BLD-Final | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Dave Hannah
|
|
|
JEFFERY ###-#### ok to go perm 2/12/2004 9:16:50 AM
|
Letter of compliance | | | 2/12/2004 | | DONE |
|
|
|
Letter of Compliance issued 2-12-04.
|
FIRE-Final Inspection | 2/10/2004 | 2/10/2004 | 2/10/2004 | P | PASS |
Rick Jackson
|
|
|
fire/life safety final okay 2/10/2004 4:00:01 PM
|
Plan resubmittals received | | | 1/14/2004 | | |
|
|
|
|
BLD-Energy code compliance | 10/30/2003 | 10/31/2003 | 10/31/2003 | P | CANC |
Dave Hannah
|
|
|
Tony; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIRE-Final Inspection | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | PART |
Rick Jackson
|
|
|
TONY; Phone #: ###-#### Internet Inspection Request from: Annette Moore per Dave Miller this will be on temp occupancy for fire alarm work that is programmed for the entire floor 10/31/2003 2:36:05 PM
|
FIRE-Final Inspection | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Dave Hannah
|
|
|
|
BLD-Final | 10/31/2003 | 10/31/2003 | 10/31/2003 | P | PART |
Dave Hannah
|
|
|
ok for temp occ ok for perm after fire oks for perm
|
Temporary occupancy | | | 10/31/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #5016 issued 10-31-03 to Washington Mutual.
|
Telephone call | | | 9/24/2003 | | DONE |
|
|
|
Received telephone call from Roger Larson, WM fac's mgr asking whether they could occupy part of the TI area. I checked with Rick and confirmed AS is okay in all areas but alarm is deficient in training room (strobe required). Checked with Dave Miller who said he was not willing to approve partial occupancy of the project area until the alarm issues are resolved. He now has correspondence from Larry Hansen and Chris Stroh on his desk for review, which may resolve the alarm issues; if so, he would then reconsider their request for occupying before the alarm work is completed. Until then, Dave says no occupancy is approved for the newly created office or modified conference room. Advised Roger of that poistion and gave him Dave Miller's ph# if he wishes to pursue further.
|
Telephone call | | | 9/5/2003 | | DONE |
|
|
|
I had a telcon today with Chris Stroh, Hammock Mgt for WM bldg. She wanted approval for TOC on their two TI's based on a promise to complete the alarm work. I explained that approval had to be given by the Fire Marshall's office, contact Dave Miller. However, she indicated they can't let the contract with Simplex for the interconnection of the two panels without Capital Terrace's, approval which Simplex says Larry Hansen, Mgr for Captial Terrace, won't give. I referred her to Larry Hansen to discuss the panel interconnection issue directly with him. I pointed out that Simplex has also not submitted a FA permit application for this TI project or for the Prohaska residential TI project, and that the FD will most likely expect contracts to be let and plans submitted for the necessary work before they would consider approving a TOC for a permit. I referred her to Simplex to find out why they haven't submitted plans for the alarm work associated with each of the two TI projects in WM's side (The WM conf room and the Prohaska residential unit).
|
FIRE-Sprinkler Rough-in | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/27/2003 at 11:50:41 AM. Contact: ###-####. sprinklers okay to cover; need alarm plan submittals for new strobe in training room and interconnection to west building per plan review notes 8/29/2003 5:09:58 AM
|
Telephone call | | | 8/26/2003 | | DONE |
|
|
|
Telcon with Joe Crisci, Greer Const., San Diego, CA, one of owners of the WM Plaza Corp. He has copies of my 2/11/02 letter and attachments. I explained the interconnection requirement; he has been in touch with Chris Stroh at Hannock and with Chris Willis at Simplex and is trying to get all the parties moving to get this interconnection done ASAP. I pointed out that we have not received a FA permit application which is required in conjuction with this TI permit. The sprinkler plans are in so, they need to follow-up ASAP with whoever the alarm contractor is to avoid a delay in occupancy.
|
BLD-Wall cover | 8/19/2003 | 8/20/2003 | 8/20/2003 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 8:29:08 AM. Contact: ###-####....walls ok 8/21/2003 10:01:15 AM
|
Issue PAID IN FULL permit | | | 8/15/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/14/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 8/11/2003 | | 8/13/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2003 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 7/11/2003 | | 8/13/2003 | | PASS |
Carl Westfall
|
|
|
8/13/2003 10:59:18 CJW - activity updated through activity BLDA022 from case BLD03-01636.
|
Routing - FIRE | 8/5/2003 | | 8/11/2003 | | PASS |
|
|
|
Approved subject to conditions. Interconnection of the existing WM FAC panel with the newly installed Capital Terrace FAC panel is required. Review comments faxed to architect.
|
Routing - PLAN CHECK | 7/11/2003 | | 8/5/2003 | | PASS |
|
|
|
IBC plan review started August 5, 2003 and finished the same day. The drawings were approved with conditions. See the plan review report. (A report was NOT sent to the architect).
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2003 | | DONE |
|
|
|
1. Received owners signature 7/9/03
2. Received applicant's signature required on involved parties sheet.7/9/03
3. No vicinity map.
4. No Energy Code documents/information. (Called Tony O'Neil-per Carl W. "Energy Code compliance was not necessary for these minor changes". I informed Tony to be more specific and notate on application in the future.
5. Plans not fully dimensioned.
6. Faxed Design Professional and Involved Parties sheet to Tony O'neill and he will fax back completed information.
7. No building code data except "2000 IBC".
|
Application received | | | 7/8/2003 | | |
|
|
|
|