to showan upgrade for the staff restroom that transforms it into an ADA compliant public restroom with an enterance to the exhibit gallery. The existing public restrooms would remain" as is" with one exception,the original plansto alter the door ways for the public restrooms would be followed. The plans to build privacy walls in front of the doors have been modified , two of the walls are thicker. Sheet to be modified 1A Plans will be routed to Dan S.
|
BLD-Aging Inspection | 1/6/2006 | 1/6/2006 | 1/12/2006 | | PASS |
Dave Hannah
|
|
|
working on what to do with ada rest rooms
|
BLD-Aging Inspection | 10/25/2005 | 10/25/2005 | 10/25/2005 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 7/30/2004 | 7/30/2004 | 7/30/2004 | P | DONE |
Dave Hannah
|
|
|
talkrd with manager they will call me next week 8/2/2004 8:08:47 AM
|
BLD-Aging Inspection | 7/27/2004 | 7/27/2004 | 7/27/2004 | | DONE |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Rick Jackson
|
|
|
jon; Phone #: ###-#### Internet Inspection Request from: Annette Moore gate on gift shop okay and it is okay to occupy the gift shop; the restroom aren't completed and are part of this permit 11/3/2003 3:38:22 PM
|
BLD-Final | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PART |
Dave Hannah
|
|
|
jon; Phone #: ###-#### Internet Inspection Request from: Annette Moore gift shop area ok to occ 11/3/2003 2:36:13 PM
|
FIRE-Final Inspection | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | NR |
Rick Jackson
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes will be rescheduled when ready 10/31/2003 2:37:48 PM
|
BLD-Final | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | NR |
Dave Hannah
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | FAIL |
Rick Jackson
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes hardware on security grill has thumb turn; talked to Dan Stuart and he agreed jit has to be lever for door release 10/24/2003 10:11:02 AM
|
BLD-Final | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | CANC |
Dave Hannah
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Final | 10/23/2003 | 10/23/2003 | 10/23/2003 | P | NR |
Dave Hannah
|
|
|
john--; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs fire life safty final 10/23/2003 1:36:57 PM
|
BLD-Framing/Rough-in | 9/10/2003 | 9/11/2003 | 9/11/2003 | P | PASS |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore inter curved wall ok to cover 9/11/2003 1:55:01 PM
|
BLD-Conference | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | DONE |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
Issue PAID IN FULL permit | | | 8/12/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2003 | | PASS |
|
|
|
Approved as noted on and attached plan review conditions as part of the approved plans taken to permit desk for issuance of the permit.
|
Inspection Record Card- Bld | | | 8/8/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2003 | | DONE |
|
|
|
Left message permit ready and fees due with Jeffery Johns
|
Plan assigned to (DRS) | 7/16/2003 | | 8/8/2003 | | PASS |
Dan Stuart
|
|
|
8/8/2003 11:26:32 DRS - activity updated through activity BLDA022 from case BLD03-01633.
|
Routing - PLAN CHECK | 7/18/2003 | | 8/8/2003 | | PASS |
|
|
|
NO RESUBMITTALS REQUIRED. ITEMS IN QUESTION WERE RED-LINED ON PLANS PER AGREEMENT WITH TOM ZABALA, ARCHITECT OF RECORD. ON 8/7/03 I DISCUSSED CONCERNS ABOUT ACCESSIBILITY HEIGHT OF CASHIER CHECK OUT COUNTER IN RETAIL AREA AND THE COUNTER AND TICKET SALES AND NEED TO MEET MAXIMUM 36" HEIGHT & LENGTH REQUIREMENTS PER ICC/ANSI A117.1-98 SECTION 904. TO BE VERIFIED IN FILED FOR COMPLIANCE WITH NOTES ON PLANS.
PLANS CALLED FOR SUPPORTING THE 357 POUND COILING GRILL BY THE GRILLE GUID RAILS. THESE ARE NOT STRUCTURAL. I REVIEWED WITH TOM ZABALA WHO SAID THIS WAS AN ERROR. THE UNIT WILL BE SECURED TO THE 2 X 12 HEADER PER MANUFACTURE'S INSTALATION REQUIREMENTS AND IS TOL BE REVIEWED BY TOM IN THE FIELD TO VERIFY ATTACHMENT METHOD IS SATISFACTORY. Other items noted in plans review comments & conditions are to be field verified by the approriate field inspectors.
|
Routing - FIRE | 8/8/2003 | | 8/8/2003 | | PASS |
|
|
|
Visited with Sam Rogers concernig scope of project. Okay to issue permit with comment in body of permit stating 'field approval by fire inspector is required as a condition of this permit'. This is being done to expedite the issuance of permit based on declared scope of work by architect and owner/tenant.NOTE MADE ON SIGNATURE LINE FOR APPROVAL AS WELL AS IN PERMIT BODY.
|
Telephone call | | | 8/7/2003 | | DONE |
|
|
|
Called Tom Zabal, ZGA Architects to discuss note on plan concerning the guide rails of the overhead grille being the supporting elements for the coil support system. These are not generally considered a structural support item only for conrol & guideance of grille. Tom said probably a description error, that the plans & notes were provide by others. We agreed I would red-line plan and they would attach the coil support to the header above the opening with his verification of attachment compliance in field if needed.
Ialso discussed the 36" counter height for accessibility compliance per section 904.3, ICC/ ANSI A117.1-98 for the ticket counter serving museum & sales counter in retail area. I will also red-line this on the drawings for verification in the field.
|
Routing - PUBLIC WORKS | 7/16/2003 | | 7/18/2003 | | NR |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/15/2003 | | DONE |
|
|
|
received three signed A2 sheets and inserted into plans
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2003 | | FAIL |
|
|
|
Requires sheet A2 to be stamped and signed. Contacted Jeffrey Johns at ###-#### of this need. kmm
|
Application received | | | 7/8/2003 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/8/2003 | | DONE |
|
|
|
|
Fee Review-notes | 7/8/2003 | 7/8/2003 | | | |
|
|
|
|